Filter interviews by
I applied via Approached by Company and was interviewed before Feb 2022. There were 2 interview rounds.
Yes, I know how to mark levels.
Marking levels involves determining the elevation of a point on the ground and then marking it on a surface or object.
This can be done using a variety of tools such as a level, a theodolite, or a laser level.
The marked levels are used to ensure that a surface or object is level or sloped correctly, such as in road construction or building foundations.
P&P stands for Policies and Procedures. Cross section is a view of the road or highway from the side.
Policies and Procedures (P&P) are the guidelines and rules that govern the design, construction, and maintenance of highways and roads.
Cross section is a view of the road or highway from the side, showing the different layers of materials used in construction, such as the pavement, subgrade, and drainage.
Cross section a...
MDD and FDD are measures of soil compaction. Testing involves determining the maximum dry density and optimum moisture content.
MDD stands for Maximum Dry Density and FDD stands for Field Dry Density
Testing involves determining the maximum dry density and optimum moisture content of the soil sample
The testing procedure involves compacting the soil sample in a mold with a known volume and measuring its weight and moistur...
Compaction requirements for embankment and subgrade depend on soil type and project specifications.
Compaction requirements are determined by soil type and project specifications.
Embankment and subgrade compaction is typically measured by a Proctor test.
Compaction requirements can range from 90-95% of maximum dry density.
Compaction must be uniform and consistent throughout the project area.
Proper compaction ensures stab
Top trending discussions
based on 1 review
Rating in categories
HR Manager
3
salaries
| ₹6 L/yr - ₹6 L/yr |
Engineer Trainee
3
salaries
| ₹2 L/yr - ₹2 L/yr |
Highway Engineer
3
salaries
| ₹1.4 L/yr - ₹3.6 L/yr |
TCS
Accenture
Cognizant
Infosys