Filter interviews by
Codes of steel fabrication are standards and guidelines that ensure quality and safety in the manufacturing process.
Codes specify the minimum requirements for materials, design, fabrication, and inspection.
Examples of codes include AWS D1.1 for structural welding, ASME Section VIII for pressure vessels, and API 650 for storage tanks.
Adherence to codes is important for ensuring the safety and reliability of steel struct...
The weight of a steel plate can be calculated using its dimensions and density.
Measure the length, width, and thickness of the steel plate in meters
Multiply the length, width, and thickness to get the volume in cubic meters
Multiply the volume by the density of steel (7850 kg/m³) to get the weight in kilograms
Top trending discussions
posted on 21 Feb 2022
I applied via Referral
The procedure of export and import in China as a country and manufacturer/exporter, and the challenge of finding accommodation in a different town.
Export and import procedures in China involve documentation, customs clearance, and transportation logistics.
As a manufacturer and exporter, understanding regulations, tariffs, and trade agreements is crucial.
Finding accommodation in a different town can be challenging, requ...
posted on 16 Sep 2022
I applied via Company Website and was interviewed in Nov 2021. There were 3 interview rounds.
posted on 24 Aug 2023
I applied via Recruitment Consulltant and was interviewed in Jul 2023. There were 3 interview rounds.
There are typically 18 documents in a PPAP submission.
PPAP (Production Part Approval Process) typically consists of 18 documents.
These documents include items such as control plans, FMEA, dimensional results, and more.
Each document serves a specific purpose in demonstrating the supplier's ability to meet customer requirements.
PPAP documents are crucial in the automotive industry and other manufacturing sectors.
Notice period is the amount of time an employee must give before leaving a job.
Notice period is typically stated in the employment contract.
It allows the employer to find a replacement for the departing employee.
Notice periods can vary depending on the company and position.
Some companies may require a longer notice period for higher-level positions.
Employees may be required to work during their notice period or be paid
I applied via Approached by Company and was interviewed in Jan 2022. There were 5 interview rounds.
Qualification
I applied via Approached by Company and was interviewed in Jul 2023. There were 3 interview rounds.
I will create a dashboard using company data to visualize key metrics and trends.
Gather relevant company data such as sales, expenses, customer feedback, etc.
Choose appropriate visualization tools like charts, graphs, and tables.
Include key performance indicators (KPIs) to track progress and goals.
Ensure the dashboard is user-friendly and interactive for easy analysis.
Regularly update the dashboard to reflect real-time
I applied via Naukri.com and was interviewed in Mar 2023. There were 3 interview rounds.
posted on 18 Feb 2025
I appeared for an interview before Feb 2024.
Line balancing efficiency is the process of optimizing production lines to ensure smooth workflow and minimize bottlenecks.
Line balancing involves assigning tasks to workstations in a way that minimizes idle time and maximizes efficiency.
It helps in reducing production costs, improving productivity, and meeting customer demand effectively.
Example: In a manufacturing plant, line balancing can involve rearranging tasks s...
posted on 9 Apr 2022
I applied via Referral and was interviewed in Mar 2022. There were 3 interview rounds.
Production Engineer
22
salaries
| ₹2.4 L/yr - ₹7.2 L/yr |
Estimation Engineer
15
salaries
| ₹3 L/yr - ₹5 L/yr |
Production & Planning Engineer
8
salaries
| ₹3.6 L/yr - ₹5.5 L/yr |
Quality Engineer
8
salaries
| ₹2.5 L/yr - ₹4.6 L/yr |
Planning Engineer
7
salaries
| ₹3.5 L/yr - ₹5.2 L/yr |
Tata International
C. L. GUPTA EXPORTS
DESIGNCO
Kh Exports