Upload Button Icon Add office photos

Filter interviews by

HM Constructions Cctv Technician Interview Questions and Answers

Updated 25 Jun 2024

HM Constructions Cctv Technician Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. How many type of cctv cameras are in market.
  • Ans. 

    There are several types of CCTV cameras available in the market, including dome cameras, bullet cameras, PTZ cameras, and more.

    • Dome cameras: These are typically used for indoor surveillance and have a dome-shaped design to blend in with the surroundings.

    • Bullet cameras: These are long and cylindrical in shape, ideal for outdoor use due to their weatherproof design.

    • PTZ cameras: Pan-tilt-zoom cameras can be remotely contr...

  • Answered by AI
  • Q2. How you set up DVR or NVR
  • Ans. 

    To set up a DVR or NVR, you need to connect cameras, configure settings, set up recording schedules, and ensure remote access.

    • Connect cameras to the DVR/NVR using appropriate cables

    • Access the settings menu on the DVR/NVR to configure recording resolution, motion detection, and other preferences

    • Set up recording schedules to specify when and for how long the cameras should record

    • Ensure remote access by setting up network...

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. Previous company name
  • Q2. What is your salary expectation

Interview Preparation Tips

Interview preparation tips for other job seekers - whos looking for salary after 5th can try

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I appeared for an interview before Apr 2024, where I was asked the following questions.

  • Q1. Difference between delete, drop, truncate
  • Ans. 

    Delete, drop, and truncate are SQL commands for removing data, but they differ in scope and behavior.

    • DELETE: Removes specific rows based on a condition. Example: DELETE FROM users WHERE age < 18;

    • DROP: Removes entire tables or databases. Example: DROP TABLE users;

    • TRUNCATE: Removes all rows from a table but keeps the structure. Example: TRUNCATE TABLE users;

  • Answered by AI
  • Q2. Queries on joins
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Experience, previous salary, previous co. Name, total Experience letter, salary slip and discuss for location
Round 2 - Case Study 

Kis co. Me kya kya kaam kiya

I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. As attendance for “Mid Management level designation “ Just asks about my Experience. Not much Technical points highlighted except few Manager level Questions (general points not much technically projected)...

Interview Preparation Tips

Topics to prepare for VIKRAN Engineering & Exim Assistant Manager interview:
  • Nothing required.
Interview preparation tips for other job seekers - Just expecting less salary and having Good experience in the relevant field you can have JOB CONFIRMED easily.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before May 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Technical about railway experience in OHE
  • Q2. Commerical experience related to client billing
  • Ans. 

    I have extensive commercial experience related to client billing.

    • Managed client billing for a software company, ensuring timely and accurate invoicing

    • Developed and implemented billing processes for a consulting firm, resulting in a 20% increase in revenue

    • Collaborated with sales team to resolve billing discrepancies and improve client satisfaction

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Small organisation but growing in a steady path
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Explain your work profile.
Round 3 - Technical 

(1 Question)

  • Q1. Second round with plant head.
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. What do you know about our company

Interview Preparation Tips

Interview preparation tips for other job seekers - they will ask about some finance knowledge and the rest is just a normal interview question
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Salary expectation
  • Q2. My previous roles

Interview Preparation Tips

Topics to prepare for ABCI Infrastructures Analyst interview:
  • Analytics
Interview preparation tips for other job seekers - Read reviews of the company and then only join
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Tell me about yourself
  • Ans. 

    I am a passionate software developer with experience in building web applications using various technologies.

    • Experienced in developing web applications using HTML, CSS, JavaScript, and frameworks like React and Angular

    • Proficient in backend development with Node.js and databases like MongoDB and MySQL

    • Familiar with version control systems like Git and project management tools like Jira

    • Strong problem-solving skills and ab...

  • Answered by AI
  • Q2. Tell me about your projects
  • Ans. 

    I have worked on various projects including a web application for a retail company and a mobile app for a fitness tracker.

    • Developed a web application for a retail company to manage inventory and sales

    • Created a mobile app for a fitness tracker to track workouts and calories burned

    • Implemented a chatbot for customer support in a banking application

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. Case study regarding water base plant

Interview Preparation Tips

Interview preparation tips for other job seekers - Go thoroughly in the case study part. They will check how your brain work

HM Constructions Interview FAQs

How many rounds are there in HM Constructions Cctv Technician interview?
HM Constructions interview process usually has 2 rounds. The most common rounds in the HM Constructions interview process are One-on-one Round and Technical.
How to prepare for HM Constructions Cctv Technician interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at HM Constructions. The most common topics and skills that interviewers at HM Constructions expect are CCTV System, Maintenance and Technician Activities.
What are the top questions asked in HM Constructions Cctv Technician interview?

Some of the top questions asked at the HM Constructions Cctv Technician interview -

  1. how many type of cctv cameras are in mark...read more
  2. how you set up DVR or ...read more

Tell us how to improve this page.

HM Constructions Cctv Technician Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

HM Constructions Cctv Technician Reviews and Ratings

based on 2 reviews

1.8/5

Rating in categories

2.2

Skill development

2.2

Work-life balance

1.4

Salary

2.2

Job security

1.0

Company culture

1.4

Promotions

1.8

Work satisfaction

Explore 2 Reviews and Ratings
Civil Site Engineer
8 salaries
unlock blur

₹1.8 L/yr - ₹4.8 L/yr

Executive Accountant
5 salaries
unlock blur

₹1.8 L/yr - ₹2.7 L/yr

HR Executive
4 salaries
unlock blur

₹2.9 L/yr - ₹11.5 L/yr

Site Engineer
4 salaries
unlock blur

₹2.2 L/yr - ₹3.2 L/yr

HR Payroll Executive
4 salaries
unlock blur

₹2.4 L/yr - ₹4.2 L/yr

Explore more salaries
Compare HM Constructions with

McNally Bharat Engineering

4.0
Compare

ABCI Infrastructures

3.4
Compare

Military Engineer Services

4.4
Compare

VIKRAN Engineering & Exim

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview