Filter interviews by
I applied via Campus Placement and was interviewed in Apr 2023. There were 3 interview rounds.
10 general questions
Top trending discussions
posted on 21 Dec 2024
I applied via Approached by Company and was interviewed in Nov 2024. There were 2 interview rounds.
The question is asking for the difference between basic method and specification method in production.
Basic method refers to a general approach or technique used in production without specific details.
Specification method involves detailed instructions or requirements for a specific task or product.
Example: Basic method for assembling a product may involve general steps, while specification method would include exact m
Organization method refers to the system or structure used to arrange and manage tasks, resources, and information in a production setting.
Utilize a clear and efficient system for task delegation and tracking
Implement visual management tools such as Kanban boards or Gantt charts
Establish regular communication channels for updates and feedback
Ensure proper documentation and record-keeping for processes and procedures
Enc...
Safety working method involves implementing procedures and protocols to ensure the well-being of employees.
Implementing regular safety training for employees
Enforcing the use of personal protective equipment (PPE)
Conducting regular safety inspections and audits
Encouraging employees to report any safety concerns or hazards
Establishing emergency response plans and procedures
Quality method refers to the approach or system used to ensure products meet standards. Type of work method refers to the specific process or technique used to complete tasks.
Quality method can include Six Sigma, Total Quality Management, Lean Manufacturing, etc.
Type of work method can include Agile, Waterfall, Kanban, etc.
Quality method focuses on ensuring products meet quality standards and customer requirements.
Type...
Problem solving method involves identifying the issue, analyzing possible solutions, implementing the best solution, and evaluating the outcome.
Identify the problem or issue at hand
Gather relevant information and data
Brainstorm possible solutions
Evaluate each solution based on feasibility and impact
Implement the best solution
Monitor and evaluate the outcome for effectiveness
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 3 interview rounds.
I have 5 years of experience in production engineering.
I have worked in the production engineering field for 5 years.
My experience includes optimizing production processes and improving efficiency.
I have successfully implemented cost-saving measures in previous roles.
I have a strong understanding of manufacturing principles and technologies.
I have experience working with cross-functional teams to achieve production goa
Manpower can be effectively handled by proper planning, communication, training, and motivation.
Develop a clear organizational structure and job roles
Communicate effectively with the team to ensure understanding of goals and expectations
Provide necessary training and resources for skill development
Motivate and reward employees for their hard work and achievements
Regularly evaluate performance and provide feedback for i
Salary expectations are based on industry standards, experience, and location.
Research industry standards for Production Engineers in your area
Consider your level of experience and skills
Factor in the cost of living in the location of the job
Be prepared to negotiate based on benefits and perks offered
Provide a range rather than a specific number
posted on 25 Jun 2024
To handle a difficult permanent operator, establish clear expectations, communicate effectively, address issues promptly, provide support and training, and seek to understand their perspective.
Establish clear expectations for performance and behavior.
Communicate effectively and regularly to address any concerns or issues.
Address problems promptly and professionally to prevent escalation.
Provide support, training, and r...
DWM activities refer to Daily Work Management activities, which involve planning, organizing, and monitoring daily tasks to ensure efficiency and productivity.
Creating daily work schedules for production team members
Assigning tasks and responsibilities to team members
Monitoring progress and addressing any issues that arise
Implementing improvements to streamline processes
Ensuring adherence to safety protocols and qualit
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.
It involves setting up autonomous maintenance teams to perform routine tasks and inspections.
TPM also includes planned maintenance, quality maintenance, and focused improvement activities.
The goa...
OEE stands for Overall Equipment Effectiveness, a measure of how well a manufacturing process is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality percentages.
Availability measures the percentage of time the equipment is available for production.
Performance measures the speed at which the equipment runs compared to its maximum speed.
Quality measures the percentage of good parts produced c...
I was interviewed in Aug 2024.
English, maths and puzzles basic preparation.
Question
Add four work before work,guard to make meaningful word
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 2 interview rounds.
I was interviewed in Aug 2023.
My KPI as a Production Engineer is to ensure efficient production processes, minimize downtime, and optimize product quality.
Monitoring and improving production efficiency
Reducing downtime through preventive maintenance
Implementing quality control measures
Optimizing production output
Analyzing and improving production costs
OEE (Overall Equipment Efficiency) can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing the total operating time by the planned production time.
Calculate Performance by dividing the actual production rate by the maximum production rate.
Calculate Quality by dividing the good units produced by the total units produced.
Multiply the Availability, Performance
4M is a methodology used in production engineering. Retroactive refers to actions taken after an event, while prospective refers to actions taken before an event.
4M is a methodology used in production engineering that stands for Man, Machine, Material, and Method.
Man refers to the human resources involved in the production process.
Machine refers to the equipment and tools used in production.
Material refers to the raw m...
The base documents of a control plan include process flow diagrams, work instructions, and quality standards.
Process flow diagrams outline the sequence of steps in the production process.
Work instructions provide detailed instructions on how to perform each step of the process.
Quality standards define the criteria for acceptable quality and specify the required inspections and tests.
Other base documents may include con...
5W 1H is a technique used to gather information by asking five 'W' questions and one 'H' question.
5W 1H stands for Who, What, When, Where, Why, and How.
It is commonly used in journalism, problem-solving, and project management.
By asking these questions, one can gather comprehensive information about a situation or problem.
For example, in a production engineering context, the 5W 1H questions could be: Who is responsible...
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.
posted on 3 Apr 2024
posted on 21 Mar 2024
I applied via Approached by Company and was interviewed in Sep 2023. There were 2 interview rounds.
Interview experience
Junior Engineer
72
salaries
| ₹1.5 L/yr - ₹3.3 L/yr |
Engineer
19
salaries
| ₹2.3 L/yr - ₹4.5 L/yr |
Senior Engineer
10
salaries
| ₹2.2 L/yr - ₹7.2 L/yr |
Junior Mechanical Engineer
10
salaries
| ₹1.6 L/yr - ₹3 L/yr |
Team Lead
9
salaries
| ₹4 L/yr - ₹4.8 L/yr |
Lancer Fab Tech
Ashna Enterprise
Mold-Tek Technologies
Tooltech Global Engineering