Filter interviews by
I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
Production preparedness refers to the state of readiness of a production process to meet demand efficiently and effectively.
Production preparedness involves having all necessary resources, such as materials, equipment, and manpower, in place to meet production targets.
It also includes having contingency plans in case of unexpected disruptions in the production process.
Regular maintenance of equipment and machinery is e...
Top trending discussions
posted on 29 Aug 2024
I applied via Company Website and was interviewed in Jul 2024. There were 5 interview rounds.
I am silent person, my work is not for bad
Team work this best working
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jul 2022. There were 4 interview rounds.
Production, quality,managing
Production, quality, managing
posted on 15 Apr 2023
I applied via Approached by Company and was interviewed before Apr 2022. There were 2 interview rounds.
There are various types of valves used in different industries for controlling the flow of fluids or gases.
Gate valve
Ball valve
Butterfly valve
Check valve
Globe valve
Diaphragm valve
Plug valve
Needle valve
Pressure relief valve
Safety valve
Pressure units are used to measure the force exerted on a surface per unit area.
Pressure is typically measured in units such as pascal (Pa), bar, psi, or atmosphere (atm).
1 pascal (Pa) is equal to 1 newton per square meter (N/m²).
1 bar is approximately equal to atmospheric pressure at sea level (1 atm).
1 psi (pound per square inch) is equal to approximately 6895 pascals (Pa).
The fire triangle is a model that explains the three elements required for a fire to start and continue. Diamonds are a form of carbon that is highly valued for their beauty and durability.
The fire triangle consists of three elements: fuel, heat, and oxygen.
If any of these elements are removed, the fire will be extinguished.
Diamonds are formed deep within the Earth's mantle and are brought to the surface through volcan...
The Bernoulli equation relates the pressure, velocity, and elevation of a fluid in a streamline.
The Bernoulli equation is a fundamental equation in fluid dynamics.
It states that the total energy of a fluid remains constant along a streamline.
The equation relates the pressure, velocity, and elevation of the fluid.
It is derived from the principle of conservation of energy.
The equation is commonly used in various applicat...
There are numerous types of unit operations and unit processes in production.
Unit operations involve physical changes to materials, such as mixing, filtration, and distillation.
Unit processes involve chemical changes, such as oxidation, reduction, and hydrolysis.
Examples of unit operations include crushing, grinding, and drying.
Examples of unit processes include fermentation, polymerization, and chlorination.
I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.
posted on 4 Feb 2022
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There were 2 interview rounds.
The process for installing a fan for plant operations involves planning, preparation, installation, and testing.
Plan the location of the fan for optimal air circulation
Prepare the necessary tools and equipment for installation
Install the fan according to manufacturer's instructions
Test the fan to ensure proper functioning
Ensure proper maintenance and regular checks for optimal performance
The heat consumption required for manufacturing 1 metric ton of cement varies depending on the type of cement and production process.
Heat consumption can range from 3.6 - 6.0 GJ per metric ton of cement produced.
Factors such as the type of kiln used, fuel type, and energy efficiency measures can impact heat consumption.
For example, dry process cement production typically requires less heat compared to wet process produ
Daily job responsibilities include overseeing production processes, managing staff, ensuring quality control, and meeting production targets.
Overseeing production processes to ensure efficiency and quality
Managing staff, including scheduling, training, and performance evaluations
Ensuring quality control measures are in place and followed
Meeting production targets and deadlines
Collaborating with other departments to opt
Balancing raw materials in production involves accurately measuring and adjusting the quantities of each material to ensure optimal production output.
Calculate the required quantities of each raw material based on the production schedule
Monitor the inventory levels of each raw material to avoid shortages or excess
Adjust the amounts of raw materials used in production based on quality control standards
Utilize software s...
I was interviewed in Jan 2024.
OEE can be calculated by multiplying Availability, Performance, and Quality.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Count by Total Count.
Multiply Availability, Performance, and Quality to get OEE.
Example: OEE = Availability x Performance x Quality
6 Sigma is a data-driven methodology for improving processes by reducing defects and variations.
6 Sigma aims to achieve near perfection in the products or services delivered by a company.
It focuses on identifying and eliminating causes of defects and minimizing variability in manufacturing and business processes.
6 Sigma uses statistical tools and techniques to measure and analyze process performance.
The goal of 6 Sigma...
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement
It involves setting up autonomous maintenance teams to take care of routine tasks
TPM also includes planned maintenance, quality maintenance, and focused improvement projects
Example: Implementing T...
CP Cpl stands for Cost Per Completed Lead, a metric used in marketing to measure the cost of generating a lead that has been successfully completed.
CP Cpl is calculated by dividing the total cost of generating leads by the number of completed leads.
It helps in determining the efficiency and effectiveness of lead generation campaigns.
For example, if a marketing campaign costs $1000 and generates 50 completed leads, the
I applied via LinkedIn
Production engineer for cnc programming and Drawing knowledge
based on 2 reviews
Rating in categories
Design Engineer
8
salaries
| ₹3 L/yr - ₹5.5 L/yr |
Tool Room Engineer
8
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Junior Engineer
7
salaries
| ₹1.6 L/yr - ₹2.5 L/yr |
Senior Purchase Executive
5
salaries
| ₹4.2 L/yr - ₹6 L/yr |
Maintenance Manager
5
salaries
| ₹10.3 L/yr - ₹12.8 L/yr |
Supreme Industries
Nilkamal
Sintex Plastics Technology
Finolex Industries