Filter interviews by
I applied via AmbitionBox and was interviewed in Mar 2024. There was 1 interview round.
There are mainly two types of transformers: step-up transformers and step-down transformers.
Step-up transformers increase voltage levels, while step-down transformers decrease voltage levels.
Transformers can also be classified based on their construction, such as core type transformers and shell type transformers.
Other types of transformers include distribution transformers, power transformers, and instrument transform
The number of HVAC AHUs can vary depending on the size and layout of the building.
The number of HVAC AHUs is typically determined by the size of the building and the specific heating and cooling needs of different areas.
Large commercial buildings may have multiple HVAC AHUs to efficiently regulate temperature throughout the space.
Residential buildings may have a single HVAC AHU serving the entire home.
HVAC AHUs can als...
I applied via Company Website and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed in May 2021. There were 3 interview rounds.
Transformers work by converting electrical energy from one circuit to another through electromagnetic induction.
Transformers have two coils of wire, a primary coil and a secondary coil.
The primary coil is connected to a power source and produces a magnetic field when current flows through it.
The magnetic field induces a voltage in the secondary coil, which is connected to the load.
The voltage in the secondary coil is p...
There can be multiple causes for an alternator to not start.
Dead battery
Faulty alternator
Broken or loose belts
Faulty voltage regulator
Bad wiring or connections
I applied via Referral and was interviewed in Jan 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.
Shunt relay is connected in parallel with the main circuit of the ACB.
It detects overcurrents and activates to divert the excess current through a shunt path.
This helps in protecting the main circuit from damage due to overcurrents.
Shunt relays are commonly used in Air Circuit Breakers (ACBs...
CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.
CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.
It is often required in HVAC projects to ensure quality and compliance.
CoC may include details such as product specifications, testing results, and manufacturer information.
Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.
Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.
Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.
BOD is a ...
A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.
Monitors voltage levels in electrical systems
Triggers alarm or protective action if voltage exceeds or falls below set threshold
Used to protect equipment from damage due to voltage fluctuations
WTP plant works on the principle of physical and chemical processes to remove impurities from water.
Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.
Coagulation involves adding chemicals to water to make impurities clump together.
Flocculation helps in forming larger particles called floc for easier removal.
Sedimentation allows the floc to sett...
I provide daily and monthly reports on project progress, issues, and key metrics to track performance.
Daily reports include updates on tasks completed, challenges faced, and plans for the next day.
Monthly reports summarize overall progress, budget status, and any potential risks or delays.
Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...
based on 1 interview
Interview experience
Software Engineer2
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Data Engineer
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Data Quality Analyst
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Business Analyst
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Software Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
CBRE
Colliers India
Cushman & Wakefield
Knight Frank