i
Kirloskar Oil Engines
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Oct 2024. There were 2 interview rounds.
Electrical machines are devices that convert electrical energy into mechanical energy or vice versa.
Types include electric motors, generators, transformers, and alternators
Electric motors convert electrical energy into mechanical energy to perform work
Generators convert mechanical energy into electrical energy
Transformers transfer electrical energy between circuits
Alternators convert mechanical energy into alternating
Power system working involves generation, transmission, distribution, and utilization of electrical energy.
Power generation from sources like coal, hydro, nuclear, solar, wind, etc.
Transmission of power through high voltage lines to substations.
Distribution of power to homes and businesses through transformers and distribution lines.
Utilization of power by various electrical devices and appliances.
Monitoring and contro...
Top trending discussions
I applied via Campus Placement and was interviewed in Mar 2023. There were 2 interview rounds.
Motors convert electrical energy into mechanical energy to produce motion, while pumps are devices that move fluids by mechanical action.
Motors convert electrical energy into mechanical energy to produce motion
Pumps are devices that move fluids by mechanical action
Motors are used in various applications such as fans, conveyor belts, and electric vehicles
Pumps are used in applications like water circulation, oil refinin
posted on 17 Jan 2024
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
It was very easy every one will clear the exam
General knowledge,30min , easy to medium
Quantitative,Qualitative ,1 hr , Medium
posted on 10 May 2018
I applied via Company Website and was interviewed in Jan 2018. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
posted on 18 Jan 2025
I applied via Naukri.com and was interviewed in Jul 2024. There were 3 interview rounds.
The candidate should have a strong understanding of manufacturing and planning processes.
Knowledge of lean manufacturing principles
Experience with production scheduling and capacity planning
Understanding of supply chain management
Ability to optimize processes for efficiency and cost-effectiveness
I plan to continue advancing my skills in engineering through further education and certifications, as well as taking on more leadership roles within the field.
Pursuing a master's degree in engineering to deepen my knowledge and expertise
Obtaining professional certifications such as PMP or Six Sigma to enhance my skill set
Seeking opportunities to lead projects and teams to develop my leadership abilities
Staying updated...
Ensuring retention by creating a supportive work environment for employees and their families.
Offering flexible work hours and remote work options to accommodate family needs
Providing comprehensive health insurance and wellness programs for employees and their families
Organizing family-friendly events and activities to promote work-life balance
Offering competitive salaries and benefits to attract and retain top talent
posted on 19 Feb 2024
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 28 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
The process of erection of duct involves planning, fabrication, transportation, installation, and testing.
Planning involves determining the layout, size, and material of the ducts.
Fabrication includes cutting, bending, and assembling the ducts according to the design.
Transportation is the movement of fabricated ducts to the installation site.
Installation involves positioning and connecting the ducts to the HVAC system.
...
The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.
The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.
Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.
Fabrication processes must also ...
The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.
Start by assembling the foundation and anchor bolts.
Next, erect the columns and connect them to the foundation.
Then, install the beams and trusses to form the framework.
After that, add the bracing and diagonal members for stability.
Finally, complete the structure by ad...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Deputy Manager
199
salaries
| ₹5.8 L/yr - ₹12.5 L/yr |
Senior Engineer
118
salaries
| ₹4 L/yr - ₹9.5 L/yr |
Area Sales Officer
110
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Area Sales Manager
97
salaries
| ₹4.4 L/yr - ₹14.6 L/yr |
Service Engineer
92
salaries
| ₹0.8 L/yr - ₹5.4 L/yr |
Thermax Limited
Cummins
ABB
Isgec Heavy Engineering