Filter interviews by
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
I am a production engineer with experience in designing and implementing manufacturing processes.
I have a degree in mechanical engineering
I have worked on projects to optimize production lines and reduce costs
I have experience with CAD software and 3D printing
I am familiar with Lean Manufacturing principles
I am a team player and enjoy collaborating with others to achieve goals
I have the necessary skills, experience and passion to excel in this role.
I have a degree in Production Engineering and relevant work experience
I am skilled in using production software and tools
I have a strong attention to detail and can identify and solve problems efficiently
I am a team player and can work collaboratively to achieve goals
I am passionate about the field and am always eager to learn and improve
I appeared for an interview in Dec 2016.
A two-stroke engine completes a power cycle in two strokes of the piston, while a four-stroke engine completes it in four strokes.
Two-stroke engines have a simpler design and are lighter than four-stroke engines.
Two-stroke engines have a higher power-to-weight ratio but lower fuel efficiency compared to four-stroke engines.
Four-stroke engines have separate intake, compression, power, and exhaust strokes, while two-stro...
A pictorial representation of a SI engine with valve opening, TDC, and BDC.
SI engine stands for Spark Ignition engine, which is commonly used in gasoline-powered vehicles.
Valve opening refers to the movement of the intake and exhaust valves to allow fuel-air mixture in and exhaust gases out of the combustion chamber.
TDC (Top Dead Center) is the position of the piston at the extreme top of its stroke.
BDC (Bottom Dead Ce...
I would improve the fuel efficiency of TVS motorcycles by implementing advanced engine technology.
Implementing electronic fuel injection system for better fuel management
Introducing hybrid technology for improved mileage
Optimizing aerodynamics of the motorcycle for reduced drag
Using lightweight materials for better fuel economy
I am a dedicated production engineer with a strong background in manufacturing processes and quality control.
Graduated with a degree in Mechanical Engineering
Experience working in a manufacturing plant for 3 years
Proficient in CAD software for designing production layouts
Implemented lean manufacturing principles to improve efficiency
Led a team in reducing production downtime by 20%
I appeared for an interview in Jul 2017.
I applied via Campus Placement and was interviewed before May 2020. There was 1 interview round.
I applied via Referral and was interviewed in May 2019. There were 4 interview rounds.
I am excited about the opportunity to work at KIA because of the company's reputation, growth potential, and the chance to learn a new language.
I am confident in my ability to adapt and learn quickly, including picking up the local language over time.
I believe that my skills and experience in production engineering are valuable to KIA, regardless of language barriers.
I am motivated by the challenge of working in a dive...
posted on 28 Jun 2021
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
Troubleshooting involves identifying, analyzing, and solving problems in a systematic manner.
Identify the problem by gathering information and observing the issue
Analyze the possible causes of the problem using logical reasoning and data
Develop a plan to address the root cause of the issue
Implement the solution and test to ensure it resolves the problem
Document the troubleshooting process for future reference
A fishbone diagram, also known as Ishikawa diagram, is a visual tool used to analyze potential causes of a problem.
Also known as Ishikawa diagram
Used to analyze potential causes of a problem
Categories typically include people, process, environment, equipment, and materials
Cycle time is the total time taken to complete a process, while takt time is the time available to complete a process.
Cycle time includes both processing time and any wait time in between tasks
Takt time is calculated as available production time divided by customer demand
For example, if a production line has a cycle time of 10 minutes and a takt time of 5 minutes, it means the line can produce 2 units every 10 minutes
posted on 13 Jul 2022
Aptitude test through online mode
I applied via Naukri.com and was interviewed before Jun 2023. There was 1 interview round.
based on 3 interviews
Interview experience
based on 15 reviews
Rating in categories
Production Associate
816
salaries
| ₹3 L/yr - ₹12 L/yr |
Software Engineer
442
salaries
| ₹5.1 L/yr - ₹29.7 L/yr |
Deputy Manager
405
salaries
| ₹15.5 L/yr - ₹36 L/yr |
Team Lead
274
salaries
| ₹4.4 L/yr - ₹16 L/yr |
Financial Analyst
238
salaries
| ₹7.8 L/yr - ₹19.9 L/yr |
Tata Motors
Mahindra & Mahindra
Maruti Suzuki
Ashok Leyland