I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.
Lean manufacturing systems aim to reduce waste and improve efficiency in the production process.
Lean manufacturing focuses on eliminating waste and non-value-added activities.
It involves streamlining processes to reduce inventory, waiting time, defects, and overproduction.
Examples of waste reduction techniques include implementing just-in-time production, 5S methodology, and continuous improvement.
Lean manufacturing ca...
Punctuality is crucial for the smooth functioning of any company.
Punctuality sets the tone for the work culture of the company.
It ensures that deadlines are met and work is completed on time.
It shows respect for colleagues' time and helps build trust and reliability.
Lack of punctuality can lead to delays, missed opportunities, and a negative impact on the company's reputation.
Setting clear expectations and consequences
Top trending discussions
posted on 3 Jul 2024
posted on 1 Nov 2023
I applied via Referral and was interviewed before Nov 2022. There was 1 interview round.
Switch analysis involves evaluating the performance and efficiency of different switches in a production setting.
Switch analysis helps in determining the best switch for specific production needs
Factors considered in switch analysis include speed, durability, cost, and compatibility
Examples of switches analyzed include Ethernet switches, network switches, and industrial switches
posted on 8 Dec 2021
I applied via Walk-in and was interviewed before Dec 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed in Oct 2019. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in May 2019. There were 3 interview rounds.
Clean rooms are classified based on the number of particles per cubic meter of air.
Class 1: <1 particle of size 0.5 microns or larger per cubic foot of air
Class 10: <10 particles of size 0.5 microns or larger per cubic foot of air
Class 100: <100 particles of size 0.5 microns or larger per cubic foot of air
Class 1000: <1000 particles of size 0.5 microns or larger per cubic foot of air
Class 10000: <10000 particles of siz
Assistant Engineer
65
salaries
| ₹3 L/yr - ₹5.2 L/yr |
Production Engineer
55
salaries
| ₹3.5 L/yr - ₹7.5 L/yr |
Junior Engineer
33
salaries
| ₹2.5 L/yr - ₹4.6 L/yr |
Deputy Engineer
31
salaries
| ₹3.6 L/yr - ₹5.7 L/yr |
Production Supervisor
26
salaries
| ₹2.1 L/yr - ₹3.8 L/yr |
Becton Dickinson
Nipro India Corporation
Baxter International
Terumo Penpol