Landmark Infrastructure
InfoBeans Interview Questions and Answers
Q1. Which type of material used to stop the collapse of soil?
Geotextiles and geogrids are commonly used materials to stop the collapse of soil.
Geotextiles are permeable fabrics made of synthetic fibers that are used to stabilize soil and prevent erosion.
Geogrids are high-strength polymer grids that are used to reinforce soil and provide stability.
Other materials such as gabions, retaining walls, and soil nails can also be used to prevent soil collapse.
The choice of material depends on the type of soil, the slope angle, and the amount o...read more
Q2. How to transfer TBM in Survey through Auto level?
To transfer TBM in Survey through Auto level, follow these steps:
Set up the Auto level at a known point
Measure the height of the Auto level
Measure the height of the TBM
Calculate the difference between the two heights
Add or subtract the difference to the TBM height to get the correct elevation
Repeat the process for all TBMs in the survey
Q3. What is is pile and pile foundation?
A pile is a long cylindrical structure made of concrete, steel or wood that is driven into the ground to support a building or structure.
Pile foundation is a type of deep foundation used to transfer the load of a structure to a deeper and stronger soil or rock layer.
Piles can be made of concrete, steel, or wood and are driven into the ground using specialized equipment.
Pile foundations are commonly used in areas with weak soil or where the structure is heavy and requires addi...read more
Q4. Why pile foundation is provided?
Pile foundation is provided to transfer the load of the structure to a deeper and stronger soil or rock layer.
To support heavy structures on weak or compressible soil
To resist lateral loads such as wind or earthquake
To prevent settlement of the structure
To reduce the effect of vibrations on the structure
Examples: high-rise buildings, bridges, offshore structures
Q5. What is RL, FS, BS, HI IN SURVEY.
RL, FS, BS, HI are common surveying terms.
RL stands for Reduced Level and is the vertical distance between a point and a datum.
FS stands for Foresight and is the distance from the instrument to the point being surveyed.
BS stands for Backsight and is the distance from the instrument to a point of known elevation.
HI stands for Height of Instrument and is the elevation of the instrument above the datum.
Q6. BBS OF PILE AND PILE CAP
BBS of pile and pile cap refers to the bar bending schedule of the reinforcement steel used in the construction of piles and pile caps.
BBS includes details such as the diameter, length, and spacing of the steel bars used in the construction.
It is important to follow the BBS accurately to ensure the structural integrity of the piles and pile caps.
The BBS is usually prepared by the structural engineer and is based on the design requirements.
The BBS should be reviewed and approv...read more
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month