Filter interviews by
I applied via Approached by Company and was interviewed before Dec 2023. There were 2 interview rounds.
Given questions to answer, totally 10 questions and 30 minutes time given
Industrial engineering is expected to have a significant scope in the future due to advancements in technology and increasing focus on efficiency and sustainability.
Increasing integration of technology such as AI, IoT, and automation in industrial processes
Focus on sustainability and green practices leading to the development of eco-friendly manufacturing processes
Growing demand for optimization of supply chain managem...
OEE is important as it measures the overall efficiency of a manufacturing process by taking into account availability, performance, and quality.
OEE helps identify areas of improvement in the manufacturing process by pinpointing where losses are occurring.
It provides a comprehensive view of the production process, allowing for better decision-making and resource allocation.
By tracking OEE over time, trends can be identi...
posted on 8 May 2024
I applied via Walk-in and was interviewed in Nov 2023. There were 2 interview rounds.
I appeared for an interview in Feb 2025.
I appeared for an interview in Aug 2021.
In maintenance, I am responsible for ensuring the proper functioning of equipment and machinery by performing regular inspections, repairs, and upgrades.
Performing routine inspections to identify any issues or potential problems
Repairing or replacing faulty parts to prevent breakdowns
Upgrading equipment to improve efficiency and performance
Creating maintenance schedules to ensure timely upkeep
Collaborating with other d
I appeared for an interview in Feb 2025.
I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
General aptitude test
I applied via Recruitment Consultant and was interviewed in Feb 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Mar 2021. There were 3 interview rounds.
SAP is an enterprise resource planning software used for managing business operations and customer relations.
SAP stands for Systems, Applications, and Products in Data Processing
It is used by companies to manage their business operations such as finance, sales, procurement, and inventory management
SAP also offers customer relationship management (CRM) software to manage interactions with customers
It is widely used in i...
I use various Tcodes depending on the task at hand.
For material master data maintenance, I use MM01, MM02, and MM03.
For purchase order creation and maintenance, I use ME21N and ME22N.
For inventory management, I use MIGO and MB51.
For production planning, I use MD61 and MD04.
For quality management, I use QA32 and QE51.
For sales and distribution, I use VA01, VA02, and VA03.
To punch production in SAP, follow these steps:
Create a production order in SAP
Release the production order
Confirm the production order
Perform goods receipt for the production order
Perform goods issue for the production order
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Process engineering involves designing, optimizing, and managing industrial processes to improve efficiency and productivity.
Process engineering focuses on analyzing and improving processes in various industries such as manufacturing, chemical, and pharmaceutical.
It involves identifying bottlenecks, reducing waste, and implementing process improvements to enhance productivity.
Process engineers use tools like process fl...
cp and pp are both commands in Unix-like operating systems, but they have different functionalities.
cp stands for 'copy' and is used to copy files or directories from one location to another.
pp stands for 'print and pause' and is used to print files with pagination, pausing after each page.
cp can be used to create a duplicate of a file or directory, while pp is used for printing files in a controlled manner.
Example: cp...
A control plan is a documented procedure that outlines the steps and measures taken to ensure quality and consistency in a manufacturing process.
Control plans are commonly used in industries such as automotive, aerospace, and electronics.
They include details on the process steps, key characteristics, measurement methods, and acceptable tolerances.
Control plans help identify potential risks, prevent defects, and ensure ...
SMED stands for Single Minute Exchange of Die. It is a lean manufacturing technique used to reduce the time it takes to change over a production process.
SMED is used to minimize downtime during changeovers
It focuses on separating internal and external setup tasks
The goal is to convert as many internal setup tasks to external setup tasks
By reducing setup time, production flexibility and efficiency are improved
Capex stands for capital expenditure, which refers to the funds used by a company to acquire, upgrade, or maintain physical assets.
Capex is an investment made by a company to purchase or improve long-term assets such as buildings, equipment, or technology.
It is different from operational expenses (opex) which are ongoing costs to run the business.
Capex is typically planned and budgeted for in advance.
Examples of capex ...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Junior Engineer
127
salaries
| ₹1.9 L/yr - ₹5.2 L/yr |
Engineer
95
salaries
| ₹3 L/yr - ₹6.4 L/yr |
Senior Engineer
80
salaries
| ₹4.4 L/yr - ₹10.5 L/yr |
Quality Engineer
62
salaries
| ₹2 L/yr - ₹6.1 L/yr |
Engineer Trainee
46
salaries
| ₹2 L/yr - ₹4 L/yr |
Knorr-Bremse
Victora Auto Private Limited
Sanden Vikas
India Japan Lighting