Upload Button Icon Add office photos

Filter interviews by

Intertouch Metal Buildings Interview Questions and Answers for Freshers

Updated 28 Dec 2023

Intertouch Metal Buildings Interview Experiences for Freshers

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Construction related

Round 3 - HR 

(1 Question)

  • Q1. Construction related how many experience

Senior Site Engineer Interview Questions asked at other Companies

Q1. How many days will take 1st Aluform mockup Concreting
View answer (1)

Jobs at Intertouch Metal Buildings

View all

Interview questions from similar companies

I applied via Referral and was interviewed in Sep 2022. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Relevant to specific subject.
  • Q2. What is your subject knowledge?
  • Ans. 

    I have a strong subject knowledge in my field of engineering.

    • I have a deep understanding of the core concepts and principles of my field.

    • I keep myself updated with the latest advancements and trends in my field.

    • I have hands-on experience in implementing various engineering solutions.

    • I have a good understanding of related fields such as mathematics, physics, and computer science.

    • I have excellent problem-solving skills a...

  • Answered by AI
  • Q3. How much time you will stay ?
Round 3 - Case Study 

Experience of experience to explain in detail.

Round 4 - HR 

(1 Question)

  • Q1. Document & Annexure Acceptances.
Round 5 - HR 

(1 Question)

  • Q1. Negotiation round with candidate to take it low as usual HR do.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be real & answer to specific question with authentic data

I applied via Naukri.com and was interviewed in Aug 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What is known afeican countryeis?
  • Ans. 

    Africa is a continent with 54 countries, each with its own unique culture, history, and natural resources.

    • Africa has 54 countries

    • The largest country in Africa is Algeria

    • The most populous country in Africa is Nigeria

    • Egypt is known for its ancient pyramids and Sphinx

    • South Africa is known for its wildlife and natural beauty

    • Kenya is known for its wildlife and safaris

    • Ethiopia is known for its coffee and ancient history

    • Ghana...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Frist known other countrieys rules & regluation .
Be positive good eperiance
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Apr 2022.

Round 1 - One-on-one 

(2 Questions)

  • Q1. 1) overhauling of maintenance. 2) what is the function of cooling tower.
  • Ans. 

    A cooling tower is a device used to remove heat from a building or industrial process.

    • The function of a cooling tower is to cool down water or other fluids by extracting heat from them.

    • Cooling towers are commonly used in HVAC systems, power plants, and industrial processes.

    • They work by evaporating a small portion of the water, which removes heat and cools down the remaining water.

    • The cooled water is then circulated bac...

  • Answered by AI
  • Q2. How to dismental of boiler feed pump
  • Ans. 

    To dismantle a boiler feed pump, follow these steps

    • Isolate the pump from the power source and drain the water from the system

    • Remove the coupling and motor from the pump

    • Disconnect the suction and discharge piping from the pump

    • Remove the bolts and nuts that hold the pump casing together

    • Lift the casing off the pump and remove the impeller and shaft

    • Inspect and clean all parts before reassembling or replacing

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Automation related questions basic of PLC like AB and Siemens make plc,encoder,pannel min earthing voltage, scada,starter software
  • Q2. Electrical maintenance related questions basics
  • Q3. What Is MTTR and MTBF
  • Ans. 

    MTTR stands for Mean Time To Repair and MTBF stands for Mean Time Between Failures.

    • MTTR is the average time taken to repair a failed component or system.

    • MTBF is the average time between failures of a component or system.

    • MTTR is calculated as total downtime divided by the number of failures.

    • MTBF is calculated as total uptime divided by the number of failures.

    • For example, if a system has an MTTR of 2 hours and an MTBF of...

  • Answered by AI
  • Q4. Substation related questions basics
  • Q5. What is data type,string in plc
  • Ans. 

    Data type string in PLC is used to store alphanumeric characters or text data.

    • String data type is used to store text data in PLC programming.

    • Strings can be used to store alphanumeric characters, words, sentences, etc.

    • Example: STRING name := 'John Smith';

  • Answered by AI

Skills evaluated in this interview

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Sub station Earthing,Earth mat details
Round 2 - HR 

(1 Question)

  • Q1. Salary breakup explained and final negotiaition

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for Sub station and Transmission line execution and particularly Earthing details because in Central Africa most of the work is Earthing only in all projects.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Apr 2024, where I was asked the following questions.

  • Q1. What does it mean about engine stall & how it conduct??
  • Q2. Hydraulic circuit.

I applied via Company Website and was interviewed in May 2019. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Fire system installation as per NBC
  • Ans. 

    Fire system installation as per NBC

    • NBC stands for National Building Code of India

    • Fire system installation must comply with NBC guidelines

    • NBC guidelines include requirements for fire detection, alarm, and suppression systems

    • Installation must be done by certified professionals

    • Regular maintenance and testing is required to ensure system effectiveness

  • Answered by AI
  • Q2. ABOUT OSHAS DOCUMANTATION

Interview Preparation Tips

Interview preparation tips for other job seekers - please study about all standards deeply. And compliance . Also u have to know about statutory compliances pollution& environmental related activities.

I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

All job related & experience. Family details

Interview Preparation Tips

Topics to prepare for Nava Limited Chief Security and Vigilance Officer interview:
  • Job related only
Interview preparation tips for other job seekers - Good company. Management is good. Facilities and colony is very good. You no need to go anywhere. School, store, temple and also gas also available in the colony.

I applied via Referral and was interviewed before Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What do you know about our company.
  • Q2. Autocad knowledge
  • Q3. Aluform knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Autocad and solidworks must needed

Intertouch Metal Buildings Interview FAQs

How many rounds are there in Intertouch Metal Buildings interview for freshers?
Intertouch Metal Buildings interview process for freshers usually has 3 rounds. The most common rounds in the Intertouch Metal Buildings interview process for freshers are Resume Shortlist, Aptitude Test and HR.
How to prepare for Intertouch Metal Buildings interview for freshers?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Intertouch Metal Buildings. The most common topics and skills that interviewers at Intertouch Metal Buildings expect are Counselling, Digital Marketing, Market Development, Mechanical Engineering and PEB.

Tell us how to improve this page.

Intertouch Metal Buildings Interview Process for Freshers

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Nava Limited Interview Questions
3.8
 • 19 Interviews
NLMK India Interview Questions
3.6
 • 16 Interviews
Nagata India Interview Questions
3.9
 • 9 Interviews
Imerys Interview Questions
3.7
 • 9 Interviews
View all

Intertouch Metal Buildings Reviews and Ratings

based on 14 reviews

3.8/5

Rating in categories

3.6

Skill development

3.3

Work-life balance

3.2

Salary

2.7

Job security

3.0

Company culture

3.0

Promotions

3.4

Work satisfaction

Explore 14 Reviews and Ratings
Senior Site Engineer

Chennai

1-6 Yrs

Not Disclosed

Marketing Manager /Site Engineer

Chennai

1-6 Yrs

Not Disclosed

Explore more jobs
Site Engineer
7 salaries
unlock blur

₹2.2 L/yr - ₹4.2 L/yr

Site Incharge
5 salaries
unlock blur

₹3.8 L/yr - ₹5 L/yr

Safety Engineer
5 salaries
unlock blur

₹2 L/yr - ₹3.2 L/yr

Project Manager
4 salaries
unlock blur

₹5 L/yr - ₹7.5 L/yr

Project Engineer
4 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Explore more salaries
Compare Intertouch Metal Buildings with

African Industries

4.1
Compare

Nava Limited

3.8
Compare

Nagata India

3.9
Compare

Knest Manufacturers

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview