Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by JLL Team. If you also belong to the team, you can get access from here

JLL Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

JLL HSE Engineer Interview Questions and Answers

Updated 16 Mar 2022

JLL HSE Engineer Interview Experiences

1 interview found

HSE Engineer Interview Questions & Answers

user image Anonymous

posted on 16 Mar 2022

I applied via Indeed and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Hazards identification and risk assessment

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident deliver answer very precisely and briefly

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary

I applied via Recruitment Consulltant and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. What is cap rate? How do you calculate it?
  • Ans. 

    Cap rate is a real estate metric used to determine the potential return on investment.

    • Cap rate stands for capitalization rate.

    • It is calculated by dividing the net operating income (NOI) by the property's value.

    • The result is expressed as a percentage and represents the rate of return an investor can expect from the property.

    • A higher cap rate indicates a higher potential return on investment, but may also indicate higher...

  • Answered by AI
Round 2 - One-on-one 

(1 Question)

  • Q1. Just a general conversation with the MD.

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident and research the company well.

Manager Interview Questions & Answers

CBRE user image Anonymous

posted on 25 Nov 2021

I applied via Referral and was interviewed before Nov 2020. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About yourself and questions relevant to your profile..
  • Q2. Thoroughly explore your current work in detail because your questions will be based on your current work mostly

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident in your response and listen to interviewer carefully so you will not ask the question to be repeated..

I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About project management

Interview Preparation Tips

Interview preparation tips for other job seekers - Require project along with technical knowledge.

I applied via Referral and was interviewed before Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. 1. Tell us about your previous projects 2. Tell us about your previous roles and responsibilities 3. Tell us can you handle pressure

Interview Preparation Tips

Interview preparation tips for other job seekers - They had hired me through a third party, but except the offer letter everything is same,
Usually all the pmc will be wanting approval from the client, so your job is to impress the client not the pmc

I applied via Referral and was interviewed in Jan 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What is your current salary

Interview Preparation Tips

Interview preparation tips for other job seekers - No professional and personal growth

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Safety Induction, Permits etc

Interview Preparation Tips

Interview preparation tips for other job seekers - 30mins by the project Head
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. What is a BOQ?
  • Ans. 

    A BOQ stands for Bill of Quantities, which is a document used in construction projects to list the materials, parts, and labor needed for a project.

    • A BOQ is typically prepared by a quantity surveyor or estimator.

    • It includes detailed information on quantities, unit rates, and total costs for each item in the project.

    • BOQs are used to help contractors and clients understand the scope of work and costs involved in a projec...

  • Answered by AI
  • Q2. What are your strength?
  • Q3. What is a contract?
  • Ans. 

    A contract is a legally binding agreement between two or more parties that outlines the terms and conditions of their relationship.

    • A contract must involve an offer, acceptance, consideration, and intention to create legal relations.

    • Contracts can be written or oral, but written contracts are generally more enforceable.

    • Examples of contracts include employment agreements, rental agreements, and sales contracts.

  • Answered by AI
  • Q4. Do you know about fidic?
  • Ans. 

    FIDIC stands for International Federation of Consulting Engineers, which publishes standard contracts for the construction industry.

    • FIDIC is an acronym for International Federation of Consulting Engineers.

    • FIDIC publishes standard contracts for the construction industry.

    • FIDIC contracts are commonly used in international construction projects.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be honest and answer confidentally

JLL Interview FAQs

How many rounds are there in JLL HSE Engineer interview?
JLL interview process usually has 1 rounds. The most common rounds in the JLL interview process are Technical.

Tell us how to improve this page.

Interview Questions from Similar Companies

CBRE Interview Questions
4.2
 • 267 Interviews
NoBroker Interview Questions
3.2
 • 235 Interviews
Colliers India Interview Questions
3.9
 • 66 Interviews
K Raheja Corp Interview Questions
4.3
 • 46 Interviews
Knight Frank Interview Questions
4.0
 • 43 Interviews
SMEC Interview Questions
3.8
 • 26 Interviews
ASSA ABLOY Interview Questions
3.5
 • 17 Interviews
View all
JLL HSE Engineer Salary
based on 5 salaries
₹2.7 L/yr - ₹8.3 L/yr
39% less than the average HSE Engineer Salary in India
View more details

JLL HSE Engineer Reviews and Ratings

based on 4 reviews

3.3/5

Rating in categories

3.3

Skill development

3.0

Work-life balance

2.9

Salary

3.0

Job security

2.9

Company culture

3.2

Promotions

3.3

Work satisfaction

Explore 4 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹3.5 L/yr - ₹14.5 L/yr

Facility Executive
996 salaries
unlock blur

₹2.2 L/yr - ₹6 L/yr

Assistant Project Leader
565 salaries
unlock blur

₹3.3 L/yr - ₹12 L/yr

Senior Analyst
557 salaries
unlock blur

₹3 L/yr - ₹12.1 L/yr

Assistant Facility Manager
523 salaries
unlock blur

₹3 L/yr - ₹10.3 L/yr

Explore more salaries
Compare JLL with

CBRE

4.2
Compare

NoBroker

3.2
Compare

Cushman & Wakefield

4.1
Compare

Colliers India

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview