Round 1 - One-on-one 

(2 Questions)

  • Q1. Done by good, not recommended join
  • Q2. Basic civil construction concepts

Interview Preparation Tips

Interview preparation tips for other job seekers - The worst company I have never seen 🙏🙏🙏🙏 don't join to

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Technical Civil Execution engineering with finishing RCC experience
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions
Round 3 - Technical 

(1 Question)

  • Q1. Technical questions
Round 4 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Written paper as per site and codes

Round 2 - Group Discussion 

It’s about Quality and execution with VP and audit team

Round 3 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Joining procedures and company policy

I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Deduction in shuttering criteria
  • Ans. 

    Deduction in shuttering criteria refers to the reduction in the amount of shuttering material used in construction.

    • Deduction in shuttering criteria is done to reduce the cost of construction.

    • It is also done to reduce the time taken for construction.

    • The deduction is usually done based on the strength of the concrete being used.

    • For example, if the concrete strength is high, less shuttering material is required.

    • The deduct...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepared yourself for interview to get selection

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. What are you doing this company is looking for an interview.

Interview Preparation Tips

Interview preparation tips for other job seekers - This company is good working condition and new income certificate 👍
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2022. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. About civil engineering for site and billing Quantity surveying and rate analysis .actual site quantity measurements and check contractor bill and certification
  • Q2. Concrete quantity calculations
  • Q3. As per site and as per drawing calculated

Interview Preparation Tips

Interview preparation tips for other job seekers - No future and no skill and no development and no life balance
Interview experience
1
Bad
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Aptitude Test 

QA QC related questions

Round 3 - HR 

(1 Question)

  • Q1. 1.Tell me about your self. 2.why join Ashar 3.current roles and responsibilities 4.current CTC 5.expected CTC 6.why r u leaving your current organisation 7.How to judge your expected CTC amount can u brief
Round 4 - Technical 

(1 Question)

  • Q1. Starts with basic technical concepts with deep and deep (How and why) then discussion with current work experience in detail with difficulty faced on (How and Why)...last que Why we should select you
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be honest with your years of experience. All information you share will be verified at the time of joining.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Just construction activities
Round 3 - HR 

(1 Question)

  • Q1. Just Salary negotiations
Round 4 - Behavioral 

(1 Question)

  • Q1. Position and Salary Finalisation

Interview Preparation Tips

Topics to prepare for Ashar group Site Engineer interview:
  • Construction Activity
  • finishing
  • Billing
  • Site Supervision
Interview preparation tips for other job seekers - Just be confident and prompt
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
-

I applied via Walk-in and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Qty of cement in M25 grade concrete
  • Ans. 

    The quantity of cement in M25 grade concrete is 350 kg/m³.

    • M25 grade concrete has a mix proportion of 1:1:2 (cement:sand:aggregate).

    • The total volume of concrete is taken as 1 m³.

    • Therefore, the quantity of cement required for 1 m³ of M25 grade concrete is 350 kg.

    • This is calculated by multiplying the volume of concrete by the proportion of cement in the mix.

  • Answered by AI
  • Q2. Exact weight of different dia of steel
  • Ans. 

    The weight of steel varies with its diameter.

    • The weight of steel can be calculated using the formula: weight = volume x density

    • The density of steel is approximately 7850 kg/m³

    • The volume of steel can be calculated using the formula: volume = pi x (diameter/2)² x length

    • For example, a 10mm diameter steel rod with a length of 1 meter would weigh approximately 0.393 kg

  • Answered by AI
  • Q3. Process of waterproofing
  • Ans. 

    Waterproofing is the process of making a structure or object resistant to water penetration.

    • Identify the areas that need waterproofing such as roofs, walls, and foundations.

    • Clean and prepare the surface to be waterproofed.

    • Apply a waterproofing membrane or coating such as bituminous, acrylic, or polyurethane.

    • Ensure proper drainage and slope to prevent water accumulation.

    • Test the waterproofing system for leaks and make n...

  • Answered by AI
  • Q4. Conversion of brass to Cum
  • Ans. 

    Conversion of brass to Cum

    • Brass is an alloy of copper and zinc, while Cum is not a known substance

    • It is not possible to convert brass to Cum

    • Perhaps the question is referring to a different substance or material

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Worst management. My interview was scheduled on Friday but on Wednesday they email me to come on Thursday. When I reached the mentioned location in email , i was given another location which was 2-3 km away. However when I reached the venue, interview time was 11 Am but it started at 1. Pm . After interview Hr called and told me that you are selected for so and so position but there will be no hike on your current salary, and you have to come for second round . After 15 days they replied me that you are not selected.

Gm Infinite Dwelling Interview FAQs

How many rounds are there in Gm Infinite Dwelling Senior Site Engineer interview?
Gm Infinite Dwelling interview process usually has 1 rounds. The most common rounds in the Gm Infinite Dwelling interview process are One-on-one Round.
What are the top questions asked in Gm Infinite Dwelling Senior Site Engineer interview?

Some of the top questions asked at the Gm Infinite Dwelling Senior Site Engineer interview -

  1. Done by good, not recommended j...read more
  2. Basic civil construction conce...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Sobha Interview Questions
3.8
 • 130 Interviews
Lodha Group Interview Questions
4.0
 • 126 Interviews
DLF Interview Questions
3.9
 • 76 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Puravankara Interview Questions
3.7
 • 19 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
View all
Gm Infinite Dwelling Senior Site Engineer Salary
based on 11 salaries
₹3.7 L/yr - ₹11.2 L/yr
13% more than the average Senior Site Engineer Salary in India
View more details

Gm Infinite Dwelling Senior Site Engineer Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

3.0

Skill development

3.0

Work-life balance

3.0

Salary

3.0

Job security

3.0

Company culture

3.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
19 salaries
unlock blur

₹1.7 L/yr - ₹6 L/yr

Executive Accountant
13 salaries
unlock blur

₹1.8 L/yr - ₹6.6 L/yr

Site Engineer
12 salaries
unlock blur

₹2 L/yr - ₹3.5 L/yr

Senior Site Engineer
11 salaries
unlock blur

₹3.7 L/yr - ₹11.2 L/yr

Assistant Manager
10 salaries
unlock blur

₹4.6 L/yr - ₹7.6 L/yr

Explore more salaries
Compare Gm Infinite Dwelling with

Signature Global

4.0
Compare

Pittie Group

2.7
Compare

Advance India Projects

3.7
Compare

Vestian Global Workplace Services

3.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview