Plant modification process involves planning, design, approval, implementation, and documentation.
Initial assessment of plant needs and feasibility of modification
Designing the modifications with input from engineers and stakeholders
Obtaining necessary approvals from regulatory bodies
Implementing the modifications with proper supervision
Documenting the entire process for future reference
Different statuses and revisions of drawings include preliminary, approved, issued, and as-built.
Preliminary drawings are initial drafts that may undergo multiple revisions before being approved.
Approved drawings have been reviewed and accepted for use.
Issued drawings are distributed to relevant parties for construction or reference.
As-built drawings reflect the final state of a project after construction is completed.
The final status of a drawing is typically marked as 'Approved' or 'Released'.
Final status of drawing is usually 'Approved' or 'Released'
Once a drawing is approved, it is considered final and can be used for construction or manufacturing
The final status indicates that the drawing has been reviewed and accepted for use
Top trending discussions
based on 14 reviews
Rating in categories
Senior Engineer
5.3k
salaries
| ₹5 L/yr - ₹17 L/yr |
Engineer
4.7k
salaries
| ₹1 L/yr - ₹8.7 L/yr |
Technical Lead
2k
salaries
| ₹8.5 L/yr - ₹28 L/yr |
Project Lead
1.6k
salaries
| ₹6 L/yr - ₹22.1 L/yr |
Senior Software Engineer
1.4k
salaries
| ₹4.8 L/yr - ₹18.8 L/yr |
TCS
Infosys
Wipro
Tech Mahindra