I applied via campus placement at Rajiv Gandhi Proudyogiki Vishwavidyalaya (RGPV), Bhopal and was interviewed in Mar 2023. There were 2 interview rounds.
CHP full farm stands for Combined Heat and Power full farm, which is a system that generates both electricity and heat from a single fuel source.
CHP full farm systems are designed to be highly efficient, utilizing waste heat to produce electricity and heat simultaneously.
These systems are commonly used in agricultural settings to provide power and heat for farm operations.
Examples of CHP full farm systems include bioga...
CHP stands for Coal Handling Plant, which is used to handle and process coal for power generation.
CHP is used in power plants to handle coal from unloading to storage and processing.
It involves processes like crushing, screening, conveying, and stacking of coal.
The main components of a CHP include coal crushers, belt conveyors, stacker-reclaimer, and dust extraction system.
Top trending discussions
I applied via Referral and was interviewed in Apr 2021. There were 4 interview rounds.
STP is a wastewater treatment plant that uses physical, chemical, and biological processes to remove pollutants from sewage.
STP receives sewage from households and industries through a network of underground pipes.
The sewage is screened to remove large objects and then sent to a grit chamber to remove sand and grit.
The sewage is then sent to a primary clarifier where solids settle to the bottom and are removed as sludg...
Transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers work on the principle of electromagnetic induction.
They consist of two or more coils of wire called windings.
The primary winding is connected to the input voltage source, while the secondary winding is connected to the load.
When an alternating current flows through the primary...
DG sets safety and operation are crucial for uninterrupted power supply.
DG sets should be installed in a well-ventilated area to avoid carbon monoxide poisoning.
Regular maintenance and testing of DG sets are necessary to ensure their safe operation.
Proper grounding and earthing of DG sets are essential to prevent electrical hazards.
Emergency stop buttons and alarms should be installed to shut down the DG sets in case o...
posted on 20 Sep 2021
I applied via Referral and was interviewed before Jan 2021. There was 1 interview round.
Senior Engineer
9
salaries
| ₹8 L/yr - ₹9 L/yr |
Accountant
6
salaries
| ₹1.8 L/yr - ₹3.2 L/yr |
Engineer
6
salaries
| ₹3 L/yr - ₹6 L/yr |
Sales Executive
5
salaries
| ₹2.4 L/yr - ₹3.6 L/yr |
Senior Associate
5
salaries
| ₹20 L/yr - ₹30.5 L/yr |
Larsen & Toubro Limited
Hindustan Construction Company
GAMMON INDIA
Simplex Infrastructures