Filter interviews by
I applied via Walk-in and was interviewed in Nov 2020. There was 1 interview round.
Moulding defect refers to any imperfection or flaw in the manufacturing process of moulded products.
Moulding defects can occur due to various reasons such as improper material flow, inadequate cooling, or incorrect mould design.
Examples of moulding defects include flash, sink marks, warpage, voids, and short shots.
Flash occurs when excess material escapes from the mould, resulting in a thin layer of material around the...
Silver marks can be controlled by using protective coatings and proper cleaning techniques.
Apply a protective coating, such as lacquer or wax, to prevent silver from tarnishing
Store silver items in airtight containers or with anti-tarnish strips to minimize exposure to air
Avoid contact with substances that can cause silver to tarnish, such as sulfur-containing materials
Clean silver regularly using gentle methods, such ...
Top trending discussions
posted on 20 Nov 2021
I applied via Naukri.com and was interviewed in May 2021. There was 1 interview round.
posted on 3 Feb 2022
I applied via Walk-in and was interviewed before Feb 2021. There was 1 interview round.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
posted on 21 Mar 2024
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
posted on 11 Oct 2020
I applied via Recruitment Consulltant and was interviewed in Oct 2020. There were 5 interview rounds.
posted on 19 Feb 2024
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 28 Mar 2024
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
The process of erection of duct involves planning, fabrication, transportation, installation, and testing.
Planning involves determining the layout, size, and material of the ducts.
Fabrication includes cutting, bending, and assembling the ducts according to the design.
Transportation is the movement of fabricated ducts to the installation site.
Installation involves positioning and connecting the ducts to the HVAC system.
...
The code followed for the fabrication of steel structure materials is typically based on industry standards and regulations.
The fabrication of steel structures is typically governed by codes such as the American Institute of Steel Construction (AISC) Code of Standard Practice.
Other codes that may be followed include the American Welding Society (AWS) D1.1 Structural Welding Code - Steel.
Fabrication processes must also ...
The erection sequence of a steel structure involves planning and executing the assembly of components in a specific order to ensure safety and stability.
Start by assembling the foundation and anchor bolts.
Next, erect the columns and connect them to the foundation.
Then, install the beams and trusses to form the framework.
After that, add the bracing and diagonal members for stability.
Finally, complete the structure by ad...
posted on 16 Oct 2024
The erection sequence of ESP involves several steps to ensure proper installation and functioning.
1. Prepare the foundation for the ESP unit.
2. Install the support structure for the ESP.
3. Assemble the ESP components such as the casing, electrodes, and rapping system.
4. Connect the necessary electrical and mechanical components.
5. Test the ESP system for proper functioning before commissioning.
6. Commission the ESP sys...
Various ESP materials suppliers include Schlumberger, Baker Hughes, Halliburton, Weatherford, and National Oilwell Varco.
Schlumberger
Baker Hughes
Halliburton
Weatherford
National Oilwell Varco
based on 12 reviews
Rating in categories
Engineer
102
salaries
| ₹2 L/yr - ₹5.2 L/yr |
Assistant Engineer
101
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Production Engineer
68
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Junior Engineer
65
salaries
| ₹1.7 L/yr - ₹3.5 L/yr |
Quality Engineer
59
salaries
| ₹1.5 L/yr - ₹5.2 L/yr |
Thermax Limited
ABB
Tractors and Farm Equipment
Isgec Heavy Engineering