i
Hyundai Motor India Limited
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via AmbitionBox and was interviewed before Jun 2021. There were 2 interview rounds.
My shop floor work involves ensuring quality control and adherence to production standards.
Conducting quality inspections on products
Monitoring production processes to identify any issues
Implementing corrective actions to improve quality
Collaborating with production team to address quality concerns
My quality inspection in the OK line involves checking products for defects and ensuring they meet quality standards before they are approved for shipment.
Inspecting products for defects such as scratches, dents, or misalignments
Checking measurements and specifications to ensure they meet quality standards
Verifying proper labeling and packaging of products
Documenting any issues found and reporting them to the appropria...
Assembly conveyor length refers to the total length of the conveyor system used in the assembly process.
Assembly conveyor length is the distance from the beginning to the end of the conveyor system.
It is important to consider the length of the conveyor when designing an assembly line.
The length of the conveyor can impact the efficiency and productivity of the assembly process.
For example, a longer conveyor may be neede
I applied via Walk-in and was interviewed in Jan 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Sep 2021. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed before Dec 2019. There was 1 interview round.
5S is a methodology used to organize and maintain a clean, efficient, and safe work environment.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order focuses on arranging necessary items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize establishes consistent processes and procedures.
Su...
Pokayoke is a Japanese term for mistake-proofing or error-proofing.
It is a quality control technique used to prevent errors or defects in a product or process.
It involves designing a process or product in a way that makes it impossible or difficult to make mistakes.
Examples include using color-coding, checklists, and sensors to prevent errors.
Pokayoke helps improve product quality, reduce waste, and increase efficiency
Kaizen is a Japanese term for continuous improvement.
Kaizen involves making small, incremental changes to improve processes and systems.
It is a philosophy that emphasizes the importance of ongoing improvement in all aspects of an organization.
Kaizen can be applied to any area of an organization, from manufacturing to customer service.
Examples of kaizen include implementing a new process to reduce waste, improving commu...
I applied via Recruitment Consultant and was interviewed in Jan 2018. There were 6 interview rounds.
posted on 16 May 2020
I applied via Walk-in and was interviewed before May 2019. There was 1 interview round.
The 5 engine part names are piston, cylinder, crankshaft, camshaft, and valve.
Piston: Moves up and down inside the cylinder to compress the fuel-air mixture.
Cylinder: Houses the piston and allows for the combustion process.
Crankshaft: Converts the linear motion of the piston into rotational motion.
Camshaft: Controls the opening and closing of the engine's valves.
Valve: Regulates the flow of fuel-air mixture and exhaust
1st and 3rd angle methods are used in engineering drawings to represent the orientation of an object in 3D space.
1st angle method is commonly used in Europe and Asia, while 3rd angle method is used in North America.
In 1st angle method, the object is placed in the first quadrant of the viewing plane, while in 3rd angle method, it is placed in the third quadrant.
The symbol for 1st angle projection is a square with a dot ...
posted on 19 Nov 2020
I applied via Walk-in and was interviewed before Nov 2019. There was 1 interview round.
posted on 17 Oct 2017
I appeared for an interview before Oct 2016.
I am passionate about ensuring quality standards are met and enjoy problem-solving in a technical environment.
Passionate about quality assurance
Enjoy problem-solving in technical environments
Excited about contributing to the success of the company
I applied via Company Website and was interviewed before Jun 2019. There was 1 interview round.
60 minutes mechanical engineering topic thermal, som, heat transfer
Ev in day today life
based on 1 review
Rating in categories
Manager
708
salaries
| ₹10 L/yr - ₹27 L/yr |
Assistant Manager
560
salaries
| ₹7 L/yr - ₹20 L/yr |
Trainee
436
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Diploma Mechanical Engineer
311
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Hyundai Diploma Trainee
255
salaries
| ₹1.5 L/yr - ₹3.5 L/yr |
Mahindra & Mahindra
Ashok Leyland
Hero MotoCorp
TVS Motor