Upload Button Icon Add office photos

Filter interviews by

JLL Technologies Shift Engineer Interview Questions and Answers

Updated 5 Apr 2024

JLL Technologies Shift Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via AmbitionBox and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. How many dg cheack
  • Q2. How many type transformer
  • Ans. 

    There are mainly two types of transformers: step-up transformers and step-down transformers.

    • Step-up transformers increase voltage levels, while step-down transformers decrease voltage levels.

    • Transformers can also be classified based on their construction, such as core type transformers and shell type transformers.

    • Other types of transformers include distribution transformers, power transformers, and instrument transform

  • Answered by AI
  • Q3. How many hvac ahu
  • Ans. 

    The number of HVAC AHUs can vary depending on the size and layout of the building.

    • The number of HVAC AHUs is typically determined by the size of the building and the specific heating and cooling needs of different areas.

    • Large commercial buildings may have multiple HVAC AHUs to efficiently regulate temperature throughout the space.

    • Residential buildings may have a single HVAC AHU serving the entire home.

    • HVAC AHUs can als...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Job must have

Interview questions from similar companies

I applied via Company Website and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. About working at previous work done and electrical engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - NA

I applied via Walk-in and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. System related
  • Q2. Building compliance etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Residential site system and compliance related services

I applied via Company Website and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How to work transformer.
  • Ans. 

    Transformers work by converting electrical energy from one circuit to another through electromagnetic induction.

    • Transformers have two coils of wire, a primary coil and a secondary coil.

    • The primary coil is connected to a power source and produces a magnetic field when current flows through it.

    • The magnetic field induces a voltage in the secondary coil, which is connected to the load.

    • The voltage in the secondary coil is p...

  • Answered by AI
  • Q2. How many causes do not start the alternator.
  • Ans. 

    There can be multiple causes for an alternator to not start.

    • Dead battery

    • Faulty alternator

    • Broken or loose belts

    • Faulty voltage regulator

    • Bad wiring or connections

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I really enjoying my interview time. I am not nervous in this time.

Skills evaluated in this interview

I applied via Referral and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All Technical questions related to commercial site

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was related to technical issues majorly LT,HT,VCB,ACB ,relays,WTP, STP HVAC it was a phone call interview it held approx 45 mins I couldn't give some answers but after interview my interviewer briefed me about that.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. All technical equipment
  • Q2. All SOP And AMC
  • Q3. DG sets and oil type transformer and dry type transformer.
  • Q4. Firefiting systems and STP and WTP plat
Round 2 - Technical 

(2 Questions)

  • Q1. All technical equipment
  • Q2. WTP and STP and fire

Interview Preparation Tips

Interview preparation tips for other job seekers - Shift Engineer
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Total Work experience Previous company Role and responsibility Current CTC
Round 3 - Technical 

(1 Question)

  • Q1. Technical skill DG sefty Transformer Sefty working principles All types breakers sefty SLD from HT line to LT line

Interview Preparation Tips

Interview preparation tips for other job seekers - You should be have good technical knowledge and skills
Be confidence
Do not nervous
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About building operations and maintenances.
Round 3 - Salary 

(1 Question)

  • Q1. Depend upon company norms

Interview Preparation Tips

Interview preparation tips for other job seekers - WORK HARD that one day your signature will be called an AUTOGRAPH

JLL Technologies Interview FAQs

How many rounds are there in JLL Technologies Shift Engineer interview?
JLL Technologies interview process usually has 1 rounds. The most common rounds in the JLL Technologies interview process are HR.
What are the top questions asked in JLL Technologies Shift Engineer interview?

Some of the top questions asked at the JLL Technologies Shift Engineer interview -

  1. How many type transfor...read more
  2. How many hvac ...read more
  3. How many dg che...read more

Tell us how to improve this page.

JLL Technologies Shift Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more
Software Engineer2
18 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Data Engineer
12 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Data Quality Analyst
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Business Analyst
9 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Software Engineer
9 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare JLL Technologies with

CBRE

4.2
Compare

Colliers India

3.9
Compare

Cushman & Wakefield

4.2
Compare

Knight Frank

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview