Filter interviews by
Electric equipment for industrial areas
Electric motors
Transformers
Generators
Switchgear
Control panels
Lighting fixtures
Cables and wires
Power distribution systems
Safety purpose of work is to ensure the well-being of workers and prevent accidents.
Identifying and assessing potential hazards
Implementing safety measures and protocols
Providing proper training and equipment to workers
Regularly inspecting and maintaining equipment and facilities
Encouraging a culture of safety awareness and reporting
Conducting incident investigations and implementing corrective actions
Hzard and hirak are safety measures for electrical equipment.
Hzard refers to the Hazardous Area Classification system used to identify the level of risk associated with electrical equipment in potentially explosive environments.
Hirak refers to the Hirakawa Test Plug, a device used to test the electrical safety of equipment by simulating a fault condition.
Both measures are important for ensuring the safety of personnel ...
Top trending discussions
I applied via Campus Placement
My final year project was on developing a web-based inventory management system using Java and MySQL.
Developed using Java and MySQL
Web-based inventory management system
Implemented basic OOPs concepts
Used MVC architecture for better code organization
Included features like user authentication, product management, and order tracking
I applied via LinkedIn and was interviewed before Jun 2021. There were 2 interview rounds.
They give some topics related to present situation like in my GD in 2020 co. HR give topics related to that situation in our country like difference between offline education and online education system. and covid-19 pandemic related topics.
I applied via Naukri.com and was interviewed in Sep 2021. There were 2 interview rounds.
Types of test steps in software testing
Unit testing - testing individual units or components of the software
Integration testing - testing how different units or components work together
System testing - testing the entire system as a whole
Acceptance testing - testing if the software meets the requirements and is ready for release
Regression testing - testing to ensure that changes or updates to the software did not intro...
I applied via Walk-in and was interviewed before Nov 2021. There was 1 interview round.
Static class and static constructor in C#
Static class can only contain static members and cannot be instantiated
Static constructor is called only once when the class is first accessed
Static constructor is used to initialize static members of the class
Example: Math class in C# is a static class
Example: static constructor can be used to initialize a static variable with a value
Performance improvement in Angular app
Use lazy loading to load modules on demand
Optimize change detection strategy
Use trackBy function in ngFor loops
Minimize DOM manipulation
Use AOT compilation
Implement server-side rendering
Use web workers for heavy computations
Use caching for frequently accessed data
Answering questions about transformation and lookup types used in a project
Transformation types used in the project may include data mapping, aggregation, filtering, and sorting
Lookup is a process of searching for a specific value in a table or database
Types of lookup include exact match, range match, and fuzzy match
Questions about organization may refer to project management, team collaboration, or software developmen
TCS
Accenture
Wipro
Cognizant