  • Q1. Working principle of transformer ?
  • Ans. 

    Transformers work on the principle of electromagnetic induction to transfer electrical energy from one circuit to another.

    • Transformers have two coils of wire, a primary coil and a secondary coil, wrapped around a magnetic core.

    • When an alternating current flows through the primary coil, it creates a magnetic field that induces a voltage in the secondary coil.

    • The voltage induced in the secondary coil is proportional to t...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. What is torque? And industrial engineering use.
  • Ans. 

    Torque is a measure of rotational force that causes an object to rotate around an axis.

    • Torque is measured in units of force multiplied by distance, such as newton-meters or pound-feet.

    • It is used in industrial engineering to determine the amount of force needed to rotate a machine part or to tighten a bolt.

    • Torque is also important in designing and testing engines and other mechanical systems.

    • Examples of torque applicati...

  • Answered by AI
Round 3 - Group Discussion 

Bio data , and work experience details.

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be prepare for getting job opportunities.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Civil engineering responsibility timely site work .
Round 3 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Site relative question
Round 4 - Technical 

(2 Questions)

  • Q1. Site Execution qution
  • Q2. Highway Road Project qution

Interview Preparation Tips

Interview preparation tips for other job seekers - Bridges ,Highway Road Project and Railway Project flyovers

I applied via Company Website and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Proove you are eligible for achive targate and focused to job.

Interview Preparation Tips

Interview preparation tips for other job seekers - Dedicated person take own responsibility and empowered to sign checks on his behalf and his embition was to become a model.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I was interviewed before Mar 2022.

Round 1 - Technical 

(1 Question)

  • Q1. Regarding profile related experience
Round 2 - One-on-one 

(1 Question)

  • Q1. Technical questions and other field

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice journey good feeling one to one every round clear and healthy atmosphere
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Prepare for aptitude

Round 3 - Technical 

(2 Questions)

  • Q1. Process improvement, HAZOP, SIL
  • Q2. ERP, DCS operation
Round 4 - HR 

(1 Question)

  • Q1. Compensation and benefits

Interview Preparation Tips

Interview preparation tips for other job seekers - Your initial compensation should be good enough
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic Question about your current work and technical question of what they want in me
Round 2 - Technical 

(1 Question)

  • Q1. Case study like what action you take in this particular problem
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and document sharing

I applied via Company Website and was interviewed before Apr 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Conduct technical interview and aptitude test

Interview Preparation Tips

Interview preparation tips for other job seekers - Sinciarity, calm, faithfully, honestly to doing in sastainbility in your profession.

I applied via Campus Placement and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Question asked were more on resume i.e. projects and internships. Some technicals were also asked.

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain your answer throughly.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Aug 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About salary and experience
Round 3 - Technical 

(4 Questions)

  • Q1. Chiller trouble shooting
  • Q2. Work of cchiller
  • Ans. 

    A chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.

    • Chillers are commonly used in air conditioning systems to cool buildings or industrial processes.

    • They work by transferring heat from the liquid being chilled to a separate fluid, which is then circulated through a heat exchanger to cool it down.

    • Chillers can be water-cooled or air-cooled, depending on the app

  • Answered by AI
  • Q3. Alarm and solutions
  • Q4. Controlling andetc
Round 4 - Group Discussion 

Salary and job responsibilities

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Project discussion

Infrastructure Leasing & Financial Services Interview FAQs

How many rounds are there in Infrastructure Leasing & Financial Services Project Engineer Incharge interview?
Infrastructure Leasing & Financial Services interview process usually has 3 rounds. The most common rounds in the Infrastructure Leasing & Financial Services interview process are Technical and Group Discussion.
What are the top questions asked in Infrastructure Leasing & Financial Services Project Engineer Incharge interview?

Some of the top questions asked at the Infrastructure Leasing & Financial Services Project Engineer Incharge interview -

  1. What is torque? And industrial engineering u...read more
  2. Working principle of transforme...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

IDFC FIRST Bank Interview Questions
3.9
 • 642 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
Tractebel Interview Questions
4.1
 • 42 Interviews
View all
Assistant Manager
29 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
20 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Computer Instructor
18 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
14 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

School Coordinator
12 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Infrastructure Leasing & Financial Services with

Power Finance Corporation

4.1
Compare

Rural Electrification Corporation

3.9
Compare

IDFC FIRST Bank

3.9
Compare

IL&FS Transportation Networks

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview