i
GHCL Limited
Filter interviews by
I applied via Naukri.com and was interviewed before Nov 2023. There were 3 interview rounds.
About communication skill
How to work and what is your job role
Top trending discussions
I applied via Referral and was interviewed in Mar 2021. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in May 2021. There were 4 interview rounds.
posted on 13 Oct 2021
I applied via Referral and was interviewed before Oct 2020. There were 4 interview rounds.
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
I have extensive experience in using various piping design tools.
Proficient in using AutoCAD for piping design
Familiar with 3D modeling software like SolidWorks for creating detailed piping layouts
Skilled in using piping design software such as Caesar II for stress analysis
Experience in using PDMS (Plant Design Management System) for piping design and layout
Knowledge of industry standards and codes related to piping de
I applied via Naukri.com and was interviewed in Sep 2019. There were 3 interview rounds.
GMAW stands for Gas Metal Arc Welding, a welding process that uses a continuous solid wire electrode and shielding gas to create a weld.
Uses a continuous solid wire electrode
Requires a shielding gas to protect the weld from atmospheric contamination
Commonly used in industries like automotive, construction, and manufacturing
MIG stands for Metal Inert Gas welding, while MAG stands for Metal Active Gas welding. The main difference lies in the type of shielding gas used.
MIG welding uses inert gases like argon or helium to shield the weld pool from atmospheric contamination, while MAG welding uses active gases like carbon dioxide or a mixture of gases.
MIG welding is typically used for non-ferrous metals like aluminum, while MAG welding is mor...
WPS Procee is a welding procedure specification that outlines the details of a specific welding process.
WPS Procee includes information such as welding materials, welding parameters, preheat and post-weld heat treatment requirements.
It is essential for ensuring consistency and quality in welding operations.
WPS Procee is often required in industries such as construction, manufacturing, and oil & gas.
Example: A WPS Proce...
PQR Process is a procedure used in welding to qualify the welding procedure specification.
PQR stands for Procedure Qualification Record.
It involves testing and documenting the variables used during the welding process.
The purpose is to ensure that the welding procedure will produce the desired quality of welds.
PQR Process is essential for ensuring the integrity and strength of welded joints.
Examples of variables tested...
Experienced Senior Engineer with a strong background in software development and project management.
Over 10 years of experience in software engineering
Proficient in multiple programming languages such as Java, Python, and C++
Led successful projects from conception to completion, resulting in increased efficiency and cost savings
Strong problem-solving skills and ability to work well in a team environment
Seeking new challenges and opportunities for growth.
Looking for a new environment to learn and develop new skills.
Interested in working on different projects to broaden my experience.
Seeking a company with better career advancement opportunities.
Want to explore new technologies and methodologies in the industry.
I applied via LinkedIn and was interviewed before Sep 2022. There were 3 interview rounds.
Pipe sizing calculation involves determining the appropriate diameter of a pipe based on flow rate, pressure drop, and material properties.
Calculate the required flow rate for the system
Determine the pressure drop allowed in the system
Consider the material properties of the pipe such as friction factor and roughness
Use pipe sizing charts or formulas to find the appropriate diameter
Ensure the selected pipe size meets th
I appeared for an interview before Mar 2024.
Basic aptitude question of gate and in technical go through gate 1 mark question
Shell and tube heat exchanger design involves selecting appropriate materials, determining tube layout, and calculating heat transfer coefficients.
Select appropriate materials based on fluid properties and operating conditions
Determine tube layout to optimize heat transfer efficiency
Calculate heat transfer coefficients to ensure proper heat exchange
Consider factors like fouling, pressure drop, and thermal expansion in ...
I applied via Campus Placement and was interviewed before Sep 2022. There were 4 interview rounds.
About Work Culture and how is wfh affecting people
Duration of the aptitude test was around 30 mins
based on 1 interview
Interview experience
Assistant Manager
77
salaries
| ₹3.3 L/yr - ₹10.3 L/yr |
Deputy Manager
49
salaries
| ₹7 L/yr - ₹14 L/yr |
Senior Engineer
40
salaries
| ₹3 L/yr - ₹6.9 L/yr |
Manager
18
salaries
| ₹10 L/yr - ₹16.6 L/yr |
Engineer
18
salaries
| ₹2.2 L/yr - ₹6.5 L/yr |
Berger Paints
Pidilite Industries
SRF
Kansai Nerolac Paints