Upload Button Icon Add office photos

Filter interviews by

GOODWILL ADVANCE CONST. CO. Civil Engineer-Highway/Roadway Interview Questions and Answers

Updated 11 Jan 2020

GOODWILL ADVANCE CONST. CO. Civil Engineer-Highway/Roadway Interview Experiences

2 interviews found

Interview Questionnaire 

4 Questions

  • Q1. What are Comper
  • Ans. 

    Comper is not a term used in civil engineering. It may be a misspelling or a term used in a different field.

    • Comper is not a term used in civil engineering

    • It may be a misspelling or a term used in a different field

    • Without more context, it is difficult to provide a specific answer

  • Answered by AI
  • Q2. What are dullas bar work
  • Q3. What are suparelevection
  • Ans. 

    Superelevation is the banking of a roadway on a curve to counteract the centrifugal force acting on a vehicle.

    • Superelevation is also known as banked curve or cant.

    • It is used to increase the speed of vehicles on curved roads.

    • The amount of superelevation required depends on the design speed of the road and the radius of the curve.

    • Superelevation is achieved by raising the outer edge of the road and lowering the inner edge...

  • Answered by AI
  • Q4. Sub gread layar thiknesh

Interview Questionnaire 

4 Questions

  • Q1. Dam project, canal project power plant project,reservoiar project, Road project for any work at civil line
  • Q2. 1=rcc lining subgread and Q/C
  • Q3. Hard work and Team menajment
  • Q4. Site work and Team controling

Civil Engineer-Highway/Roadway Interview Questions Asked at Other Companies

Q1. 1-length on one rail. 2-types of rail in india 3- ductility of bi ... read more
Q2. A district road with a bituminous pavement has a horizontal curve ... read more
Q3. What is aggregate impact testing and specifications of apparatus ... read more
Q4. What is the amount of lime in cement?
Q5. What is blanket layer in formation of railway embankment.

Interview questions from similar companies

Round 1 - Technical 

(2 Questions)

  • Q1. Difference b/w Rigid Pavement & Flexible Pavement How we finalized Crust thickness of Pavement. High Embankment CBR of S.G Formation width & Formation Level From which level we maintain super elevation Min...
  • Ans. 

    Rigid pavement is made of concrete while flexible pavement is made of asphalt. Crust thickness is determined by traffic load and soil type.

    • Rigid pavement is more durable and has a longer lifespan than flexible pavement.

    • Flexible pavement is easier and cheaper to repair than rigid pavement.

    • Crust thickness is determined by factors such as traffic load, soil type, and climate conditions.

    • High embankment requires a wider for...

  • Answered by AI
  • Q2. Rectification of Rigid Pavement Why we provide approach slab Crust thickness details of each project Wearing courses in detail
  • Ans. 

    Approach slabs are provided for rectification of rigid pavement to ensure smooth transition and prevent damage to the pavement.

    • Approach slabs are used to provide a smooth transition between the rigid pavement and the adjacent flexible pavement.

    • They also help to distribute the load from the flexible pavement to the rigid pavement.

    • Crust thickness details vary for each project depending on factors such as traffic volume, ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Understand , analysis
IRC-15/44/49/58
IRC-37/73/84/86
MORTH 5th Edition Section
300/400/500/600/900/3000

GOODWILL ADVANCE CONST. CO. Interview FAQs

What are the top questions asked in GOODWILL ADVANCE CONST. CO. Civil Engineer-Highway/Roadway interview?

Some of the top questions asked at the GOODWILL ADVANCE CONST. CO. Civil Engineer-Highway/Roadway interview -

  1. What are suparelevecti...read more
  2. What are Comp...read more
  3. Dam project, canal project power plant project,reservoiar project, Road project...read more

Tell us how to improve this page.

Project Manager
4 salaries
unlock blur

₹6 L/yr - ₹12 L/yr

Site Engineer
4 salaries
unlock blur

₹1.8 L/yr - ₹3.3 L/yr

Site Incharge
4 salaries
unlock blur

₹3.5 L/yr - ₹6 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹1.4 L/yr - ₹4.2 L/yr

Structural Engineer
3 salaries
unlock blur

₹3.6 L/yr - ₹4 L/yr

Explore more salaries
Compare GOODWILL ADVANCE CONST. CO. with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview