Filter interviews by
I applied via Campus Placement
Basic Aptitude Test,Reasoning,Maths
Asked basic mechanic engineering questions like Rankine cycle
Boil water, add tea leaves, steep for desired time, strain and serve with milk and sugar.
Boil water in a kettle or pot
Add tea leaves to a teapot or infuser
Pour hot water over tea leaves and steep for desired time
Strain tea into a cup and add milk and sugar to taste
posted on 27 Dec 2024
posted on 9 Jan 2025
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
OGT stands for Overall Gas Turbine. It is a measure of the overall performance of a gas turbine engine.
OGT is calculated by taking into account various parameters such as turbine inlet temperature, compressor discharge pressure, and fuel flow rate.
Monitoring OGT is crucial for ensuring the efficient operation of the gas turbine engine.
An increase in OGT may indicate a potential issue with the engine, such as fouling of...
Switch gear is a combination of electrical disconnect switches, fuses or circuit breakers used to control, protect and isolate electrical equipment.
Switch gear is used to control the flow of electricity in a power system.
It includes devices like circuit breakers, fuses, and disconnect switches.
Switch gear is essential for protecting electrical equipment from overloads and short circuits.
It helps in isolating faulty equ...
Transformer safety involves measures to prevent electrical hazards and ensure proper functioning of transformers.
Regular maintenance and inspection of transformers is essential for safety
Proper grounding and insulation to prevent electrical shocks
Following safety protocols and procedures when working with transformers
Using personal protective equipment (PPE) when handling transformers
Avoiding overloading transformers t
Chillers safety refers to the measures in place to ensure the safe operation of chillers and prevent accidents.
Regular maintenance and inspections are crucial for ensuring the safety of chillers.
Proper training of personnel on chiller operation and safety protocols is essential.
Emergency shutdown procedures should be clearly defined and easily accessible.
Safety features such as pressure relief valves and temperature se...
Control diagrams for Star Delta and DOL starters are essential for understanding the operation of these motor starting methods.
Control diagram for Star Delta starter involves two contactors and a timer for switching between star and delta connections.
Control diagram for DOL starter includes a single contactor for direct starting of the motor.
Both diagrams show the connections of the motor, contactors, overload relays, ...
posted on 17 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
Maintenance equipment efficiency focuses on optimizing performance and reducing downtime through effective practices.
Regular maintenance schedules prevent unexpected breakdowns, e.g., weekly checks on HVAC systems.
Utilizing predictive maintenance tools can forecast equipment failures, e.g., vibration analysis in motors.
Training staff on proper equipment use enhances efficiency, e.g., operators trained on CNC machine se...
posted on 10 Jun 2024
I applied via Company Website and was interviewed in May 2024. There were 4 interview rounds.
This is Software and QC
Jio Rautar Parts is new Tha
posted on 8 Apr 2021
I applied via Naukri.com and was interviewed before Apr 2020. There were 3 interview rounds.
PQR refers to the pre-qualification requirement of the tender.
PQR is a set of criteria that bidders must meet in order to be considered eligible for the tender.
These criteria may include financial stability, technical expertise, and experience in similar projects.
PQR is typically outlined in the tender documents and must be met before a bidder can submit their proposal.
Meeting the PQR is important as it demonstrates th...
Estimating project costing involves analyzing various factors and creating a budget plan.
Identify all the resources required for the project
Determine the cost of each resource
Calculate the total cost of resources
Consider additional expenses such as overhead costs and contingency funds
Create a budget plan based on the estimated costs
Regularly review and update the budget plan throughout the project
I applied via Recruitment Consulltant and was interviewed before Sep 2021. There was 1 interview round.
posted on 27 Nov 2020
posted on 6 May 2022
I appeared for an interview before May 2021.
based on 2 interviews
Interview experience
based on 1 review
Rating in categories
Project Engineer
7
salaries
| ₹2.7 L/yr - ₹3.2 L/yr |
Senior Software Engineer
6
salaries
| ₹5 L/yr - ₹6.4 L/yr |
Software Engineer
5
salaries
| ₹5 L/yr - ₹6 L/yr |
Senior Engineer
4
salaries
| ₹6.2 L/yr - ₹8 L/yr |
Technical Lead
4
salaries
| ₹5.1 L/yr - ₹36 L/yr |
Housejoy
Technique Control Facility Management
Elsamex Maintenance Services
S&IB Services