Filter interviews by
I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.
Optional model questions . Select exact correct answer
Difficulties in civil execution include weather conditions, material availability, labor shortages, and unexpected site conditions.
Weather conditions can delay construction and affect the quality of work.
Material availability issues can lead to project delays and increased costs.
Labor shortages can result in slower progress and potential quality issues.
Unexpected site conditions such as soil instability or underground ...
I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.
I applied via Job Portal
Hubert Enviro Care Systems interview questions for popular designations
I applied via Company Website and was interviewed in Mar 2023. There were 3 interview rounds.
I appeared for an interview before Mar 2024, where I was asked the following questions.
Water treatment involves processes to improve water quality for various uses, ensuring safety and environmental protection.
Filtration: Removes particles and impurities, e.g., sand filters.
Disinfection: Kills pathogens using chlorine or UV light.
Coagulation: Aggregates small particles into larger ones for easier removal.
Reverse Osmosis: Uses a membrane to remove dissolved solids and contaminants.
Wastewater Treatment: Pr...
I applied via Naukri.com and was interviewed before Mar 2022. There were 2 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Aug 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
posted on 23 Oct 2024
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There was 1 interview round.
To arrest leakages, identify the source, implement preventive measures, monitor regularly, and take corrective actions.
Identify the source of leakages through regular audits and inspections.
Implement preventive measures such as installing leak detection systems or improving maintenance procedures.
Monitor regularly by analyzing data and conducting spot checks.
Take corrective actions promptly to fix leaks and prevent fut
Grouting methods include cementitious grouting, chemical grouting, and pressure grouting.
Cementitious grouting involves mixing cement, water, and additives to create a flowable material for filling gaps.
Chemical grouting uses chemical compounds to fill voids and stabilize soil or rock formations.
Pressure grouting injects grout under pressure to fill cracks and voids in structures.
Examples: epoxy grouting, urethane grou
Approximately 500 cubic yards of concrete were consumed in the last project.
The amount of concrete consumed in a project can vary depending on the size and scope of the project.
Factors such as the type of structure being built, the design specifications, and the location can all impact the amount of concrete needed.
For example, a small residential project may only require a few cubic yards of concrete, while a large co...
based on 12 interviews
Interview experience
based on 96 reviews
Rating in categories
Chemist
16
salaries
| ₹1.3 L/yr - ₹5.1 L/yr |
Lab Chemist
15
salaries
| ₹2.1 L/yr - ₹4 L/yr |
Project Engineer
13
salaries
| ₹2.5 L/yr - ₹5.2 L/yr |
Engineer Trainee
12
salaries
| ₹1.5 L/yr - ₹3.2 L/yr |
Electrical Engineer
10
salaries
| ₹3 L/yr - ₹4.5 L/yr |
Re Sustainability Limited
DuPont
WM Universal Solutions Private Limited
Clean Harbors