SCADA can be configured by setting up communication protocols, defining data points, creating graphical interfaces, and configuring alarms.
Set up communication protocols such as Modbus, DNP3, or OPC to communicate with field devices
Define data points by specifying the tags for each device or sensor being monitored
Create graphical interfaces by designing screens that display real-time data in a user-friendly format
Confi...
I/O modules can be configured by setting up the input and output signals, assigning addresses, and configuring communication protocols.
Identify the type of I/O module being used (analog, digital, etc.)
Assign addresses to the input and output signals for communication
Configure the communication protocols such as Modbus, Profibus, etc.
Set up the parameters for data transmission and reception
Test the configured I/O module
Assigning an IP address involves configuring the network settings of a device to enable communication with other devices on the same network.
Access the network settings of the device
Choose a suitable IP address based on the network's subnet
Assign the IP address along with subnet mask and default gateway
Ensure no IP address conflicts with other devices on the network
Save the settings and test the connection
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Feb 2023. There were 3 interview rounds.
Yes
Yes, I have audited suppliers and conducted vendor visits.
During my previous role as a Senior Engineer, I was responsible for auditing suppliers to ensure compliance with quality standards and specifications.
I have also conducted vendor visits to assess their capabilities, production processes, and quality control measures.
These audits and visits helped in identifying potential risks, improving supplier performance,...
I applied via Recruitment Consulltant and was interviewed in Jan 2022. There were 3 interview rounds.
Create a list of tuples whose sum is unique in another array.
Create an empty dictionary to store the sum as key and tuple as value
Iterate through the array and for each element, iterate through the remaining elements to find the sum
If the sum is not in the dictionary, add it with the tuple as value
If the sum is already in the dictionary, skip it
Return the list of tuples
I applied via LinkedIn and was interviewed in Nov 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.
I applied via Referral and was interviewed before Jul 2023. There were 2 interview rounds.
Codility test consisting of MCQ questions and 2 OOPS design questions or 1 OOPS design question and 1 DSA question
Various t-codes are used in SAP MM module for different purposes.
MM01 - Create Material Master
MM02 - Change Material Master
MM03 - Display Material Master
ME21N - Create Purchase Order
ME22N - Change Purchase Order
ME23N - Display Purchase Order
MIGO - Goods Movement
MIRO - Invoice Verification
MB51 - Material Document List
ME2N - Purchase Orders by PO Number
ME2M - Purchase Orders by Material
ME2L - Purchase Orders by Vendor
ME2
I appeared for an interview before Mar 2024.
Past experience based questions
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Oprating Engineer
375
salaries
| ₹1.7 L/yr - ₹6.6 L/yr |
Assistant Manager
297
salaries
| ₹5 L/yr - ₹13 L/yr |
Sales Officer
226
salaries
| ₹2.2 L/yr - ₹7.7 L/yr |
Senior Sales Officer
188
salaries
| ₹4 L/yr - ₹10.5 L/yr |
Deputy Manager
156
salaries
| ₹6.2 L/yr - ₹16.1 L/yr |
Bosch
UNO Minda
Apollo Tyres
Yazaki