Upload Button Icon Add office photos

Filter interviews by

Kalpataru Projects International Electrician Specialist Interview Questions and Answers

Updated 22 Jun 2022

Kalpataru Projects International Electrician Specialist Interview Experiences

1 interview found

I applied via Company Website and was interviewed in Dec 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Electrician specialist
  • Q2. All rounder electrician
  • Q3. Rintu Kumar Thakur electrician 13 sal all rounder electrician
  • Q4. Electrician Rintu Kumar Thakur

Interview Preparation Tips

Interview preparation tips for other job seekers - Rintu Kumar Thakur electrician xvideo 13 saal

Interview questions from similar companies

I applied via Walk-in and was interviewed before Jul 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Good behaviour, and Excellent technical knowledge
  • Q2. Basic, introduction and technical practical knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Sellery discussions and travelling GH to Site,remot area location
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Plant and machinery
  • Ans. 

    P&m phul from hai ka

  • Answered Anonymously
  • Q2. LED light banana
  • Q3. Rccb tester karna
Round 2 - HR 

(2 Questions)

  • Q1. Plant and machinery
  • Q2. LED light banana

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. Abs ka full foom kya h
  • Q2. Rile kya hota h or kitna prkar ka hota h
  • Ans. Jis me no or nc Kam krta h usko rile bolte h
  • Answered Anonymously
  • Q3. Rile link kya hota h
  • Ans. Jo 1 dusra ko connect krta h usko rile link khte h
  • Answered Anonymously
  • Q4. R c cabal s kon sa istument chlta h
  • Q5. Ai or ao ka full fom kya hota h
  • Q6. Di or do ka ful fom kya hota h

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2024. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Electrical technician
  • Q2. Power tool & hand tool &other
  • Q3. Instilling and maintenance

Interview Preparation Tips

Interview preparation tips for other job seekers - My current location job in chhattisgarh
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Department for job experience and introduction, Technical question??
Round 3 - HR 

(1 Question)

  • Q1. Hr interview? So many work station and plant question???

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Three people seat and asked Just simple technical questions frequently from civil engineering in hindi & English and watched the confidence level also. Some difficult questions is also there but they have ...
  • Q2. Forget now because long years ago it has been done.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & should have technical knowledge.

I appeared for an interview before Jul 2016.

Interview Preparation Tips

Round: Group Discussion
Duration: 4 hours 5 minutes

Round: Test
Duration: 2 hours 5 minutes

Kalpataru Projects International Interview FAQs

How many rounds are there in Kalpataru Projects International Electrician Specialist interview?
Kalpataru Projects International interview process usually has 2 rounds. The most common rounds in the Kalpataru Projects International interview process are Resume Shortlist and Technical.
What are the top questions asked in Kalpataru Projects International Electrician Specialist interview?

Some of the top questions asked at the Kalpataru Projects International Electrician Specialist interview -

  1. Rintu Kumar Thakur electrician 13 sal all rounder electric...read more
  2. Electrician special...read more
  3. All rounder electric...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 766 Interviews
Tata Projects Interview Questions
4.2
 • 458 Interviews
KEC International Interview Questions
4.0
 • 317 Interviews
Tata Technologies Interview Questions
3.6
 • 266 Interviews
Saint-Gobain Interview Questions
4.0
 • 174 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
View all

Kalpataru Projects International Electrician Specialist Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Deputy Manager
626 salaries
unlock blur

₹5.5 L/yr - ₹21 L/yr

Assistant Manager
609 salaries
unlock blur

₹3.7 L/yr - ₹14.6 L/yr

Senior Engineer
509 salaries
unlock blur

₹3.4 L/yr - ₹11.2 L/yr

Engineer
288 salaries
unlock blur

₹2.7 L/yr - ₹8.5 L/yr

Manager
263 salaries
unlock blur

₹6.2 L/yr - ₹26 L/yr

Explore more salaries
Compare Kalpataru Projects International with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview