Filter interviews by
I applied via Naukri.com and was interviewed in Mar 2021. There was 1 interview round.
Top trending discussions
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
MTTR reduction can lead to an increase in MTBF, aligning with management KPI targets.
Reducing Mean Time To Repair (MTTR) can result in less downtime for equipment, leading to longer Mean Time Between Failures (MTBF).
Improving maintenance processes, training staff, and using predictive maintenance techniques can help reduce MTTR.
Increasing MTBF can indicate improved reliability and performance of equipment, meeting mana...
Implementing energy-saving projects can lead to significant cost reductions and environmental benefits.
Identify areas where energy consumption can be reduced, such as upgrading to energy-efficient equipment or implementing automation systems.
Calculate the potential savings from each project and prioritize based on cost-effectiveness.
Monitor and track the energy usage before and after implementing the projects to measur...
Yes, all areas have safety measures implemented to ensure a safe working environment for all employees.
Regular safety inspections are conducted to identify and address any potential hazards.
Safety protocols and procedures are clearly communicated to all employees.
Personal protective equipment (PPE) is provided and enforced for all necessary tasks.
Emergency response plans are in place and regularly practiced.
Safety trai...
I applied via Walk-in and was interviewed in Mar 2024. There were 2 interview rounds.
Gear boxes are mechanical devices used to increase or decrease the speed or torque of a motor.
Types of gear boxes include spur gear boxes, helical gear boxes, bevel gear boxes, worm gear boxes, and planetary gear boxes.
Spur gear boxes have straight teeth and are used for low-speed applications.
Helical gear boxes have angled teeth for smoother operation and higher speeds.
Bevel gear boxes have cone-shaped gears for chang...
I applied via Naukri.com and was interviewed in Jul 2023. There were 2 interview rounds.
I started my career as a maintenance technician and worked my way up to Maintenance Manager through dedication and hard work.
Started as a maintenance technician
Gained experience in troubleshooting and repairing equipment
Promoted to supervisor role
Managed a team of technicians
Implemented preventive maintenance programs
Achieved cost savings through efficient maintenance practices
The reporting line diagram shows the hierarchy of reporting relationships within the maintenance department.
Maintenance Technicians report to Maintenance Supervisors
Maintenance Supervisors report to the Maintenance Manager
Maintenance Manager reports to the Plant Manager
MTTR stands for Mean Time To Repair and MTBF stands for Mean Time Between Failures.
MTTR is the average time taken to repair a failed component or system.
MTBF is the average time between failures of a component or system.
MTTR is usually measured in hours or minutes, while MTBF is measured in hours.
MTTR is a key metric in maintenance management to assess the efficiency of maintenance processes.
MTBF is a key metric in rel...
I applied via AmbitionBox and was interviewed in Jul 2023. There were 2 interview rounds.
5S implementation involves organizing and maintaining a clean, efficient workplace.
Sort - remove unnecessary items from the workplace
Set in order - organize remaining items in a logical manner
Shine - clean and inspect the work area regularly
Standardize - establish guidelines for maintaining the first 3 S's
Sustain - ensure the practices are consistently followed over time
I applied via Recruitment Consulltant and was interviewed before May 2022. There were 3 interview rounds.
Seeking new challenges and opportunities for growth in a dynamic work environment.
Looking for new challenges and opportunities for growth
Interested in a more dynamic work environment
Seeking a change to further develop my skills and experience
Areas of command include maintenance planning, equipment troubleshooting, team management, budgeting, and safety compliance.
Maintenance planning
Equipment troubleshooting
Team management
Budgeting
Safety compliance
A sample why why analysis for identifying the root cause of a maintenance issue.
Start by identifying the problem or issue.
Ask 'why' to determine the underlying cause.
Continue asking 'why' for each answer to dig deeper into the root cause.
Repeat the process until the root cause is identified.
Example: Problem - Machine breakdown. Why? Lack of maintenance. Why? Insufficient resources. Why? Budget constraints.
To control breakdowns, implement preventive maintenance, train staff, use quality parts, and monitor equipment performance.
Implement a preventive maintenance program to regularly inspect and maintain equipment.
Train maintenance staff on proper maintenance procedures and troubleshooting techniques.
Use high-quality parts and materials for repairs and replacements.
Monitor equipment performance through regular inspections,...
TPM pillars are the foundational elements of Total Productive Maintenance, a system for improving equipment effectiveness.
TPM stands for Total Productive Maintenance.
TPM pillars are the key principles or areas of focus in implementing TPM.
There are typically 8 TPM pillars, including Autonomous Maintenance, Planned Maintenance, and Training & Education.
Each pillar represents a specific aspect of maintenance management a...
Kaizen is a Japanese business philosophy that focuses on continuous improvement in all aspects of an organization.
Kaizen emphasizes small, incremental changes over time rather than large, drastic changes.
It involves the participation of all employees in identifying and implementing improvements.
Kaizen aims to eliminate waste, improve efficiency, and enhance quality.
Examples of kaizen include implementing standardized w...
O.E.E stands for Overall Equipment Efficiency.
O.E.E is a measure of how effectively a manufacturing operation is utilized.
It is calculated by multiplying the availability, performance, and quality rates.
Availability rate measures the actual production time compared to the planned time.
Performance rate measures the actual production speed compared to the ideal speed.
Quality rate measures the number of good units produce...
posted on 2 Feb 2025
I was interviewed in Aug 2024.
I applied via campus placement at Meerut Institute of Engineering and Technology, Meerut and was interviewed in Feb 2024. There were 2 interview rounds.
Reasoning mathematics
There are various types of motors, welding methods, heating techniques, and power factors in engineering.
Types of motors include AC motors (induction, synchronous), DC motors (brushed, brushless), stepper motors, etc.
Types of welding include arc welding, MIG welding, TIG welding, spot welding, etc.
Types of heating methods include conduction, convection, radiation, induction heating, etc.
Power factor types include leadi...
posted on 3 Jul 2024
My areas of interest include electrical systems, mechanical systems, troubleshooting, and continuous improvement.
Electrical systems
Mechanical systems
Troubleshooting
Continuous improvement
Yes, I am open to further studies to enhance my skills and knowledge in the field of maintenance engineering.
I believe in continuous learning and staying updated with the latest technologies in maintenance engineering.
Further studies can help me specialize in a specific area within maintenance engineering, such as predictive maintenance or reliability engineering.
Advanced degrees or certifications can also open up oppo...
Quality Engineer
107
salaries
| ₹1.5 L/yr - ₹5.2 L/yr |
Engineer
87
salaries
| ₹2.5 L/yr - ₹6.2 L/yr |
Junior Engineer
70
salaries
| ₹1.4 L/yr - ₹3.3 L/yr |
Senior Engineer
66
salaries
| ₹4.1 L/yr - ₹8.4 L/yr |
Quality Inspector
55
salaries
| ₹1.3 L/yr - ₹3 L/yr |
Bharat Forge
Samvardhana Motherson Group
Sundaram Clayton
Rane (Madras)