Filter interviews by
I applied via Approached by Company
Composite materials are materials made from two or more different materials with different properties, combined to create a stronger, lighter, or more durable material.
Composite materials can be made from a combination of materials such as carbon fiber, fiberglass, and resin.
They are used in various industries including aerospace, automotive, construction, and sports equipment.
Composite materials offer advantages such ...
Lead time is the total time taken from receiving an order to delivering the product. Cycle time is the time taken to complete one cycle of a process.
Lead time includes all the steps from order placement to product delivery, including processing, manufacturing, and transportation.
Cycle time is the time taken to complete one unit of a product or service.
Lead time is usually longer than cycle time due to waiting times and...
Top trending discussions
Mainly on speed maths and general aptitude questions
Mean is the average of a set of numbers, mode is the most frequently occurring number, and median is the middle number when the numbers are arranged in order.
Mean is calculated by adding up all the numbers in a set and dividing by the total number of values.
Mode is the number that appears most frequently in a set of numbers.
Median is the middle number in a set of numbers when they are arranged in order.
For example, in ...
Guesstimate is an estimate made without using precise data, based on guesswork or rough calculations.
Guesstimates are often used in situations where exact data is not available or difficult to obtain.
It involves making an educated guess based on available information and assumptions.
For example, estimating the number of tennis balls that can fit in a school bus without actually measuring it.
Guesstimates are commonly us...
posted on 15 Aug 2021
I applied via Walk-in and was interviewed before Aug 2020. There were 3 interview rounds.
Optimizing methane gas production involves efficient feedstock selection, process optimization, and waste management.
Selecting the right feedstock with high methane content
Optimizing the process parameters such as temperature, pressure, and pH
Implementing waste management techniques to reduce the buildup of inhibitory compounds
Using advanced technologies such as anaerobic digestion and membrane separation
Regular mainte
I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 30 Sep 2021
I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.
posted on 17 Dec 2021
I applied via Referral and was interviewed before Dec 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.
The least count of vernier calliper is the smallest measurement that can be read on the instrument.
The least count is determined by the number of divisions on the vernier scale and the main scale.
It is usually expressed in fractions of a millimeter or inch.
For example, a vernier calliper with 20 divisions on the vernier scale and 1mm on the main scale has a least count of 0.05mm.
The least count is important for accurat...
The least count of a micrometer is typically 0.01 mm or 0.001 cm.
The least count is the smallest measurement that can be read on the micrometer scale.
It is determined by the number of divisions on the scale and the pitch of the screw.
For example, a micrometer with 50 divisions on the scale and a pitch of 0.5 mm would have a least count of 0.01 mm.
The least count can vary depending on the type and precision of the micro...
posted on 16 Dec 2022
I applied via Walk-in and was interviewed before Dec 2021. There were 2 interview rounds.
Proactive approach and solution ability are essential for a Production Engineer.
A proactive approach involves anticipating problems and taking preventive measures.
Solution ability involves identifying problems and finding effective solutions.
Examples of proactive measures include regular maintenance and quality checks.
Examples of solution ability include troubleshooting and implementing process improvements.
A Productio...
I applied via Campus Placement and was interviewed before Oct 2021. There were 4 interview rounds.
Basic Btech and quantitative aptitude question
GD topic was general , but advice is that all should be eager to participate.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Production Engineer
11
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Design Engineer
6
salaries
| ₹2.7 L/yr - ₹4.3 L/yr |
Quality Engineer
6
salaries
| ₹3.3 L/yr - ₹4 L/yr |
Mechanical Engg. Design
4
salaries
| ₹4.2 L/yr - ₹5.5 L/yr |
Project Manager
4
salaries
| ₹9.5 L/yr - ₹11.5 L/yr |
Karvy Financial Services
Reliance Money
Sonata Finance
Bss Microfinance