Upload Button Icon Add office photos

Filter interviews by

KLJ GROUP Electrical Technician Interview Questions and Answers

Updated 20 Mar 2022

KLJ GROUP Electrical Technician Interview Experiences

1 interview found

Round 1 - Technical 

(2 Questions)

  • Q1. 1. Full details of motor name plate and transformer.
  • Ans. 

    The motor nameplate provides important information about the motor, such as its power rating, voltage, current, and efficiency. The transformer nameplate contains details about the transformer's capacity, voltage ratio, impedance, and cooling method.

    • Motor nameplate includes power rating, voltage, current, and efficiency

    • Transformer nameplate contains capacity, voltage ratio, impedance, and cooling method

    • Motor nameplate ...

  • Answered by AI
  • Q2. 2. Explain off load and on load oltc and rtcc panel
  • Ans. 

    Off load and on load OLTC and RTCC panels are used in electrical systems for voltage regulation and control.

    • Off load OLTC panel is used to change the tap position of the transformer when it is not energized.

    • On load OLTC panel is used to change the tap position of the transformer while it is energized.

    • RTCC (Remote Tap Changing Control) panel is used to remotely control the tap changing operation of the transformer.

    • Off l...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic technical knowledge is must

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(9 Questions)

  • Q1. How meny starter use in your company
  • Ans. 

    The number of starters used in our company varies depending on the specific projects and requirements.

    • The number of starters used in our company is not fixed and can vary from project to project.

    • We use starters for various electrical equipment such as motors, pumps, and compressors.

    • The quantity of starters required depends on the size and complexity of the electrical systems.

    • We follow industry standards and guidelines ...

  • Answered by AI
  • Q2. How mey generators in your company
  • Ans. 

    There are 10 generators in our company.

    • Our company has invested in 10 generators for power backup.

    • The generators range from 50kVA to 500kVA.

    • Regular maintenance and testing is conducted to ensure their proper functioning.

    • The generators are strategically placed in different locations to ensure uninterrupted power supply.

  • Answered by AI
  • Q3. 500kva And 310kva and 320 kva to kirlosker and ine Cummins Generator in my compeny
  • Q4. All Generator desal capacity in tank
  • Ans. 

    The generator desal capacity in tank is not provided.

    • Answered by AI
    • Q5. 5000 litter capacity in main tank and 500 kva 700 litters and 320 kva 600 litters and 310 kva 600 litters
    • Ans. 

      The question seems incomplete and unclear.

      • The question lacks context and details.

      • It is unclear what is being asked.

      • More information is needed to provide an answer.

      • The given information is not sufficient to solve the problem.

    • Answered by AI
    • Q6. How much desal construction in 1 hour
    • Ans. 

      The question is unclear and lacks context. Please provide more information.

      • The question needs clarification on what is meant by 'desal construction'

      • It is unclear if the question is asking for the amount of construction completed in an hour or the amount of construction that can be completed in an hour

      • More information is needed on the specific project or location being referred to

    • Answered by AI
    • Q7. 500 kva 1 hour 80to90 litters loed 400 a kw 200
    • Q8. How much concetend loed in your comeny
    • Q9. 1250 4 department all motors hp in all loed
    Round 3 - Technical 

    (3 Questions)

    • Q1. Transformer how much winning inside and
    • Ans. 

      The number of windings inside a transformer depends on its design and purpose.

      • The primary winding is connected to the input voltage source.

      • The secondary winding is connected to the load.

      • Transformers can have multiple windings for different voltage levels or phases.

      • The number of turns in each winding determines the voltage ratio of the transformer.

      • For example, a step-up transformer may have more turns in the secondary w...

    • Answered by AI
    • Q2. Conceting loed in your company
    • Q3. 900 to 2 tarnsfoemers 400 and 500

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Im in elacrical licence holder in wirman ilsense I'm complete diploma EEE work experience in 5 years in HML tea factory eny job I'm coming in your company. honest work more than sccusue... And smart work development your skills.. Hard work provided your shelf..
    Interview experience
    4
    Good
    Difficulty level
    Moderate
    Process Duration
    Less than 2 weeks
    Result
    Selected Selected

    I applied via Recruitment Consulltant and was interviewed before Aug 2023. There was 1 interview round.

    Round 1 - Technical 

    (3 Questions)

    • Q1. What's the motor and working?
    • Ans. 

      The motor is a device that converts electrical energy into mechanical energy to perform work.

      • A motor consists of a rotor and a stator, with the rotor rotating inside the stator.

      • Motors can be AC (alternating current) or DC (direct current) depending on the type of power source.

      • Common types of motors include induction motors, synchronous motors, and brushed or brushless DC motors.

      • Motors are used in various applications s...

    • Answered by AI
    • Q2. How to power system?
    • Ans. 

      Power system can be powered using various sources such as electricity from the grid, generators, solar panels, or batteries.

      • Power system can be connected to the grid to receive electricity from a utility company.

      • Generators can be used as a backup power source in case of outages or in remote locations.

      • Solar panels can be installed to harness energy from the sun and power the system.

      • Batteries can store excess energy for ...

    • Answered by AI
    • Q3. About your previous job responsibility.

    I was interviewed in May 2022.

    Round 1 - Assignment 

    I'm going to be a long day

    Round 2 - Technical 

    (1 Question)

    • Q1. I'm going to be a long day
    Round 3 - Technical 

    (1 Question)

    • Q1. I'm going to be a good day
    • Ans. I'm going to be a good
    • Answered Anonymously
    Round 4 - Technical 

    (1 Question)

    • Q1. I'm going to be a long day

    Interview Preparation Tips

    Interview preparation tips for other job seekers - I'm a long day for me and I will be a long day
    Interview experience
    5
    Excellent
    Difficulty level
    -
    Process Duration
    -
    Result
    Selected Selected
    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
    View all tips
    Round 2 - Technical 

    (2 Questions)

    • Q1. HT and LT system
    • Q2. Motor Starter, Transformer,
    Interview experience
    3
    Average
    Difficulty level
    Moderate
    Process Duration
    Less than 2 weeks
    Result
    No response

    I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.

    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
    View all tips
    Round 2 - Technical 

    (2 Questions)

    • Q1. Generator protection
    • Q2. Transformer maintenance

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Keep clear concept about electrical protection, what is need and how they work

    I applied via Referral and was interviewed in Jan 2023. There were 3 interview rounds.

    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
    View all tips
    Round 2 - HR 

    (1 Question)

    • Q1. Tell about your self What is your persent CTC Why ur changing job
    Round 3 - Technical 

    (1 Question)

    • Q1. Transformers,ct pt,CMD,drives,plc

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be your self .share what ever you know.don't get tensed and say lies.
    Interview experience
    5
    Excellent
    Difficulty level
    Moderate
    Process Duration
    Less than 2 weeks
    Result
    Selected Selected

    I applied via Job Fair and was interviewed in Feb 2023. There were 3 interview rounds.

    Round 1 - Resume Shortlist 
    Pro Tip by AmbitionBox:
    Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
    View all tips
    Round 2 - Technical 

    (9 Questions)

    • Q1. How meny starter use in your company
    • Ans. 

      The number of starters used in our company varies depending on the specific projects and requirements.

      • The number of starters used in our company is not fixed and can vary from project to project.

      • We use starters for various electrical equipment such as motors, pumps, and compressors.

      • The quantity of starters required depends on the size and complexity of the electrical systems.

      • We follow industry standards and guidelines ...

    • Answered by AI
    • Q2. How mey generators in your company
    • Ans. 

      There are 10 generators in our company.

      • Our company has invested in 10 generators for power backup.

      • The generators range from 50kVA to 500kVA.

      • Regular maintenance and testing is conducted to ensure their proper functioning.

      • The generators are strategically placed in different locations to ensure uninterrupted power supply.

    • Answered by AI
    • Q3. 500kva And 310kva and 320 kva to kirlosker and ine Cummins Generator in my compeny
    • Q4. All Generator desal capacity in tank
    • Ans. 

      The generator desal capacity in tank is not provided.

      • Answered by AI
      • Q5. 5000 litter capacity in main tank and 500 kva 700 litters and 320 kva 600 litters and 310 kva 600 litters
      • Ans. 

        The question seems incomplete and unclear.

        • The question lacks context and details.

        • It is unclear what is being asked.

        • More information is needed to provide an answer.

        • The given information is not sufficient to solve the problem.

      • Answered by AI
      • Q6. How much desal construction in 1 hour
      • Ans. 

        The question is unclear and lacks context. Please provide more information.

        • The question needs clarification on what is meant by 'desal construction'

        • It is unclear if the question is asking for the amount of construction completed in an hour or the amount of construction that can be completed in an hour

        • More information is needed on the specific project or location being referred to

      • Answered by AI
      • Q7. 500 kva 1 hour 80to90 litters loed 400 a kw 200
      • Q8. How much concetend loed in your comeny
      • Q9. 1250 4 department all motors hp in all loed
      Round 3 - Technical 

      (3 Questions)

      • Q1. Transformer how much winning inside and
      • Ans. 

        The number of windings inside a transformer depends on its design and purpose.

        • The primary winding is connected to the input voltage source.

        • The secondary winding is connected to the load.

        • Transformers can have multiple windings for different voltage levels or phases.

        • The number of turns in each winding determines the voltage ratio of the transformer.

        • For example, a step-up transformer may have more turns in the secondary w...

      • Answered by AI
      • Q2. Conceting loed in your company
      • Q3. 900 to 2 tarnsfoemers 400 and 500

      Interview Preparation Tips

      Interview preparation tips for other job seekers - Im in elacrical licence holder in wirman ilsense I'm complete diploma EEE work experience in 5 years in HML tea factory eny job I'm coming in your company. honest work more than sccusue... And smart work development your skills.. Hard work provided your shelf..
      Interview experience
      4
      Good
      Difficulty level
      Moderate
      Process Duration
      Less than 2 weeks
      Result
      Selected Selected

      I applied via Recruitment Consulltant and was interviewed before Aug 2023. There was 1 interview round.

      Round 1 - Technical 

      (3 Questions)

      • Q1. What's the motor and working?
      • Ans. 

        The motor is a device that converts electrical energy into mechanical energy to perform work.

        • A motor consists of a rotor and a stator, with the rotor rotating inside the stator.

        • Motors can be AC (alternating current) or DC (direct current) depending on the type of power source.

        • Common types of motors include induction motors, synchronous motors, and brushed or brushless DC motors.

        • Motors are used in various applications s...

      • Answered by AI
      • Q2. How to power system?
      • Ans. 

        Power system can be powered using various sources such as electricity from the grid, generators, solar panels, or batteries.

        • Power system can be connected to the grid to receive electricity from a utility company.

        • Generators can be used as a backup power source in case of outages or in remote locations.

        • Solar panels can be installed to harness energy from the sun and power the system.

        • Batteries can store excess energy for ...

      • Answered by AI
      • Q3. About your previous job responsibility.

      I was interviewed in May 2022.

      Round 1 - Assignment 

      I'm going to be a long day

      Round 2 - Technical 

      (1 Question)

      • Q1. I'm going to be a long day
      Round 3 - Technical 

      (1 Question)

      • Q1. I'm going to be a good day
      • Ans. I'm going to be a good
      • Answered Anonymously
      Round 4 - Technical 

      (1 Question)

      • Q1. I'm going to be a long day

      Interview Preparation Tips

      Interview preparation tips for other job seekers - I'm a long day for me and I will be a long day

      KLJ GROUP Interview FAQs

      How many rounds are there in KLJ GROUP Electrical Technician interview?
      KLJ GROUP interview process usually has 1 rounds. The most common rounds in the KLJ GROUP interview process are Technical.
      How to prepare for KLJ GROUP Electrical Technician interview?
      Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at KLJ GROUP. The most common topics and skills that interviewers at KLJ GROUP expect are Electrical Maintenance.
      What are the top questions asked in KLJ GROUP Electrical Technician interview?

      Some of the top questions asked at the KLJ GROUP Electrical Technician interview -

      1. 2. Explain off load and on load oltc and rtcc pa...read more
      2. 1. Full details of motor name plate and transform...read more

      Tell us how to improve this page.

      KLJ GROUP Electrical Technician Salary
      based on 10 salaries
      ₹1.5 L/yr - ₹5 L/yr
      9% less than the average Electrical Technician Salary in India
      View more details

      KLJ GROUP Electrical Technician Reviews and Ratings

      based on 3 reviews

      3.5/5

      Rating in categories

      4.1

      Skill development

      4.5

      Work-Life balance

      3.3

      Salary & Benefits

      3.3

      Job Security

      3.3

      Company culture

      3.5

      Promotions/Appraisal

      3.3

      Work Satisfaction

      Explore 3 Reviews and Ratings
      Production Supervisor
      25 salaries
      unlock blur

      ₹2.2 L/yr - ₹5.1 L/yr

      Production Engineer
      23 salaries
      unlock blur

      ₹3.3 L/yr - ₹6.5 L/yr

      Assistant Engineer
      19 salaries
      unlock blur

      ₹3.5 L/yr - ₹5 L/yr

      Shift Incharge
      18 salaries
      unlock blur

      ₹3.3 L/yr - ₹7 L/yr

      Plant Operator
      18 salaries
      unlock blur

      ₹1.5 L/yr - ₹3.5 L/yr

      Explore more salaries
      Compare KLJ GROUP with

      Reliance Industries

      4.0
      Compare

      Aditya Birla Group

      4.1
      Compare

      Tata Group

      4.2
      Compare

      Adani Group

      3.9
      Compare

      Calculate your in-hand salary

      Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
      Did you find this page helpful?
      Yes No
      write
      Share an Interview