Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by JSW Steel Team. If you also belong to the team, you can get access from here

JSW Steel Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

JSW Steel Mechanical Foreman Interview Questions and Answers

Updated 6 Apr 2023

JSW Steel Mechanical Foreman Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Chp. r.m.h.s belt conv. replace work. gearbox ripear & replace work. gearbox gear seting backles & blu contect. pulley replace work.gear box moter alignment work.crucher hommer bailencing& screen plate ...
  • Q2. Pellet plant. car pellet mantanace work. a.g.b mill maintanace work. id fan balencing work. pellete disc maitanace work.
  • Q3. Chp rmhs project and maintanace work proper timely & safly work complite.

Interview Preparation Tips

Interview preparation tips for other job seekers - chp. rmhs pellet plant. perventiv mainatance.brek down. short down
timely and safely work

Interview questions from similar companies

I applied via Approached by Company and was interviewed before Sep 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Electrical technical
  • Q2. Motor maintance, pull card ,zss,all light connection etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical technician working jindal Steel and Power Dongamauha

Interview Questionnaire 

1 Question

  • Q1. Draw Control diagram of A Motor Which We Can Start From Remote location & Local panel. use Star delta starter.
  • Ans. 

    Control diagram of a motor with remote and local start using star delta starter.

    • Use a star delta starter for reduced voltage starting

    • Include a remote start/stop switch in the control circuit

    • Use a contactor to switch between star and delta connections

    • Include overload protection in the circuit

    • Use a control transformer to step down voltage for control circuit

    • Include a pilot light to indicate motor status

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - while You are experienced person on Your Field, Then Its also Necessary to Have Good Interview Practice Or Experience for passout the Interview. It is Beacuse to Some time Interview ask Very simple Question With Difficult manner and at that time how you react is Important.

I applied via Company Website and was interviewed in Jul 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. EOt Crane brief discription. In sense of electrical.
  • Ans. 

    EOt crane is an electric overhead traveling crane used for lifting and moving heavy loads in industrial settings.

    • EOt stands for Electric Overhead Traveling

    • It is operated by an electrical control system

    • It consists of a bridge, hoist, trolley, and electrical components

    • It is commonly used in factories, warehouses, and construction sites

    • It can lift and move heavy loads up to several tons

    • It requires regular maintenance and

  • Answered by AI
  • Q2. Proper knowledge of induction furnace pannel troling detailed, card function, module discription.
  • Q3. Transformer work, fault, solution.

Interview Preparation Tips

Interview preparation tips for other job seekers - Work like a practicaly and remind of logic and function.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. (1) tell your self, (2) Passt company work, (3) what is VFD and it's diagram, (4) Electrical maintenance related questions
  • Q2. Motor related questions
  • Q3. MCC and PCC panel
Round 3 - HR 

(1 Question)

  • Q1. (1) Salary discussion, (2) Experience related questions

Interview Questionnaire 

6 Questions

  • Q1. 1.what is composite error and ratio error in current transformer?
  • Ans. 

    Composite error and ratio error are two types of errors in current transformers.

    • Composite error is the combination of ratio error and phase angle error in a current transformer.

    • Ratio error is the difference between the actual turns ratio and the specified turns ratio of a current transformer.

    • Phase angle error is the angular difference between the primary and secondary currents of a current transformer.

    • Composite error a...

  • Answered by AI
  • Q2. 2.Draw ckt diagram of a.c drive.
  • Ans. 

    An AC drive circuit diagram controls the speed of an AC motor by varying the frequency and voltage of the power supplied to it.

    • An AC drive consists of a rectifier, DC link, inverter, and control circuitry.

    • The rectifier converts AC power to DC power, which is stored in the DC link.

    • The inverter converts the DC power back to AC power with variable frequency and voltage.

    • The control circuitry adjusts the frequency and volta...

  • Answered by AI
  • Q3. 3.Draw single line diagram of distribution system with proper secification.
  • Ans. 

    A single line diagram of a distribution system is required with proper specifications.

    • The diagram should show the flow of power from the source to the load

    • It should include all components such as transformers, switchgear, and cables

    • The specifications should include voltage levels, power ratings, and protection devices

    • The diagram should follow standard symbols and conventions

    • Example: A 11 kV distribution system with a 5

  • Answered by AI
  • Q4. 4.Why do the dewpoint test in transformer?
  • Ans. 

    Dewpoint test is done in transformer to check the moisture content in the insulation oil.

    • Moisture in insulation oil can cause breakdown of transformer insulation

    • Dewpoint test helps to determine the moisture content in the oil

    • It is a preventive maintenance measure to avoid transformer failure

    • The test involves cooling a mirror until dew forms on it, and measuring the temperature at which dew forms

  • Answered by AI
  • Q5. 5.What is the difference between power transformer and distribution transformer?
  • Ans. 

    Power transformers are used in transmission systems to step up or down voltage, while distribution transformers are used in distribution systems to step down voltage.

    • Power transformers are used in high voltage transmission systems to step up or down voltage for long distance transmission.

    • Distribution transformers are used in low voltage distribution systems to step down voltage for local distribution.

    • Power transformers...

  • Answered by AI
  • Q6. 6.How to work Buchholz relay in transformer.
  • Ans. 

    Buchholz relay is used to protect transformers from faults by detecting gas and oil flow abnormalities.

    • Buchholz relay is installed in the pipe connecting the transformer tank and conservator tank.

    • It operates based on the principle that faults in the transformer generate gases and cause oil flow disturbances.

    • When gas or oil flow abnormalities occur, the relay trips and sends a signal to the control panel to isolate the ...

  • Answered by AI

Interview Preparation Tips

Round: Resume Shortlist
Experience: My resume was shortlisted from naukri.com.

I applied via Company Website and was interviewed in Feb 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Current , Resistance, Transformer

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical , Technical Engineering

I applied via Naukri.com and was interviewed before Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Responsibility,projects handeled work life balance timing for job completion
  • Q2. What qas your role in organisation

Interview Preparation Tips

Interview preparation tips for other job seekers - please be formal add experince from last profile worked
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Mathematics,reasoning,science

Round 2 - Technical 

(4 Questions)

  • Q1. Machine,network,electronics
  • Q2. Logic gates, binary code
  • Q3. What is working pricniple of induction motor?
  • Ans. 

    An induction motor works on the principle of electromagnetic induction to generate rotating magnetic fields.

    • Induction motor has a stator with a set of windings that are connected to an AC power source.

    • When AC current flows through the stator windings, it creates a rotating magnetic field.

    • This rotating magnetic field induces current in the rotor windings, causing the rotor to rotate.

    • The speed of the rotor rotation is sl...

  • Answered by AI
  • Q4. Symbol of all logic gates??
  • Ans. 

    The symbols of logic gates include AND gate (&), OR gate (|), NOT gate (!), XOR gate (^), NAND gate (|), NOR gate (&), and XNOR gate (=).

    • AND gate symbol: &

    • OR gate symbol: |

    • NOT gate symbol: !

    • XOR gate symbol: ^

    • NAND gate symbol: |

    • NOR gate symbol: &

    • XNOR gate symbol: =

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Jindal Steel and Power Electrical Engineer interview:
  • Work and time
  • Profit and loss
  • Direction,coding decoding
  • Logic gate
  • Trasistor
  • Binary code
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How are home load of power plant received
  • Ans. 

    Home load of a power plant is received through a distribution network.

    • Home load is received from the power plant through a distribution network.

    • The power plant generates electricity and sends it to a substation.

    • The substation then distributes the electricity to homes through power lines.

    • The distribution network ensures that the electricity reaches each home efficiently.

    • Examples of distribution networks include overhead

  • Answered by AI
  • Q2. What is black out condition?
  • Ans. 

    A blackout condition refers to a complete loss of electrical power in a specific area or across a larger region.

    • Blackouts can be caused by various factors such as equipment failure, severe weather conditions, or intentional power cuts.

    • During a blackout, all electrical devices and systems dependent on electricity cease to function.

    • Blackouts can last for a few seconds, minutes, hours, or even days depending on the cause ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It best opportunity provide in the jobs and make it features on any person

JSW Steel Interview FAQs

How many rounds are there in JSW Steel Mechanical Foreman interview?
JSW Steel interview process usually has 2 rounds. The most common rounds in the JSW Steel interview process are Resume Shortlist and Technical.
How to prepare for JSW Steel Mechanical Foreman interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at JSW Steel. The most common topics and skills that interviewers at JSW Steel expect are Installation, Maintenance, Quality Standards, Repair and Supervision.
What are the top questions asked in JSW Steel Mechanical Foreman interview?

Some of the top questions asked at the JSW Steel Mechanical Foreman interview -

  1. chp. r.m.h.s belt conv. replace work. gearbox ripear & replace work. gearbox g...read more
  2. pellet plant. car pellet mantanace work. a.g.b mill maintanace work. id fan ba...read more
  3. chp rmhs project and maintanace work proper timely & safly work compli...read more

Tell us how to improve this page.

JSW Steel Mechanical Foreman Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 865 Interviews
Jindal Stainless Interview Questions
4.2
 • 216 Interviews
JSW Group Interview Questions
3.9
 • 111 Interviews
Jindal Saw Interview Questions
4.0
 • 107 Interviews
Electrotherm Interview Questions
4.2
 • 33 Interviews
Tata Metaliks Interview Questions
4.0
 • 32 Interviews
ESL Steel Interview Questions
4.0
 • 31 Interviews
View all
JSW Steel Mechanical Foreman Salary
based on 5 salaries
₹5.4 L/yr - ₹6.6 L/yr
8% less than the average Mechanical Foreman Salary in India
View more details
Assistant Manager
3.5k salaries
unlock blur

₹3.6 L/yr - ₹12.9 L/yr

Junior Engineer
2.2k salaries
unlock blur

₹2 L/yr - ₹5.5 L/yr

Deputy Manager
1.7k salaries
unlock blur

₹5.6 L/yr - ₹20 L/yr

Manager
1.1k salaries
unlock blur

₹7 L/yr - ₹22.5 L/yr

Senior Engineer
997 salaries
unlock blur

₹3 L/yr - ₹10.5 L/yr

Explore more salaries
Compare JSW Steel with

Tata Steel

4.1
Compare

Jindal Stainless

4.2
Compare

Jindal Saw

4.0
Compare

JSW Group

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview