Add office photos
Employer?
Claim Account for FREE

HCC Infrastructure

4.3
based on 77 Reviews
Filter interviews by

10+ Hyundai Construction Equipment Interview Questions and Answers

Updated 5 Feb 2024

Q1. Worker productivity and machinaries productivity for planning

Ans.

Worker and machinery productivity are crucial for effective planning.

  • Worker productivity can be measured by the amount of work completed in a given time period.

  • Machinery productivity can be measured by the amount of output produced by the machinery in a given time period.

  • Both worker and machinery productivity should be taken into account when planning to ensure efficient use of resources.

  • For example, if workers are more productive than the machinery, it may be more cost-effec...read more

Add your answer

Q2. All construction materials watage percentages

Ans.

The wastage percentages of construction materials vary depending on the type of material and the project requirements.

  • Wastage percentages can range from 2-5% for cement and steel to 10-15% for bricks and tiles.

  • Factors that affect wastage include the skill level of workers, the quality of materials, and the complexity of the project.

  • Proper planning and management can help minimize wastage and reduce project costs.

  • Regular monitoring and reporting of wastage can help identify ar...read more

Add your answer

Q3. List of deductions in client bill

Ans.

Deductions in client bill include taxes, discounts, late fees, and service charges.

  • Taxes: Sales tax, VAT, GST, etc.

  • Discounts: Promotions, loyalty rewards, bulk discounts, etc.

  • Late fees: Charges for overdue payments.

  • Service charges: Fees for additional services provided.

Add your answer

Q4. If we select you for Post in jharkhand instead of MEP will you join

Ans.

Yes, I would be willing to join in Jharkhand instead of MEP.

  • I am open to working in different locations and adapting to new environments.

  • I believe that the skills and experience I possess are transferable and can be applied effectively in any location.

  • I am motivated by new challenges and opportunities for growth.

  • I am committed to the success of the organization and will prioritize the needs of the team and the company.

  • I am confident that I can contribute positively to the tea...read more

View 2 more answers
Discover Hyundai Construction Equipment interview dos and don'ts from real experiences

Q5. Retention and TDS in sub con bill

Ans.

Retention and TDS are important factors to consider in subcontractor billing.

  • Retention refers to the amount of money withheld by the client as a form of security against any defects or issues that may arise after the project is completed.

  • TDS (Tax Deducted at Source) is the tax deducted by the client from the subcontractor's payment and deposited with the government.

  • Both retention and TDS should be clearly mentioned in the subcontractor's bill to avoid any confusion or dispute...read more

Add your answer

Q6. What is tha water cement ratio

Ans.

Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.

  • Water cement ratio affects the strength and durability of concrete.

  • Lower water cement ratio results in stronger concrete but may be difficult to work with.

  • Typical water cement ratio ranges from 0.4 to 0.6 for normal strength concrete.

  • Excess water can lead to lower strength and durability of concrete.

View 1 answer
Are these interview questions helpful?

Q7. How much quantity 1 roller can compact in one day?

Ans.

The quantity of material a roller can compact in one day depends on various factors.

  • The type and size of the roller will affect its compaction capacity.

  • The type and condition of the material being compacted will also impact the quantity that can be compacted.

  • The speed and efficiency of the operator operating the roller can influence the daily compaction quantity.

  • Environmental factors such as weather conditions and terrain can affect the compaction rate.

  • The availability of mat...read more

View 1 answer

Q8. Rolling margin of steel

Ans.

Rolling margin of steel is the difference between the cost of producing steel and the selling price.

  • It is a measure of profitability for steel manufacturers.

  • It is calculated by subtracting the cost of production from the selling price.

  • A higher rolling margin indicates higher profitability.

  • Factors that affect rolling margin include raw material costs, energy costs, and market demand.

Add your answer
Share interview questions and help millions of jobseekers 🌟

Q9. In slump cone test what is the shape of slump

Ans.

The shape of slump in a slump cone test is typically conical.

  • The shape of slump is conical, with the top being wider than the base.

  • The height of the slump is measured to determine the workability of the concrete.

  • Different types of slumps (true slump, shear slump, collapse slump) indicate different levels of workability.

  • Example: A true slump has a smooth, symmetrical shape with a slight collapse at the center.

Add your answer

Q10. How to working inTunnel

Ans.

Working in a tunnel involves various tasks such as planning, excavation, ventilation, and safety measures.

  • Planning and designing the tunnel layout

  • Excavating the tunnel using appropriate methods and equipment

  • Ensuring proper ventilation to maintain air quality

  • Implementing safety measures to prevent accidents

  • Monitoring and maintaining the tunnel's structural integrity

  • Coordinating with other professionals involved in the project

  • Example: Using tunnel boring machines for excavation...read more

Add your answer

Q11. VOLUME OF CEMENT IN LITERS OR M^3

Ans.

The volume of cement can be calculated in liters or cubic meters.

  • The volume of cement is calculated by multiplying the area of the surface to be covered by the thickness of the cement layer.

  • The volume of cement can be calculated in liters by converting the cubic meters to liters.

  • For example, if the area to be covered is 10 square meters and the thickness of the cement layer is 0.1 meters, then the volume of cement required is 1 cubic meter or 1000 liters.

Add your answer

Q12. Specifications of IS Code

Ans.

IS Code refers to Indian Standards Code, which are specifications and guidelines for various engineering practices in India.

  • IS Code stands for Indian Standards Code.

  • It is a set of specifications and guidelines for various engineering practices in India.

  • IS Codes cover a wide range of topics such as construction materials, design criteria, testing methods, safety standards, etc.

  • These codes are developed and maintained by the Bureau of Indian Standards (BIS).

  • IS Codes are used by...read more

Add your answer

Q13. Minimum cement contains in RCC structure

Ans.

The minimum cement content in RCC structure is typically around 300 kg/m3.

  • Minimum cement content is usually specified by structural engineers based on design requirements.

  • Higher cement content may be required for structures in aggressive environments or with special design considerations.

  • The minimum cement content is important for achieving the desired strength and durability of the concrete mix.

Add your answer

Q14. What is rcc grade m25

Ans.

RCC grade M25 is a concrete mix design ratio used in construction.

  • RCC stands for Reinforced Cement Concrete.

  • M25 is the compressive strength of the concrete after 28 days of curing.

  • The mix design ratio for M25 is 1:1:2 (cement:sand:aggregate).

  • It is commonly used in the construction of buildings, bridges, and other structures.

  • M25 grade concrete is suitable for moderate exposure conditions.

Add your answer

Q15. Do you know bbs making

Ans.

Yes, I know bbs making.

  • BBS stands for Bar Bending Schedule, which is a document that provides details of reinforcement steel bars required for construction.

  • BBS making involves preparing the schedule by calculating the required length, weight, and number of bars for each structural element.

  • It is an important task for ensuring the strength and durability of the structure.

  • BBS making requires knowledge of engineering drawings, construction codes, and standards.

  • Software tools like...read more

Add your answer

Q16. Do you know estimation

Ans.

Yes, estimation is a crucial aspect of project management civil.

  • Estimation involves predicting the cost, time, and resources required for a project.

  • It is important to have accurate estimations to ensure the project stays within budget and on schedule.

  • Estimation techniques include top-down, bottom-up, and parametric estimation.

  • Factors such as project scope, complexity, and risk must be considered when making estimations.

  • Regular updates to estimations should be made throughout ...read more

Add your answer

Q17. Lapping zone of column

Ans.

Lapping zone of column is where two reinforcement bars overlap to ensure continuity of load transfer.

  • Lapping zone should be at least 50 times the diameter of the smaller bar away from the face of the support.

  • Proper lapping length is crucial for structural integrity and load distribution.

  • Lapping should be staggered in multiple layers for better strength.

  • Ensure proper cover and clear spacing around the lapping zone to prevent corrosion.

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Hyundai Construction Equipment

based on 19 interviews
Interview experience
3.5
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

3.5
 • 446 Interview Questions
4.2
 • 370 Interview Questions
3.9
 • 212 Interview Questions
4.1
 • 167 Interview Questions
3.3
 • 142 Interview Questions
View all
Top HCC Infrastructure Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
75 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter