Filter interviews by
Be the first one to contribute and help others!
I applied via Company Website and was interviewed before Aug 2021. There were 2 interview rounds.
Pulling sub-stesan experience
Sub-stesan refers to a subset of a larger system or process
Pulling sub-stesan experience means extracting relevant information from a smaller part of a system
This experience can be useful in identifying and solving specific quality issues
Examples include analyzing data from a specific production line or testing a particular component of a product
I appeared for an interview in Jan 2021.
I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.
I appeared for an interview in Sep 2024, where I was asked the following questions.
Kaizen is a Japanese term meaning 'continuous improvement' in processes, products, and culture within organizations.
Originated in Japan post-World War II, focusing on efficiency and quality.
Involves all employees, encouraging suggestions for improvement.
Examples include streamlining workflows, reducing waste, and enhancing product quality.
Commonly used in manufacturing, healthcare, and service industries.
A CFT audit evaluates the effectiveness of cross-functional teams in achieving quality objectives and compliance standards.
Assesses team collaboration and communication in quality processes.
Identifies areas for improvement in product development cycles.
Ensures compliance with industry standards and regulations, e.g., ISO 9001.
Evaluates the effectiveness of quality control measures implemented by the team.
Provides feedb...
Poka Yoke is a quality assurance technique aimed at preventing errors in manufacturing processes.
Reduces human error by designing processes that prevent mistakes.
Examples include jigs that ensure parts are assembled correctly.
Enhances product quality and reliability, leading to customer satisfaction.
Can be applied in various industries, including automotive and electronics.
Encourages a culture of continuous improvement
Process quality ensures consistency, efficiency, and compliance, leading to better products and customer satisfaction.
Consistency: High process quality leads to uniformity in product output, reducing variability. For example, in manufacturing, consistent assembly line processes ensure that each product meets the same standards.
Efficiency: Streamlined processes minimize waste and reduce production time. For instance, im...
Sample verification criteria ensure quality and reliability in testing processes across various industries.
1. Sample Size: Ensure the sample size is statistically significant to represent the whole population. For example, testing 30 units from a batch of 1000.
2. Random Selection: Samples should be randomly selected to avoid bias. For instance, using a random number generator to pick samples.
3. Acceptance Criteria: Def...
I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.
Using PSCAD to create a grid-tied wind power plant
Create a new project in PSCAD
Design the wind turbine system with appropriate parameters
Connect the wind turbine system to the grid
Simulate the system to analyze its performance
Optimize the design for maximum efficiency
I applied via LinkedIn and was interviewed before Dec 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Mar 2024. There were 2 interview rounds.
Possible reasons for cube failure despite good materials
Improper mixing of materials
Incorrect curing process
Inadequate compaction of concrete
Presence of air voids or impurities
Poor quality control during manufacturing
Compression test is conducted after cube test to determine the compressive strength of concrete.
Compression test is conducted to determine the compressive strength of concrete.
It involves applying a gradually increasing load to the concrete specimen until failure.
The results of the compression test help in assessing the quality of the concrete mix and its ability to withstand compressive forces.
Compression test is an i...
The quantity of cement used in M35 grade concrete varies depending on the mix design and specifications.
The quantity of cement in M35 grade concrete typically ranges from 360 to 420 kg/m3.
The exact amount of cement needed can be calculated using the mix design provided for the project.
Factors such as water-cement ratio, aggregate size, and admixtures also influence the quantity of cement required.
Fire & Safety Engineer
3
salaries
| ₹6 L/yr - ₹6 L/yr |
Suzlon Group
Adani Power
Adani Group
NTPC