i
Hi-Mak
Filter interviews by
Clear (1)
I applied via Campus Placement and was interviewed in Aug 2022. There were 4 interview rounds.
It was written test (mcq questions)
Top trending discussions
I applied via Company Website and was interviewed before Jul 2021. There were 2 interview rounds.
Various types of equipment are used in the piping industry for different purposes.
Pumps
Compressors
Valves
Heat exchangers
Filters
Storage tanks
Piping materials
Flanges
Gaskets
Instrumentation and control systems
The standard code of pipe refers to the set of regulations and specifications that govern the design, construction, and use of pipes in various industries.
The standard code of pipe varies depending on the industry and the type of pipe being used.
For example, in the oil and gas industry, the American Petroleum Institute (API) provides standards for pipes used in drilling and production operations.
In the construction ind...
Isometric drawing is a 3D representation of an object on a 2D surface.
It shows all three dimensions of an object in a single view.
It uses a 30-degree angle for all three axes.
It is commonly used in engineering and construction to show piping and structural details.
Isometric drawings are often created using computer-aided design (CAD) software.
They are useful for visualizing how different parts of a system fit together.
posted on 30 Oct 2023
posted on 17 Nov 2023
I applied via Approached by Company and was interviewed before Nov 2022. There were 4 interview rounds.
Logical question for clearing the round 1
Group discussion with batchmate
I applied via Naukri.com and was interviewed in May 2024. There was 1 interview round.
Day to day task
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Takt time is calculated by dividing the available production time by the customer demand.
Calculate the total available production time in a specified period (e.g. 1 day)
Determine the customer demand for the same period
Divide the total available production time by the customer demand to get the takt time
Takt Time = Total Production Time / Customer Demand
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Identify the tasks required to complete a process
Determine the cycle time for each task
Assign tasks to workstations based on cycle time and workload
Ensure that workstations are balanced to avoid bottlenecks
Regularly review and adjust the line balancing to optimize efficiency
Capacity analysis involves evaluating the ability of a system or process to handle a certain amount of workload or demand.
Identify the key components of the system or process that contribute to its capacity
Collect data on the current workload or demand placed on the system
Use mathematical models or simulations to predict how the system will perform under different levels of workload
Consider factors such as resource ava...
I applied via Company Website and was interviewed before Mar 2023. There was 1 interview round.
Level instruments are devices used to measure the level of liquids or solids in tanks or containers.
Types of level instruments include ultrasonic level sensors, radar level sensors, capacitance level sensors, and float level sensors.
Ultrasonic level sensors use sound waves to determine the level of a substance in a tank.
Radar level sensors use microwave signals to measure the level of a substance in a tank.
Capacitance ...
Permits are legal documents that allow individuals or companies to perform certain activities or projects.
Building permits are required for construction projects to ensure compliance with building codes.
Environmental permits are needed for activities that may impact the environment, such as waste disposal or emissions.
Zoning permits regulate land use and ensure that properties are used appropriately within designated z...
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
based on 1 interview
Interview experience
Project Engineer
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Electrical Design Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Software Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Tata Group
Mahindra & Mahindra
Bharat Forge
Godrej Industries Group