Filter interviews by
posted on 29 Sep 2023
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
Top trending discussions
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Walk-in and was interviewed in Mar 2022. There were 3 interview rounds.
Like arthematic questions and marketing questions
posted on 17 Dec 2024
A typical day at the company involves overseeing daily operations, managing staff, handling customer inquiries, and ensuring targets are met.
Start the day by reviewing the previous day's performance and setting goals for the current day
Hold a morning meeting with staff to delegate tasks and address any issues
Monitor inventory levels and place orders as needed
Assist customers with inquiries or complaints
Conduct performa...
The work environment at the company is collaborative, fast-paced, and focused on continuous improvement.
Collaborative team atmosphere where employees work together towards common goals
Fast-paced environment with opportunities for growth and development
Culture of continuous improvement and innovation
Open communication and feedback channels to encourage employee engagement
The best part of working at the company is the supportive and collaborative work environment.
Supportive and collaborative work environment
Opportunities for growth and development
Strong company culture
Recognition for hard work
Great team dynamics
7QC tools are a set of quality control tools used to identify and solve quality problems in manufacturing processes.
7QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.
They help in identifying and analyzing quality problems, determining root causes, and implementing corrective actions.
They are used to improve product quality, reduce defects, an...
PPAP and APQP are quality management systems used in manufacturing.
PPAP stands for Production Part Approval Process and is used to ensure that manufactured parts meet customer requirements.
APQP stands for Advanced Product Quality Planning and is used to plan and manage the design and development of new products.
Both systems are commonly used in the automotive industry but can be applied to other manufacturing industrie...
Pareto is a principle that states 80% of effects come from 20% of causes.
Also known as the 80/20 rule
Used in business to identify the most important factors
Can be applied to various fields such as economics, engineering, and social sciences
Example: 80% of a company's profits come from 20% of its customers
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
posted on 21 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
It was basic level coding question. you can answer if you strong in basic level of java
Tooling refers to the process of designing and manufacturing tools or equipment used in production.
Tooling involves creating molds, dies, jigs, fixtures, and other equipment used in manufacturing processes.
It plays a crucial role in ensuring the quality and efficiency of production.
Tooling can be customized based on specific production requirements.
Examples of tooling include injection molds for plastic parts, stamping...
posted on 12 Dec 2024
The question is related to structural engineering concepts like code, footing design, and load combination.
Code refers to the set of rules and regulations that govern the design and construction of structures.
Footing design involves determining the size and depth of footings to support the structure above.
Load combination is the process of combining different types of loads (e.g. dead load, live load, wind load) to ass
I appeared for an interview in Jan 2025.
Yes electrical design engineer releted questions
I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.
Line balancing is the process of evenly distributing workload among workstations in a production line to optimize efficiency.
Line balancing aims to minimize idle time and maximize productivity
It involves assigning tasks to workstations based on their processing times
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
Assembly balancing is the process of optimizing the work distribution among different workstations to improve efficiency and productivity.
Assembly balancing involves assigning tasks to different workstations in a way that minimizes idle time and maximizes throughput.
It helps in achieving a smooth flow of work and prevents bottlenecks in the production process.
Factors considered in assembly balancing include task time, ...
Cycle time is the total time it takes to complete a process, while tact time is the time it takes to produce one unit.
Cycle time includes all the time spent on a process, including wait time and processing time.
Tact time is the rate at which a product must be produced to meet customer demand.
For example, if a process takes 10 minutes to complete and the customer demand is 100 units per hour, the tact time would be 0.6 ...
Production is the process of creating goods or services, while quality refers to the standard of those goods or services.
Production involves the manufacturing or creation of goods or services.
Quality refers to the standard or level of excellence of those goods or services.
Production and quality are closely linked as the goal is to produce high-quality products efficiently.
Examples: In a manufacturing plant, production ...
OLE stands for Overall Equipment Effectiveness and OEE stands for Overall Labor Effectiveness.
OLE measures the overall performance of equipment in a manufacturing plant.
OEE measures the overall performance of labor in a manufacturing plant.
Both metrics are used to identify areas for improvement and optimize efficiency.
Example: OLE can help identify equipment downtime and OEE can help identify labor productivity issues.
based on 1 interview
Interview experience
Senior Executive
178
salaries
| ₹1.5 L/yr - ₹5.5 L/yr |
Assistant Manager
168
salaries
| ₹2.1 L/yr - ₹7 L/yr |
Senior HR Executive
120
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
HR Executive
96
salaries
| ₹1 L/yr - ₹4 L/yr |
Facility Executive
69
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Coca-Cola Company
Dhoot Transmission
Apotex Research
Athena BPO