Filter interviews by
I applied via Newspaper Ad and was interviewed before Oct 2022. There were 3 interview rounds.
Electrical work fire alarm system internet wiring
The question seems to be asking about the tasks related to fixing cameras, generators, and RO service in an electrical engineering role.
RO service involves maintaining and repairing reverse osmosis systems for water purification.
Camera fixing may refer to installing, troubleshooting, or repairing surveillance cameras.
Generator work could involve installing, maintaining, or repairing power generators.
As an electrical en...
Top trending discussions
posted on 13 Nov 2023
I applied via LinkedIn and was interviewed in Oct 2023. There were 5 interview rounds.
I have a Bachelor's degree in Electrical Engineering and strong skills in circuit design, power systems, and programming.
Bachelor's degree in Electrical Engineering
Proficient in circuit design
Strong knowledge of power systems
Skilled in programming languages like C++ and Python
Testing of transformers involves various electrical tests to ensure proper functioning and safety.
One common test is the turns ratio test to verify the turns ratio of primary and secondary windings.
Another test is the insulation resistance test to check for any insulation breakdown.
Short circuit test is performed to determine the copper losses in the transformer.
Open circuit test is done to measure the core losses in t...
posted on 13 Nov 2023
I applied via LinkedIn and was interviewed in Oct 2023. There were 5 interview rounds.
I have a Bachelor's degree in Electrical Engineering and strong skills in circuit design, power systems, and programming.
Bachelor's degree in Electrical Engineering
Proficient in circuit design
Strong knowledge of power systems
Skilled in programming languages like C++ and Python
Testing of transformers involves various electrical tests to ensure proper functioning and safety.
One common test is the turns ratio test to verify the turns ratio of primary and secondary windings.
Another test is the insulation resistance test to check for any insulation breakdown.
Short circuit test is performed to determine the copper losses in the transformer.
Open circuit test is done to measure the core losses in t...
I applied via Referral and was interviewed in Aug 2021. There was 1 interview round.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
American Express
Taj Hotels Resorts and Palaces
Mahindra Holidays & Resorts
Radisson Hotels