Filter interviews by
The speed ratio for a tunnel depends on various factors such as the size and type of the tunnel.
The speed ratio for a tunnel can range from 10 to 100 rpm depending on the size and type of the tunnel.
The speed ratio is calculated by dividing the speed of the conveyor belt by the speed of the tunnel.
For example, if the conveyor belt is moving at a speed of 100 feet per minute and the tunnel is 10 feet long, the spee...
Automation flow for CSV validation involves identifying data sources, creating test cases, executing tests, and generating reports.
Identify data sources and ensure data integrity
Create test cases based on requirements and expected outcomes
Execute tests using automation tools and scripts
Validate results and identify any discrepancies
Generate reports to document test results and findings
Equipment qualifications follow a defined flow to ensure compliance with regulations and standards.
The first step is to define the equipment and its intended use.
Next, the equipment is installed and tested to ensure it meets specifications.
Operational qualifications are then performed to ensure the equipment functions correctly.
Performance qualifications are conducted to ensure the equipment consistently produces ...
Input and output logs are records of data entering and leaving a system. They are used for troubleshooting and auditing purposes.
Input logs record data that enters a system, such as user input or data from another system.
Output logs record data that leaves a system, such as responses to user requests or data sent to another system.
These logs are used for troubleshooting issues with the system, as well as for audit...
Explanation of span, spread and equilibrium time.
Span refers to the duration of time over which a process or event occurs.
Spread refers to the distribution of values or results within a given set of data.
Equilibrium time is the time required for a system to reach a steady state or balance.
For example, the span of a clinical trial may be several years, the spread of test results may vary widely, and the equilibrium...
Tests performed for tunnel include connectivity, throughput, latency, and security.
Connectivity tests ensure that the tunnel is properly established and data can be transmitted.
Throughput tests measure the amount of data that can be transmitted through the tunnel in a given time period.
Latency tests measure the delay between data being sent and received through the tunnel.
Security tests ensure that the tunnel is s...
Tests performed for autoclave include biological indicator testing, temperature mapping, and pressure testing.
Biological indicator testing is done to ensure that the autoclave is effectively killing microorganisms.
Temperature mapping is performed to ensure that the autoclave is maintaining the required temperature throughout the sterilization process.
Pressure testing is conducted to verify that the autoclave is ma...
HVAC tests are tests conducted to ensure the proper functioning and efficiency of heating, ventilation, and air conditioning systems.
HVAC tests involve checking the temperature control and distribution systems.
Tests may include measuring airflow, checking for leaks, and inspecting ductwork.
Performance tests are conducted to assess the overall efficiency and effectiveness of the HVAC system.
Examples of HVAC tests i...
I applied via Naukri.com and was interviewed in Dec 2020. There were 4 interview rounds.
HVAC tests are tests conducted to ensure the proper functioning and efficiency of heating, ventilation, and air conditioning systems.
HVAC tests involve checking the temperature control and distribution systems.
Tests may include measuring airflow, checking for leaks, and inspecting ductwork.
Performance tests are conducted to assess the overall efficiency and effectiveness of the HVAC system.
Examples of HVAC tests includ...
Tests performed for autoclave include biological indicator testing, temperature mapping, and pressure testing.
Biological indicator testing is done to ensure that the autoclave is effectively killing microorganisms.
Temperature mapping is performed to ensure that the autoclave is maintaining the required temperature throughout the sterilization process.
Pressure testing is conducted to verify that the autoclave is maintai...
Tests performed for tunnel include connectivity, throughput, latency, and security.
Connectivity tests ensure that the tunnel is properly established and data can be transmitted.
Throughput tests measure the amount of data that can be transmitted through the tunnel in a given time period.
Latency tests measure the delay between data being sent and received through the tunnel.
Security tests ensure that the tunnel is secure...
Equipment qualifications follow a defined flow to ensure compliance with regulations and standards.
The first step is to define the equipment and its intended use.
Next, the equipment is installed and tested to ensure it meets specifications.
Operational qualifications are then performed to ensure the equipment functions correctly.
Performance qualifications are conducted to ensure the equipment consistently produces accur...
Automation flow for CSV validation involves identifying data sources, creating test cases, executing tests, and generating reports.
Identify data sources and ensure data integrity
Create test cases based on requirements and expected outcomes
Execute tests using automation tools and scripts
Validate results and identify any discrepancies
Generate reports to document test results and findings
Explanation of span, spread and equilibrium time.
Span refers to the duration of time over which a process or event occurs.
Spread refers to the distribution of values or results within a given set of data.
Equilibrium time is the time required for a system to reach a steady state or balance.
For example, the span of a clinical trial may be several years, the spread of test results may vary widely, and the equilibrium time...
The speed ratio for a tunnel depends on various factors such as the size and type of the tunnel.
The speed ratio for a tunnel can range from 10 to 100 rpm depending on the size and type of the tunnel.
The speed ratio is calculated by dividing the speed of the conveyor belt by the speed of the tunnel.
For example, if the conveyor belt is moving at a speed of 100 feet per minute and the tunnel is 10 feet long, the speed rat...
Input and output logs are records of data entering and leaving a system. They are used for troubleshooting and auditing purposes.
Input logs record data that enters a system, such as user input or data from another system.
Output logs record data that leaves a system, such as responses to user requests or data sent to another system.
These logs are used for troubleshooting issues with the system, as well as for auditing a...
Top trending discussions
I appeared for an interview before Sep 2021.
I applied via Naukri.com and was interviewed in Mar 2022. There were 4 interview rounds.
Eye Q test
I applied via Walk-in and was interviewed in May 2024. There were 2 interview rounds.
My name Devender singh tanwar and belong from palwal haryana . I have done work in poly medicure company from 2013 to 2022..I was good employee of this company.
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
I appeared for an interview before Jun 2024, where I was asked the following questions.
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
I appeared for an interview before Jan 2024.
I resigned to pursue new opportunities and challenges in my career.
Seeking career growth and advancement
Looking for new challenges and opportunities
Wanting to explore different industries or roles
Personal reasons such as relocation or family commitments
posted on 6 Jul 2022
I applied via AmbitionBox and was interviewed in Jun 2022. There were 5 interview rounds.
I am a detail-oriented Quality Controller with a strong background in quality assurance and process improvement.
Over 5 years of experience in quality control in manufacturing environments.
Skilled in using statistical process control (SPC) to monitor production quality.
Implemented a new quality management system that reduced defects by 30%.
Strong communication skills, facilitating training sessions for staff on quality ...
Room temperature refers to the average temperature of a room or space.
Room temperature is typically between 68-72 degrees Fahrenheit (20-22 degrees Celsius).
It is important to maintain a consistent room temperature for certain products or processes.
Room temperature can affect the comfort and productivity of individuals in a space.
Temperature can be measured using a thermometer or thermostat.
Factors such as humidity and...
Production quality of tablets and capsule
A punching machine is used to punch holes or shapes in materials such as paper, plastic, or metal.
The operator should be trained on how to operate the machine safely.
The machine should be regularly maintained to ensure it is functioning properly.
The correct punch and die should be selected for the material being punched.
The material being punched should be properly aligned and secured in the machine.
The operator should...
Compatible with other staff and discuss about production, quality and their standard
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There were 3 interview rounds.
Executive
446
salaries
| ₹3.8 L/yr - ₹8 L/yr |
Chemist
423
salaries
| ₹2.1 L/yr - ₹5.3 L/yr |
Assistant Manager
409
salaries
| ₹6 L/yr - ₹12 L/yr |
Junior Executive
408
salaries
| ₹2.9 L/yr - ₹7 L/yr |
Senior Executive
291
salaries
| ₹5 L/yr - ₹9.6 L/yr |
Poly Medicure
Medtronic
Alcon
Romsons Group Of Industries