Upload Button Icon Add office photos

Filter interviews by

Jubilant Industries Engineering Manager Interview Questions and Answers

Updated 27 Apr 2022

Jubilant Industries Engineering Manager Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Star delta starter principla

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company abd culture and frendly

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What about power system
  • Q2. What is protection system
  • Ans. 

    A protection system is a set of devices and measures designed to prevent damage or harm to equipment, personnel, or the environment in case of a fault or abnormal condition.

    • Protection systems can include circuit breakers, fuses, relays, and alarms.

    • They are commonly used in electrical systems to prevent overloads, short circuits, and ground faults.

    • Protection systems are essential for ensuring the safety and reliability ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please tell true answer
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Explain about your current roles
  • Q2. Detailed technical explanation of the Projects that I have worked with
Round 3 - Technical 

(3 Questions)

  • Q1. Pipe Sizing Calculation?
  • Ans. 

    Pipe sizing calculation involves determining the appropriate diameter of a pipe based on flow rate, pressure drop, and material properties.

    • Calculate the required flow rate for the system

    • Determine the pressure drop allowed in the system

    • Consider the material properties of the pipe such as friction factor and roughness

    • Use pipe sizing charts or formulas to find the appropriate diameter

    • Ensure the selected pipe size meets th

  • Answered by AI
  • Q2. Corrosion allowance & some questions in ASME B31.3
  • Q3. Reason for Job Change

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared with all the experiences that you have mentioned in the resume
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Mar 2024.

Round 1 - Aptitude Test 

Basic aptitude question of gate and in technical go through gate 1 mark question

Round 2 - Technical 

(2 Questions)

  • Q1. Reynold no. Details
  • Q2. Shell and tube heat exchanger design
  • Ans. 

    Shell and tube heat exchanger design involves selecting appropriate materials, determining tube layout, and calculating heat transfer coefficients.

    • Select appropriate materials based on fluid properties and operating conditions

    • Determine tube layout to optimize heat transfer efficiency

    • Calculate heat transfer coefficients to ensure proper heat exchange

    • Consider factors like fouling, pressure drop, and thermal expansion in ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on basics of fluid, Mt & it's applications like cooling tower, dryers, stripping tower

I applied via Recruitment Consultant and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Tell me about yourself
  • Q2. About work experience
  • Q3. What is the difference between GT and MT ?
  • Ans. 

    GT stands for automatic transmission while MT stands for manual transmission.

    • GT is an abbreviation for 'Grand Touring' or 'Gran Turismo' and refers to a type of automatic transmission that allows for smooth shifting and a comfortable ride.

    • MT stands for 'Manual Transmission' and requires the driver to manually shift gears using a clutch pedal and gear stick.

    • GT is often found in high-performance sports cars while MT is c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be yourself. If they have shortlisted you, it will on your work experience.

I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Experience in Piping Design tool
  • Ans. 

    I have extensive experience in using various piping design tools.

    • Proficient in using AutoCAD for piping design

    • Familiar with 3D modeling software like SolidWorks for creating detailed piping layouts

    • Skilled in using piping design software such as Caesar II for stress analysis

    • Experience in using PDMS (Plant Design Management System) for piping design and layout

    • Knowledge of industry standards and codes related to piping de

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest and share your vision in terms of individual
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Oct 2023. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Coding Test 

Products quality testing and new style to coding test

Round 3 - Assignment 

Proses packing and dishpatch provide to satisfied and technical employees

Round 4 - Technical 

(6 Questions)

  • Q1. Fssai regarding products batch prosesing
  • Q2. Month by month machine rechaking and maintenance
  • Q3. Day by day packing and proses aria clining and shining
  • Q4. All employees use to safty rool
  • Q5. Timly packing and dishpatch
  • Q6. Controling and handling mainpower new style
Round 5 - Behavioral 

(6 Questions)

  • Q1. No over wordan machine vehicle and employees
  • Q2. Wastaje controling proses and packing and dishpatch point
  • Q3. Activities to liner and Opretaer to damage products and wastaje control
  • Ans. 

    Implementing activities to minimize product damage and control waste in liner and operator roles.

    • Implement proper training programs for liners and operators on handling products carefully

    • Regularly inspect and maintain equipment to ensure optimal performance and reduce chances of product damage

    • Establish clear guidelines and procedures for waste control and disposal

    • Encourage employees to report any issues or concerns reg...

  • Answered by AI
  • Q4. Strong products packing rechaking date and timing
  • Ans. 

    Ensuring strong product packing involves checking the expiration date and timing.

    • Regularly inspecting products for any signs of damage or tampering

    • Following proper packaging guidelines to ensure products are securely packed

    • Checking expiration dates to ensure products are safe for consumption

    • Monitoring packing processes to ensure efficiency and accuracy

  • Answered by AI
  • Q5. Products wastaje use to reatern
  • Ans. 

    We use various methods to reduce product wastage and improve returns.

    • Implementing efficient inventory management systems

    • Training staff on proper handling and storage of products

    • Regularly monitoring expiration dates and rotating stock

    • Analyzing sales data to forecast demand and prevent overstocking

  • Answered by AI
  • Q6. Products proses and packing after to quality rechaking after dishpatch

Interview Preparation Tips

Interview preparation tips for other job seekers - 1-demOnd regarding products packing no over stor
2-week by weeks employees and management meeting and give solution wasteje and loses control
3-mainpoeer and employees work devard to experience and technical regarding
4 - liner and opreter time to time rest break fast provide to energy
5-batch by Bach rechaking products quality
6-products packing same temprechar to no wasteje
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Legal compliance on Health and Safety
  • Ans. 

    Legal compliance on Health and Safety is crucial for ensuring a safe work environment and avoiding penalties.

    • Ensure all employees receive proper training on health and safety protocols

    • Regularly conduct safety inspections and address any hazards promptly

    • Keep up-to-date with relevant laws and regulations regarding health and safety

    • Provide necessary personal protective equipment (PPE) to employees

    • Maintain accurate records

  • Answered by AI
  • Q2. Lagging and leading indicators for HSE
  • Ans. 

    Lagging indicators measure past HSE performance, while leading indicators predict future performance.

    • Lagging indicators: injury rates, lost time incidents, near misses

    • Leading indicators: safety training completion, safety audits, hazard identification

    • Lagging indicators focus on outcomes, while leading indicators focus on actions to prevent incidents

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Learning from previous companies
  • Q2. Reason for change in Job

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive and respond for the question directly

I applied via Naukri.com and was interviewed in Aug 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. SCM related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Give try being 10k turnover concern. All the best
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Nov 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Subjective , basec in post applied
Round 3 - HR 

(1 Question)

  • Q1. Basic hr question
Round 4 - Aptitude Test 

Basic reasoning and % based question

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical two round , aptitude , Hr

Jubilant Industries Interview FAQs

How many rounds are there in Jubilant Industries Engineering Manager interview?
Jubilant Industries interview process usually has 1 rounds. The most common rounds in the Jubilant Industries interview process are One-on-one Round.

Tell us how to improve this page.

Interview Questions from Similar Companies

Dabur Interview Questions
4.0
 • 271 Interviews
Nestle Interview Questions
3.9
 • 233 Interviews
UPL Interview Questions
4.1
 • 175 Interviews
Britannia Interview Questions
4.0
 • 164 Interviews
Marico Interview Questions
4.0
 • 87 Interviews
Tata Chemicals Interview Questions
4.1
 • 60 Interviews
View all
Assistant Manager
45 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
21 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Executive
9 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Research Associate
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Jubilant Industries with

UPL

4.1
Compare

Pidilite Industries

4.3
Compare

Tata Chemicals

4.1
Compare

Godrej Industries

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview