OTDR stands for Optical Time Domain Reflectometer. It is a device used to measure the characteristics of an optical fiber.
OTDR is commonly used in the telecommunications industry to troubleshoot and maintain fiber optic networks.
It sends a series of light pulses into the fiber and measures the time and intensity of the reflections to determine the length, loss, and quality of the fiber.
OTDR can locate faults, such as b...
LSPM stands for Local Service Provider Management.
LSPM is a system or process used to manage and coordinate local service providers.
It involves selecting, contracting, and overseeing the performance of local service providers.
LSPM ensures that local service providers meet the required standards and deliver quality services.
Examples of local service providers include contractors, vendors, and suppliers.
LSPM helps in opt...
Soil types can vary greatly and are classified based on their composition, texture, and fertility.
Soil types include clay, silt, sand, loam, and peat.
Clay soil is heavy and retains water, while sandy soil is loose and drains quickly.
Loam soil is a balanced mixture of clay, silt, and sand, ideal for plant growth.
Soil fertility is determined by its nutrient content and organic matter.
Different soil types require differen...
posted on 19 Mar 2022
I was interviewed in Feb 2022.
I applied via Campus Placement and was interviewed in Jul 2022. There were 3 interview rounds.
Question related to electronics.
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
To determine the location of a broken fiber, I would use an OTDR and then fix it by splicing or replacing the damaged section.
Use an Optical Time Domain Reflectometer (OTDR) to analyze the fiber and locate the break.
Once the break is identified, the damaged section can be spliced back together or replaced.
Splicing involves fusing the two ends of the fiber together using a fusion splicer.
If the break is severe or in an ...
I applied via Recruitment Consulltant and was interviewed in Jul 2022. There was 1 interview round.
I applied via Campus Placement and was interviewed before Aug 2019. There were 6 interview rounds.
based on 2 interviews
Interview experience
based on 4 reviews
Rating in categories
Assistant Manager
332
salaries
| ₹0 L/yr - ₹0 L/yr |
MIS Executive
324
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
235
salaries
| ₹0 L/yr - ₹0 L/yr |
Field Support Engineer
222
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Executive
197
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharti Infratel
American Tower Corporation
GTL Infrastructure
TowerVision India