Filter interviews by
Be the first one to contribute and help others!
posted on 10 May 2018
I applied via Company Website and was interviewed in Jan 2018. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Jul 2021. There were 3 interview rounds.
Quantitative Aptitude, Numerical Ability, Synonym etc
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Compilation process involves several steps to convert source code into executable code.
Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.
Compilation: Translates source code into assembly code.
Assembly: Converts assembly code into machine code.
Linking: Combines object files and libraries to create an executable file.
Loading: Loads the executable file into memory and prepares it
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
Quant , Logical REASONING , Java
I applied via Naukri.com and was interviewed in Apr 2021. There was 1 interview round.
posted on 31 Aug 2021
I applied via Campus Placement and was interviewed in Jul 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 4 interview rounds.
based on 6 reviews
Rating in categories
Design Engineer
5
salaries
| ₹2.8 L/yr - ₹6 L/yr |
Senior Design Engineer
4
salaries
| ₹5 L/yr - ₹5.4 L/yr |
Mechanical Engg. Design
3
salaries
| ₹1.7 L/yr - ₹5 L/yr |
Electrical Engineer
3
salaries
| ₹6 L/yr - ₹8.4 L/yr |
Assistant Design Engineer
3
salaries
| ₹2.2 L/yr - ₹3.5 L/yr |
John Deere
KONE
Caterpillar Inc
Sigma Electric Manufacturing Corporation