Civil engineering is a based on many civil work knowledge like highway engineering, building works, transportations engineering,etc
What is s cement Types Manufacturing process Physics components Chemical components Test etc
What are you do for growth your products.how to build relations with coustomers Chanel partners etc
Questions were tough in aptitude test
posted on 19 Mar 2024
I applied via Job Fair and was interviewed in Sep 2023. There were 2 interview rounds.
posted on 16 Aug 2023
I applied via Referral and was interviewed in Jul 2023. There were 3 interview rounds.
posted on 20 Aug 2023
I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.
OPC cement is Ordinary Portland Cement, while PPC cement is Portland Pozzolana Cement. The main difference lies in the materials used and their properties.
OPC cement is made by grinding clinker with gypsum, while PPC cement is made by intergrinding clinker, fly ash, and gypsum.
PPC cement has higher long-term strength and durability compared to OPC cement.
PPC cement is more environmentally friendly as it uses industrial...
Tests of cement are used to ensure its quality and strength for construction purposes.
Setting time test: Determines how long it takes for the cement to set.
Compressive strength test: Measures the maximum load the cement can bear before failure.
Soundness test: Checks for the presence of uncombined lime in the cement.
Fineness test: Determines the particle size of the cement.
Consistency test: Measures the amount of water ...
Cement is made by heating limestone with clay in a kiln, then grinding the mixture into a fine powder.
Limestone and clay are crushed and mixed in proper proportions
The mixture is then heated in a kiln at high temperatures
After heating, the material is cooled and ground into a fine powder
The powder is then mixed with gypsum to regulate setting time
The final product is cement, which is used in construction
I applied via Referral and was interviewed in Jun 2023. There were 3 interview rounds.
Slump test is done to measure the workability of concrete. The mould is removed after 15-30 minutes.
Slump test is done to determine the consistency and workability of fresh concrete.
The mould is typically removed after 15-30 minutes of the test being conducted.
The test helps in ensuring that the concrete mix has the desired properties for construction.
I applied via Walk-in and was interviewed in Feb 2023. There were 3 interview rounds.
based on 3 interviews
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
126
salaries
| ₹4 L/yr - ₹10 L/yr |
Business Development Manager
107
salaries
| ₹4.2 L/yr - ₹15.1 L/yr |
Sales Executive
76
salaries
| ₹2.5 L/yr - ₹5.8 L/yr |
Executive Accountant
73
salaries
| ₹2.4 L/yr - ₹5.5 L/yr |
Senior Sales Executive
60
salaries
| ₹3.5 L/yr - ₹7.5 L/yr |
Tata Steel
UltraTech Cement
Larsen & Toubro Limited
ACC