i
Hamilton Housewares
Filter interviews by
I applied via Referral and was interviewed in Nov 2023. There were 4 interview rounds.
Overall shift handling activities involve coordinating production processes, monitoring equipment, troubleshooting issues, and ensuring safety protocols are followed.
Coordinating production schedules and tasks
Monitoring equipment performance and making adjustments as needed
Troubleshooting any issues that arise during the shift
Ensuring safety protocols are followed by all team members
Communicating effectively with team
Overall Equipment Effectiveness (OEE) is calculated by multiplying Availability, Performance, and Quality percentages. Rejection percentage is calculated by dividing rejected units by total units produced.
Calculate OEE by multiplying Availability (%) x Performance (%) x Quality (%)
Calculate rejection percentage by dividing rejected units by total units produced
Example: OEE = 90% Availability x 95% Performance x 98% Qua...
Top trending discussions
I applied via LinkedIn and was interviewed before Apr 2022. There were 3 interview rounds.
To manage production assembly line, one needs to focus on optimizing workflow, ensuring quality control, and maintaining equipment.
Create a detailed plan for the assembly line process
Ensure all equipment is functioning properly and maintained regularly
Implement quality control measures to catch defects early
Train and manage staff to ensure efficient workflow
Continuously monitor and analyze production data to identify a
The layout of assembly process involves arranging the workstations and equipment in a logical sequence to optimize efficiency.
Identify the sequence of operations required to assemble the product
Arrange the workstations and equipment in a logical order to minimize movement and transportation
Ensure that the layout allows for easy access to tools and materials
Consider the ergonomics of the workstations to minimize worker ...
CTQ refers to Critical to Quality while CTP refers to Critical to Process.
CTQ is a customer-focused metric that measures the quality of a product or service.
CTP is a process-focused metric that measures the critical steps in a process that affect the quality of the final product.
CTQ is used to identify customer requirements and ensure they are met.
CTP is used to identify critical process steps and ensure they are contr...
I applied via Campus Placement and was interviewed before May 2021. There were 3 interview rounds.
Aptitude/Technical test are combine and simple easy to crack.
posted on 18 Mar 2024
Induction motor works on the principle of electromagnetic induction to generate rotating magnetic field.
Induction motor has a stator with a set of windings that are connected to an AC power supply.
When AC current flows through the stator windings, it creates a rotating magnetic field.
This rotating magnetic field induces currents in the rotor windings, causing the rotor to rotate.
The rotor never reaches the synchronous ...
posted on 24 Apr 2024
I applied via Job Fair and was interviewed in Mar 2024. There were 2 interview rounds.
Technical or aptitude
Past experiences and reason of job change along with the expectation from Daikin
I applied via Recruitment Consulltant and was interviewed before Aug 2022. There were 3 interview rounds.
I am a dedicated and experienced Production Engineer with a strong background in manufacturing processes and quality control.
Bachelor's degree in Mechanical Engineering
5+ years of experience in production engineering
Proficient in CAD software and manufacturing processes
Led a team to improve production efficiency by 20% in my previous role
As a Production Engineer, my role involves overseeing the manufacturing process, ensuring efficiency, quality, and safety.
Oversee the manufacturing process to ensure efficiency and quality
Identify and troubleshoot any issues that arise during production
Implement improvements to enhance productivity and reduce costs
Collaborate with other departments to optimize processes and meet production goals
I applied via Walk-in and was interviewed in Jan 2024. There were 2 interview rounds.
The full repair breakdown rms refers to the detailed analysis of the repair process in a production environment.
The full repair breakdown includes a step-by-step breakdown of the repair process.
It provides information on the time taken for each step, the resources used, and any issues encountered.
The breakdown helps identify bottlenecks, inefficiencies, and areas for improvement in the repair process.
Examples of data c...
1.ac.2 repair.3demo.intalltiob
I applied via Naukri.com and was interviewed before Oct 2023. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 13 reviews
Rating in categories
Assistant Manager
111
salaries
| ₹5 L/yr - ₹13 L/yr |
Production Engineer
53
salaries
| ₹2.4 L/yr - ₹5.5 L/yr |
Senior Executive
44
salaries
| ₹3.9 L/yr - ₹7.3 L/yr |
Purchase Executive
41
salaries
| ₹2.4 L/yr - ₹5.6 L/yr |
Executive Accountant
34
salaries
| ₹2.5 L/yr - ₹5.6 L/yr |
OPPO
LG Electronics
Bajaj Electricals
Voltas