Filter interviews by
Be the first one to contribute and help others!
I have 5 years of experience in the same product industry, working on various projects and gaining expertise in the field.
Worked on product development and improvement projects
Collaborated with cross-functional teams to ensure product quality and efficiency
Implemented new technologies and processes to enhance product performance
Participated in product testing and validation processes
Provided technical support and train
I appeared for an interview in Sep 2023.
The aptitude test though difficult had no negative marking. Passing marks could be acheived easily.
I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.
MTTR stands for Mean Time To Repair and MTBF stands for Mean Time Between Failures.
MTTR is the average time taken to repair a failed component or system.
MTBF is the average time between failures of a component or system.
MTTR is calculated as total downtime divided by the number of failures.
MTBF is calculated as total uptime divided by the number of failures.
For example, if a system has an MTTR of 2 hours and an MTBF of...
Data type string in PLC is used to store alphanumeric characters or text data.
String data type is used to store text data in PLC programming.
Strings can be used to store alphanumeric characters, words, sentences, etc.
Example: STRING name := 'John Smith';
I applied via Naukri.com and was interviewed in Aug 2021. There were 5 interview rounds.
Africa is a continent with 54 countries, each with its own unique culture, history, and natural resources.
Africa has 54 countries
The largest country in Africa is Algeria
The most populous country in Africa is Nigeria
Egypt is known for its ancient pyramids and Sphinx
South Africa is known for its wildlife and natural beauty
Kenya is known for its wildlife and safaris
Ethiopia is known for its coffee and ancient history
Ghana...
I appeared for an interview before Apr 2022.
A cooling tower is a device used to remove heat from a building or industrial process.
The function of a cooling tower is to cool down water or other fluids by extracting heat from them.
Cooling towers are commonly used in HVAC systems, power plants, and industrial processes.
They work by evaporating a small portion of the water, which removes heat and cools down the remaining water.
The cooled water is then circulated bac...
To dismantle a boiler feed pump, follow these steps
Isolate the pump from the power source and drain the water from the system
Remove the coupling and motor from the pump
Disconnect the suction and discharge piping from the pump
Remove the bolts and nuts that hold the pump casing together
Lift the casing off the pump and remove the impeller and shaft
Inspect and clean all parts before reassembling or replacing
I applied via Indeed and was interviewed in Nov 2021. There were 5 interview rounds.
I have extensive experience in handling stores independently.
I have a strong understanding of inventory management and stock control.
I am skilled in creating and implementing efficient systems for receiving, storing, and distributing goods.
I have experience in managing a team of store personnel and ensuring their productivity and performance.
I am proficient in using various software and tools for store management, such...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
posted on 15 Aug 2023
I applied via Naukri.com and was interviewed in Nov 2022. There were 3 interview rounds.
Minimum specs for purchasing motors and gauges include power rating, voltage, current, size, accuracy, and compatibility.
Power rating should match the requirements of the application (e.g. 1 HP motor for a specific machine)
Voltage should be compatible with the power supply (e.g. 220V motor for industrial use)
Current rating should be sufficient for the load (e.g. 5A gauge for measuring heavy machinery)
Size of the motor ...
I will add value to the existing process by optimizing procurement strategies, reducing costs, and improving supplier relationships.
Implementing cost-saving measures such as negotiating better prices with suppliers
Streamlining the procurement process to improve efficiency
Identifying and developing relationships with new suppliers to increase options and reduce lead times
based on 11 reviews
Rating in categories
Quality Engineer
5
salaries
| ₹1.8 L/yr - ₹2.5 L/yr |
HR Executive
4
salaries
| ₹3.7 L/yr - ₹4 L/yr |
Sales Executive
4
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Store Manager
4
salaries
| ₹4.6 L/yr - ₹5.5 L/yr |
Marketing Executive
4
salaries
| ₹2.7 L/yr - ₹4.2 L/yr |
African Industries
Imerys
Oswal Castings
Thriveni Sainik Mining