Premium Employer

i

This company page is being actively managed by Intertek Team. If you also belong to the team, you can get access from here

Intertek Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Intertek Senior Inspection Engineer Interview Questions, Process, and Tips

Updated 17 Oct 2023

Intertek Senior Inspection Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(5 Questions)

  • Q1. Types of valve and their functions?
  • Ans. 

    Valves are mechanical devices used to control the flow of fluids within a system. They can be classified into different types based on their design and function.

    • Gate valves: used to fully open or close the flow of fluid

    • Ball valves: have a spherical closure element to control flow

    • Check valves: allow flow in one direction only to prevent backflow

    • Butterfly valves: have a disc that rotates to control flow

    • Pressure relief va...

  • Answered by AI
  • Q2. Defect of welding
  • Ans. 

    Defects in welding can compromise the integrity of the joint and lead to structural failures.

    • Common welding defects include porosity, lack of fusion, cracks, and undercutting.

    • Porosity is caused by gas entrapment during the welding process.

    • Lack of fusion occurs when the weld metal fails to fuse with the base metal.

    • Cracks can result from excessive stress or improper cooling of the weld.

    • Undercutting is a groove formation ...

  • Answered by AI
  • Q3. Tolerance of UT test
  • Ans. 

    The tolerance of UT test refers to the acceptable range of error in the test results.

    • Tolerance is typically specified in the testing standards or procedures.

    • It is important to ensure that the equipment used for UT testing is calibrated within the specified tolerance limits.

    • Deviation from the tolerance range may indicate a need for retesting or further investigation.

    • Examples of tolerance limits for UT testing may includ

  • Answered by AI
  • Q4. What is WPS ,PQR
  • Ans. 

    WPS stands for Welding Procedure Specification and PQR stands for Procedure Qualification Record.

    • WPS is a document that provides detailed welding instructions and parameters for a specific welding job.

    • PQR is a record of the welding parameters used during the qualification of a welding procedure.

    • WPS and PQR are essential documents in the welding industry to ensure quality and consistency in welding processes.

  • Answered by AI
  • Q5. Structure alignment

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

Installation of field testing & loop check ,function test, Construction supervision work related Instrument & control system.

Round 3 - Technical 

(3 Questions)

  • Q1. ITP, QCP, Method statement
  • Q2. Difine ITP? All Inspection should be done on the basis of approved ITP which consist of following sections. Activity Description,Responsible person,quality I spectikn activity, reference drawing and Specif...
  • Ans. 

    ITP stands for Inspection and Test Plan, which outlines the activities, responsibilities, quality inspection criteria, acceptance criteria, and verification documents for inspections.

    • ITP stands for Inspection and Test Plan.

    • It includes sections such as Activity Description, Responsible person, Quality Inspection activity, Reference drawing and Specification, Acceptance criteria, Verifying document ITR, and Intervention ...

  • Answered by AI
  • Q3. Explain Intervention point :-W,S,A,M,R,H
  • Ans. 

    Intervention point refers to the locations where welding, stress relieving, annealing, machining, radiography, and hardness testing are performed during the inspection process.

    • W - Welding: Inspection of weld joints for defects and quality.

    • S - Stress Relieving: Checking for stress relief after welding to prevent cracking.

    • A - Annealing: Heat treatment process to soften material and improve machinability.

    • M - Machining: In...

  • Answered by AI
Round 4 - HR 

(1 Question)

  • Q1. EXP and Project details salary in Previous company

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready ur self
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. All Questions from QA QC Civil work
  • Q2. You Must study IS Code and QA QC job role.

Interview Preparation Tips

Interview preparation tips for other job seekers - Please don't Join SGS if possible look another option if available.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

MCQ question Electrical & Reasoning

Round 2 - Technical 

(5 Questions)

  • Q1. What's is transformer & why use
  • Q2. Why step up & step down voltage
  • Q3. What is power factor and frequency
  • Q4. What's is Earthing
  • Q5. Draw Single line diagram of generation & distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Nothing
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Mechanical Inspection related question
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Oct 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Concrete cube mould tolerance ??
  • Ans. 

    Concrete cube mould tolerance refers to the acceptable range of dimensions for the mould used to cast concrete cubes for testing.

    • Concrete cube mould tolerance is typically around +/- 1mm for most standard moulds.

    • Tolerance may vary depending on the specific standards or specifications being followed.

    • It is important to ensure that the mould used meets the required tolerance to ensure accurate test results.

    • Examples of con...

  • Answered by AI
  • Q2. First class brick strength ??
  • Ans. 

    The strength of first class bricks is typically around 10.5 N/mm^2 to 14 N/mm^2.

    • First class bricks are high-quality bricks used for construction.

    • They have a minimum crushing strength of 10.5 N/mm^2.

    • The maximum crushing strength of first class bricks is around 14 N/mm^2.

    • These bricks are uniform in shape and size, with sharp edges and smooth surfaces.

  • Answered by AI
  • Q3. Maximum concrete pouring height ??
  • Ans. 

    The maximum concrete pouring height depends on various factors such as the type of concrete, formwork design, and weather conditions.

    • Maximum concrete pouring height for normal concrete is typically around 1.5 to 2 meters.

    • For high-performance concrete, the maximum pouring height may be reduced to around 1 meter.

    • Factors such as formwork stability, concrete mix design, and weather conditions can affect the maximum pouring...

  • Answered by AI
  • Q4. What is the ratio of m25 concrete ??
  • Ans. 

    The ratio of M25 concrete is 1:1:2

    • The ratio of M25 concrete is 1 part cement, 1 part sand, and 2 parts aggregate

    • This ratio is commonly used in construction for medium strength concrete

    • For example, to make 1 cubic meter of M25 concrete, you would need 1/4 cubic meters of cement, 1/4 cubic meters of sand, and 1/2 cubic meters of aggregate

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Answer with correct word and also using the technical term
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jul 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Inspection related
  • Q2. Hydrotest
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Before work and study level
Round 3 - Technical 

(1 Question)

  • Q1. Work experience based
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How much gap required in fit-up of pipes.?
  • Ans. 

    The gap required in fit-up of pipes depends on the welding process and material being used.

    • The gap for TIG welding is typically 1/16 to 1/8 inch.

    • For MIG welding, the gap can be slightly larger, around 3/32 to 1/8 inch.

    • The gap should be uniform along the entire length of the joint for proper welding.

    • The material being welded also influences the gap size, with thicker materials requiring larger gaps.

  • Answered by AI
  • Q2. What is IQI in radiography testing
  • Ans. 

    IQI stands for Image Quality Indicator, used in radiography testing to ensure the quality of the radiographic image.

    • IQI is a tool used to determine the quality of radiographic images by measuring the image quality parameters such as contrast, resolution, and sensitivity.

    • It consists of a series of patterns or objects with specific details that are placed on the radiographic film along with the test object.

    • The IQI is the...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through codes and standards before going for interview such as ASME SECTION 8, SECTIONS 9, SECTION 5, SECTION 2
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Group Discussion 

Installation of field testing & loop check ,function test, Construction supervision work related Instrument & control system.

Round 3 - Technical 

(3 Questions)

  • Q1. ITP, QCP, Method statement
  • Q2. Difine ITP? All Inspection should be done on the basis of approved ITP which consist of following sections. Activity Description,Responsible person,quality I spectikn activity, reference drawing and Specif...
  • Ans. 

    ITP stands for Inspection and Test Plan, which outlines the activities, responsibilities, quality inspection criteria, acceptance criteria, and verification documents for inspections.

    • ITP stands for Inspection and Test Plan.

    • It includes sections such as Activity Description, Responsible person, Quality Inspection activity, Reference drawing and Specification, Acceptance criteria, Verifying document ITR, and Intervention ...

  • Answered by AI
  • Q3. Explain Intervention point :-W,S,A,M,R,H
  • Ans. 

    Intervention point refers to the locations where welding, stress relieving, annealing, machining, radiography, and hardness testing are performed during the inspection process.

    • W - Welding: Inspection of weld joints for defects and quality.

    • S - Stress Relieving: Checking for stress relief after welding to prevent cracking.

    • A - Annealing: Heat treatment process to soften material and improve machinability.

    • M - Machining: In...

  • Answered by AI
Round 4 - HR 

(1 Question)

  • Q1. EXP and Project details salary in Previous company

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready ur self

Intertek Interview FAQs

How many rounds are there in Intertek Senior Inspection Engineer interview?
Intertek interview process usually has 2 rounds. The most common rounds in the Intertek interview process are Resume Shortlist and One-on-one Round.
What are the top questions asked in Intertek Senior Inspection Engineer interview?

Some of the top questions asked at the Intertek Senior Inspection Engineer interview -

  1. Types of valve and their functio...read more
  2. What is WPS ,...read more
  3. Defect of weld...read more

Tell us how to improve this page.

Intertek Senior Inspection Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Join Intertek Bringing Quality, Safety and Sustainability to life

Interview Questions from Similar Companies

Bureau Veritas Interview Questions
3.9
 • 112 Interviews
SGS Interview Questions
3.9
 • 91 Interviews
TÜV NORD Interview Questions
3.8
 • 62 Interviews
TÜV SÜD Interview Questions
3.9
 • 60 Interviews
CMS Infosystems Interview Questions
3.6
 • 52 Interviews
Cashify Interview Questions
3.8
 • 39 Interviews
Titan Eye Plus Interview Questions
4.3
 • 30 Interviews
View all
Intertek Senior Inspection Engineer Salary
based on 18 salaries
₹4.2 L/yr - ₹16.8 L/yr
18% more than the average Senior Inspection Engineer Salary in India
View more details

Intertek Senior Inspection Engineer Reviews and Ratings

based on 3 reviews

2.8/5

Rating in categories

3.0

Skill development

2.6

Work-life balance

3.0

Salary

2.6

Job security

3.0

Company culture

2.6

Promotions

3.0

Work satisfaction

Explore 3 Reviews and Ratings
Inspection Engineer
316 salaries
unlock blur

₹2.2 L/yr - ₹7.2 L/yr

Quality Engineer
165 salaries
unlock blur

₹2 L/yr - ₹7 L/yr

Lab Technician
160 salaries
unlock blur

₹1.8 L/yr - ₹4.1 L/yr

Chemist
69 salaries
unlock blur

₹2 L/yr - ₹5 L/yr

Senior Engineer
60 salaries
unlock blur

₹4 L/yr - ₹10.4 L/yr

Explore more salaries
Compare Intertek with

SGS

3.9
Compare

Bureau Veritas

3.9
Compare

TÜV NORD

3.8
Compare

DNV GL

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview