Lean manufacturing is a systematic approach to identifying and eliminating waste in the production process.
Focuses on continuous improvement
Minimizes inventory and reduces lead time
Empowers employees to identify and solve problems
Uses tools such as value stream mapping and 5S
Examples include Toyota Production System and Kaizen
Cycle time is the time it takes to complete a process or task from start to finish.
It is a measure of efficiency and productivity.
It can be calculated by dividing the total production time by the number of units produced.
Reducing cycle time can lead to increased output and profitability.
Examples include the time it takes to manufacture a product, process an order, or complete a project.
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
I appeared for an interview before Jan 2024.
I applied via Campus Placement and was interviewed in Nov 2023. There were 2 interview rounds.
Groz Engineering Tools interview questions for popular designations
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Sep 2022. There were 3 interview rounds.
I appeared for an interview in Sep 2022.
I applied via Recruitment Consulltant and was interviewed in Apr 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Aug 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Dec 2021. There were 2 interview rounds.
Top trending discussions
based on 16 interviews
Interview experience
based on 236 reviews
Rating in categories
Assistant Manager
41
salaries
| ₹4.5 L/yr - ₹12 L/yr |
Senior Engineer
35
salaries
| ₹3.7 L/yr - ₹7 L/yr |
Quality Inspector
23
salaries
| ₹1.6 L/yr - ₹3.5 L/yr |
Senior Executive
22
salaries
| ₹3.8 L/yr - ₹9 L/yr |
Junior Engineer
19
salaries
| ₹1.6 L/yr - ₹4.8 L/yr |
Taparia Tools
JK Files
Miranda Tools
Addison