A VFD gas analyzer system is a system that uses variable frequency drives to control the speed of the gas analyzer pump.
VFD gas analyzer systems are commonly used in industrial settings to monitor and control gas emissions.
The system uses a VFD to control the speed of the pump, which in turn controls the flow rate of the gas being analyzed.
This allows for more accurate and precise measurements of gas concentrations.
VFD...
The number of I/O in the plant is approximately X.
The exact number of I/O in the plant can vary depending on the size and complexity of the plant.
I/O stands for input/output and refers to the communication between different devices and systems in the plant.
The number of I/O can be determined by looking at the plant's control system documentation.
Some plants may have thousands of I/O points, while others may have only a...
Top trending discussions
I applied via Naukri.com and was interviewed before Mar 2021. There were 4 interview rounds.
Technical questions related to domain.
Carbonation is the process of dissolving carbon dioxide gas in a liquid.
Occurs naturally in carbonated mineral water
Used in the production of carbonated beverages
Can affect the pH of a liquid
Can cause corrosion in concrete structures
Pratical test by Auto level.
I appeared for an interview in Jul 2020.
I applied via Referral and was interviewed in Dec 2022. There were 5 interview rounds.
Jombay test only aptitude test
I applied via Indeed and was interviewed in Jul 2023. There were 2 interview rounds.
The erection of a cement mill involves the installation and assembly of the mill equipment and machinery.
The cement mill is typically a large cylindrical structure where raw materials are ground into fine powder.
The erection process includes the installation of the mill shell, liners, diaphragm, and grinding media.
Proper alignment and leveling of the mill components are crucial for efficient operation.
Electrical and me...
The procedure of erection involves the process of assembling and installing structural components to create a stable and functional structure.
Planning and preparation
Site preparation and foundation
Assembly of structural components
Installation of utilities and systems
Finishing and testing
Final inspection and handover
Planning of the erection involves creating a detailed plan for the construction process.
Identify the scope and objectives of the project
Determine the sequence of activities and their dependencies
Allocate resources and manpower
Create a schedule and timeline
Consider safety measures and risk management
Coordinate with other teams and stakeholders
Monitor progress and make adjustments as necessary
I applied via Job exchange and was interviewed before Nov 2022. There were 4 interview rounds.
Technical questions/screen test
I appeared for an interview before Feb 2024.
Comprehensive, non comprehensive questions and moral questions
I applied via Recruitment Consultant and was interviewed before Aug 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.
Assistant Manager
236
salaries
| ₹5.3 L/yr - ₹14.2 L/yr |
Deputy Manager
168
salaries
| ₹7 L/yr - ₹22.6 L/yr |
Sales Officer
161
salaries
| ₹1.9 L/yr - ₹7.7 L/yr |
Senior Officer
109
salaries
| ₹4.2 L/yr - ₹9.8 L/yr |
Senior Sales Officer
103
salaries
| ₹4.8 L/yr - ₹10.2 L/yr |
JK Cement
ACC
Ambuja Cements
Nuvoco Vistas