Filter interviews by
posted on 8 Apr 2021
I applied via Naukri.com and was interviewed before Apr 2020. There were 3 interview rounds.
PQR refers to the pre-qualification requirement of the tender.
PQR is a set of criteria that bidders must meet in order to be considered eligible for the tender.
These criteria may include financial stability, technical expertise, and experience in similar projects.
PQR is typically outlined in the tender documents and must be met before a bidder can submit their proposal.
Meeting the PQR is important as it demonstrates th...
Estimating project costing involves analyzing various factors and creating a budget plan.
Identify all the resources required for the project
Determine the cost of each resource
Calculate the total cost of resources
Consider additional expenses such as overhead costs and contingency funds
Create a budget plan based on the estimated costs
Regularly review and update the budget plan throughout the project
Top trending discussions
I applied via Campus Placement
General aptitude, programing aptitude, logical and arithametic
I applied via LinkedIn and was interviewed before May 2023. There were 2 interview rounds.
Logical problems and mathematical questions commonly asked .. English proficiency
posted on 27 Dec 2024
posted on 10 Jun 2024
I applied via Company Website and was interviewed in May 2024. There were 4 interview rounds.
This is Software and QC
Jio Rautar Parts is new Tha
I applied via Naukri.com and was interviewed in Jul 2020. There were 3 interview rounds.
posted on 11 Dec 2021
I applied via Naukri.com and was interviewed before Dec 2020. There were 3 interview rounds.
posted on 18 May 2021
posted on 19 Sep 2020
I applied via Referral and was interviewed in Aug 2020. There was 1 interview round.
HVAC stands for Heating, Ventilation, and Air Conditioning. It is a technology used for indoor and vehicular environmental comfort.
HVAC systems regulate temperature, humidity, and air quality in buildings and vehicles.
They consist of various components such as furnaces, air conditioners, heat pumps, ductwork, and thermostats.
HVAC technicians install, maintain, and repair these systems.
They also ensure that the systems ...
DG stands for Diesel Generator. It is a type of generator that uses diesel fuel to produce electrical energy.
DG is commonly used as a backup power source in case of power outages.
It consists of an engine that runs on diesel fuel and a generator that converts mechanical energy into electrical energy.
DGs are often used in industries, commercial buildings, hospitals, and residential areas.
They are known for their reliabil...
posted on 11 May 2023
I applied via Approached by Company and was interviewed before May 2022. There were 3 interview rounds.
Operation of the building and mall and client satification
Electrical Supervisor
19
salaries
| ₹2.4 L/yr - ₹3.4 L/yr |
Technician
17
salaries
| ₹2 L/yr - ₹3 L/yr |
Shift Engineer
13
salaries
| ₹2.8 L/yr - ₹4.5 L/yr |
Electrical Engineer
11
salaries
| ₹2.5 L/yr - ₹4.1 L/yr |
Supervisor
10
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Housejoy
Technique Control Facility Management
Elsamex Maintenance Services
S&IB Services