Upload Button Icon Add office photos

Filter interviews by

Kef Infrastructure India Interview Questions and Answers

Updated 7 Sep 2023

Kef Infrastructure India Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. How much experience
  • Q2. And commercial project experience
  • Q3. And salary expectation
  • Q4. And last company salary
  • Q5. How much worker handle for work

Interview Preparation Tips

Interview preparation tips for other job seekers - Good 👍

Civil Supervisor Interview Questions asked at other Companies

Q1. 1=Derivation of D²/162. 2=nominal mix 3=design mix 4=per tonne binding wire 5=water cement ratio 6=recent experience or responsibility.
View answer (1)

Interview questions from similar companies

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. About my past job
  • Q2. About interlinking
  • Q3. Comand area related details
  • Q4. Domestik water related details
  • Q5. Drainage works related works details

Interview Preparation Tips

Interview preparation tips for other job seekers - I will sugest to first discuss time frame of job
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Quantitative reasoning

Round 2 - One-on-one 

(5 Questions)

  • Q1. About yourself and past experiences.
  • Q2. Managerial round
  • Q3. About company information
  • Q4. About yourself and extracurricular activities
  • Q5. See yourself in the next 5 yrs

Interview Preparation Tips

Interview preparation tips for other job seekers - be prepared for questions.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Not Selected
Round 1 - Technical 

(2 Questions)

  • Q1. What is the output voltage of an AAAC Rabbit conductor?
  • Ans. 

    The output voltage of an AAAC Rabbit conductor is typically around 600 volts.

    • The output voltage of an AAAC Rabbit conductor is usually around 600 volts.

    • The exact output voltage may vary depending on the specific application and conditions.

    • It is important to consult the manufacturer's specifications for accurate information.

  • Answered by AI
  • Q2. What is your execution work plan?
  • Ans. 

    My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.

    • Set clear goals and objectives for the project

    • Create a detailed timeline with milestones and deadlines

    • Assign tasks to team members based on their strengths and expertise

    • Regularly monitor progress and make adjustments as needed

    • Communicate effectively with team members and stakeholders

    • Ut...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Normal interview the materials and workmanship
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

They are as a friendly asked questions what you did past service as before organization.

Round 2 - Technical 

(1 Question)

  • Q1. Asked simple technical questions, related to your experience s .

Interview Preparation Tips

Interview preparation tips for other job seekers - You are needed to prepare according to your role and while interview time ask comfortable salary Expectations keep it in your mind , from beginning you should keep high expectations of salary benefits
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is job safety analysis
  • Ans. 

    Job safety analysis is a process of identifying potential hazards in a job task and implementing controls to mitigate risks.

    • Involves breaking down a job task into steps

    • Identifying potential hazards for each step

    • Determining preventive measures to reduce risks

    • Ensures workers are aware of safety procedures

    • Examples: construction site JSA, manufacturing plant JSA

  • Answered by AI
  • Q2. What is hazard identification and risk assessment
  • Ans. 

    Hazard identification is the process of identifying potential sources of harm in the workplace, while risk assessment involves evaluating the likelihood and severity of those hazards.

    • Hazard identification involves identifying potential sources of harm such as chemicals, machinery, or ergonomic factors.

    • Risk assessment involves evaluating the likelihood and severity of harm from these hazards.

    • The goal is to implement con...

  • Answered by AI
  • Q3. What is fire safety
  • Ans. 

    Fire safety refers to measures taken to prevent and protect against the risks of fire.

    • Fire safety includes having working smoke detectors in place.

    • It also involves creating and practicing a fire escape plan.

    • Proper storage and handling of flammable materials is crucial for fire safety.

    • Regular maintenance of fire extinguishers and other fire safety equipment is important.

    • Training employees on fire safety protocols is ess

  • Answered by AI
  • Q4. Accident investigation
  • Q5. What is hazard site
  • Ans. 

    A hazard site is a location where there is a potential risk of harm to people, property, or the environment.

    • Hazard sites can include industrial facilities, chemical plants, nuclear power plants, and construction sites.

    • These sites may contain hazardous materials, dangerous equipment, or unsafe conditions.

    • Proper safety measures and protocols must be followed at hazard sites to prevent accidents and injuries.

    • Examples of h...

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(5 Questions)

  • Q1. Salary why not time being paid ?
  • Q2. Without any evidence how blaming staff ??
  • Ans. 

    Blaming staff without evidence is unprofessional and can damage morale and trust within the team.

    • Avoid jumping to conclusions without concrete evidence

    • Encourage open communication and transparency

    • Focus on problem-solving rather than assigning blame

    • Provide constructive feedback and support to help staff improve

    • Lead by example and take responsibility for mistakes

  • Answered by AI
  • Q3. Company always carried out theft staff ?
  • Q4. No one professional staff in office and overall company ??
  • Q5. Why directors board unseen to thefts??
  • Ans. 

    Directors may not always be aware of thefts due to lack of oversight, trust in employees, or focus on other priorities.

    • Directors may not be directly involved in day-to-day operations where thefts occur

    • There may be a lack of proper oversight or monitoring mechanisms in place

    • Directors may trust their employees and not suspect them of theft

    • Directors may be focused on other strategic priorities and not pay attention to pot

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - No body goes to the join these lack group
Hr team non capable and non educated people
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Questioned about Salary expectations
  • Q2. Questioned abut work locations
Round 2 - Technical 

(2 Questions)

  • Q1. Questioned about nature of work in present company
  • Q2. Questioned about ability for role at the company

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview process is fast. Virtual interview option is available.
However the HR goes cold once you have been interviewed.
No proper feedback despite multiple attempts to reach. (especially in the case when they have decided not to go ahead with the candidate)
Tough salary negotiation. Bargaining will happen for even as low a difference as Rs. 5000/-
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2024. There were 3 interview rounds.

Round 1 - Assignment 

Purchase Assignment - Comparing PO's

Round 2 - One-on-one 

(2 Questions)

  • Q1. What is the Basic Rule of Purchase
  • Q2. How mant quotations will you take before evaluating
Round 3 - HR 

(2 Questions)

  • Q1. Expectations From the company?
  • Q2. Expected Compensiation?

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company, You will get experience Letter.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How many grade of Bitumen ?
  • Ans. 

    There are mainly four grades of bitumen commonly used in construction: VG-10, VG-20, VG-30, and VG-40.

    • VG-10: Suitable for low-traffic roads

    • VG-20: Suitable for medium-traffic roads

    • VG-30: Suitable for high-traffic roads

    • VG-40: Suitable for heavy-duty traffic areas like airports and container terminals

  • Answered by AI
  • Q2. What is the compressive strength of cement mortar cube 3 days
  • Ans. 

    The compressive strength of cement mortar cube at 3 days is typically around 20-25 MPa.

    • Compressive strength of cement mortar cube is an important parameter to assess its quality and durability

    • The strength of cement mortar increases with age, so 3 days is an early testing point

    • Typical compressive strength values for cement mortar cubes at 3 days range from 20-25 MPa

  • Answered by AI

Kef Infrastructure India Interview FAQs

How many rounds are there in Kef Infrastructure India interview?
Kef Infrastructure India interview process usually has 2 rounds. The most common rounds in the Kef Infrastructure India interview process are Resume Shortlist and One-on-one Round.
How to prepare for Kef Infrastructure India interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Kef Infrastructure India. The most common topics and skills that interviewers at Kef Infrastructure India expect are Construction, Erection, Building Construction, Building Material and Civil.

Tell us how to improve this page.

People are getting interviews through

based on 1 Kef Infrastructure India interview
Job Portal
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Kef Infrastructure India Reviews and Ratings

based on 60 reviews

4.2/5

Rating in categories

4.2

Skill development

3.6

Work-Life balance

3.3

Salary & Benefits

2.8

Job Security

3.9

Company culture

3.0

Promotions/Appraisal

3.5

Work Satisfaction

Explore 60 Reviews and Ratings
HSE Officer
6 salaries
unlock blur

₹3.5 L/yr - ₹5.1 L/yr

Project Engineer
5 salaries
unlock blur

₹7.8 L/yr - ₹11.1 L/yr

Senior Civil Engineer
4 salaries
unlock blur

₹5.2 L/yr - ₹9.2 L/yr

Civil Supervisor
4 salaries
unlock blur

₹4.1 L/yr - ₹5.1 L/yr

Procurement Officer
4 salaries
unlock blur

₹5.5 L/yr - ₹7 L/yr

Explore more salaries
Compare Kef Infrastructure India with

Millennium Engineers & Contractors

4.1
Compare

Karam Industries

4.0
Compare

S V S Projects India

3.4
Compare

MaRS Planning & Engineering Services

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview