Highway Industries
Trend Micro Interview Questions and Answers
Q1. How to control breakdowns and hidden losses
Breakdowns and hidden losses can be controlled through proper maintenance and monitoring of equipment and processes.
Regular maintenance and inspections can identify potential issues before they become breakdowns.
Implementing a preventive maintenance program can reduce the frequency of breakdowns.
Training employees on proper use and care of equipment can prevent damage and breakdowns.
Monitoring production processes can identify hidden losses, such as inefficiencies or waste.
An...read more
Q2. How to control rejection?
Rejection can be controlled by identifying the root cause and implementing corrective actions.
Identify the root cause of rejection through analysis of rejection data.
Implement corrective actions to address the root cause.
Train employees on proper procedures and quality standards.
Regularly monitor rejection rates and take necessary actions to improve.
Collaborate with suppliers to improve quality of incoming materials.
Implement quality control checks at various stages of produc...read more
Q3. How to handle the Manpower
Manpower can be handled by effective communication, training, motivation, and delegation of tasks.
Establish clear communication channels to ensure everyone is aware of their roles and responsibilities
Provide adequate training to ensure employees have the necessary skills to perform their tasks
Motivate employees through recognition, rewards, and a positive work environment
Delegate tasks based on individual strengths and abilities to maximize productivity
Regularly evaluate perf...read more
Q4. How increase the production
To increase production, optimize processes, improve efficiency, and invest in technology.
Analyze current production processes and identify areas for improvement
Implement lean manufacturing principles to reduce waste and increase efficiency
Invest in new technology and equipment to automate processes and increase output
Train and develop employees to improve skills and knowledge
Implement a performance management system to track progress and identify areas for improvement
Q5. How ti save the cost.
Cost can be saved by optimizing processes, reducing waste, and negotiating better prices.
Optimize production processes to reduce time and labor costs
Reduce waste by implementing lean manufacturing principles
Negotiate better prices with suppliers
Implement cost-saving measures such as energy-efficient equipment
Outsource non-core activities to reduce overhead costs
Q6. Moth civil engineering Highway experience
I have extensive experience in civil engineering with a focus on highway projects.
Managed multiple highway construction projects from start to finish
Collaborated with government agencies and contractors to ensure project success
Implemented innovative solutions to overcome challenges in highway design and construction
Ensured compliance with safety regulations and quality standards in all highway projects
Q7. How defect generation , What is scada , What is autonomous Maintenance, How productivity can be improved
Defect generation, SCADA, autonomous maintenance, and productivity improvement are key topics in the interview for Senior Engineer.
Defect generation refers to the process of identifying and categorizing defects in a product or system.
SCADA stands for Supervisory Control and Data Acquisition, which is a system used to monitor and control industrial processes.
Autonomous Maintenance is a concept in Lean Manufacturing where operators take responsibility for the maintenance of the...read more
Q8. Tell me about tests done on site
Various tests are conducted on site to ensure quality and safety standards are met.
Soil testing to determine soil composition and suitability for construction
Concrete testing to check strength and durability
Compaction testing to ensure proper compaction of soil
Water testing to assess water quality for construction purposes
Material testing for quality control and compliance with specifications
Q9. What was the height if slump cone
The height of a slump cone is typically 12 inches.
The standard height of a slump cone used in construction is 12 inches.
The height of the slump cone is important for measuring the consistency of concrete mix.
The slump cone is filled with concrete, then lifted off to see how much the concrete slumps, indicating its workability.
Top HR Questions asked in Trend Micro
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month