Filter interviews by
Charge mix refers to the combination of raw materials used in the melting process.
Charge mix is prepared by combining different types of scrap metal, pig iron, and other additives.
The composition of the charge mix can affect the quality and properties of the final product.
Charge mix preparation involves weighing and blending the raw materials to achieve the desired chemical composition.
The charge mix is then loaded int...
Recovery of alloy refers to the percentage of metal that is successfully extracted from the raw material.
It is a measure of the efficiency of the melting process.
Higher recovery rates mean less waste and lower costs.
Factors that affect recovery include the quality of the raw material, the melting process, and the skill of the operators.
For example, if 100 kg of raw material contains 80 kg of metal, and the recovery rat
Top trending discussions
I applied via Referral and was interviewed in Dec 2024. There was 1 interview round.
I was interviewed in Dec 2024.
It was easy cognitive aptitude and reasoning qsns
Med-Hard problems given 1hr to solve for 2 qsns
Developed a mobile app for tracking daily water intake
Researched user needs and preferences for water intake tracking
Designed user-friendly interface for inputting water consumption
Implemented features like reminders and progress tracking
Tested app with focus groups for feedback and improvements
My long term goal is to become a senior engineer in a reputable company and eventually move into a leadership role.
Continuously improve my technical skills and knowledge through training and certifications
Seek opportunities for mentorship and leadership roles within the company
Work on challenging projects to gain experience and expertise
Build a strong professional network within the industry
Eventually transition into a...
I applied via Recruitment Consulltant and was interviewed before Oct 2020. There was 1 interview round.
I have 3 years of experience working as an Electrical Engineer in a power distribution company.
Designed electrical systems for new construction projects
Performed regular maintenance on electrical equipment
Troubleshooted and repaired electrical issues in a timely manner
Different ways to locate elements in a web page include using XPath, CSS selectors, ID, class name, tag name, and link text.
XPath: Allows you to navigate through the HTML structure of a web page.
CSS selectors: Can be used to target specific elements based on their attributes.
ID: Unique identifier for an element on a web page.
Class name: Used to group elements with similar styling.
Tag name: Targets elements based on the...
Working with lists in Selenium involves locating elements, storing them in a list, and performing actions on them.
Locate elements using findElements() method
Store elements in a List
Iterate through the list to perform actions on each element
Example: List
I faced challenges in team communication and conflicting priorities.
Miscommunication leading to delays in project timelines
Conflicting priorities causing tension within the team
Difficulty in aligning team members' goals and objectives
I applied via Company Website and was interviewed in Jul 2023. There were 4 interview rounds.
Aptitude questions and English reasoning questions
Given two codes and time for each question is 25mins
I applied via Walk-in and was interviewed in Aug 2023. There were 3 interview rounds.
Yes I am iti fitter and electrical work experience 10 years
Power cut no working stop on invator working start
No mcb work on short sircut so short sir cut working Power on
Tolerance zone for perpendicularity in GD&T is the allowable range within which a feature can deviate from being perfectly perpendicular.
Tolerance zone for perpendicularity is a 2D cylindrical tolerance zone that is perpendicular to a datum plane.
It is represented by two parallel planes that are a specified distance apart.
The feature must fall within this zone to be considered perpendicular.
The tolerance value specifie...
Use a sorting algorithm like quicksort or mergesort to solve the given problem efficiently.
Choose the appropriate sorting algorithm based on the size of the input data and the constraints of the problem.
Implement the chosen algorithm in a way that optimizes time and space complexity.
Test the algorithm with different input sizes and edge cases to ensure its correctness and efficiency.
Quality Engineer
7
salaries
| ₹1.7 L/yr - ₹3 L/yr |
QC Engineer
4
salaries
| ₹3 L/yr - ₹3 L/yr |
Senior QA Engineer
4
salaries
| ₹4.5 L/yr - ₹7.5 L/yr |
Kirloskar Brothers
Welspun Corp
Tata Steel
Jindal Steel and Power