I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
Top trending discussions
I applied via Referral
I am a determined and resourceful individual who tackles problems by breaking them down into smaller tasks and finding creative solutions.
I approach problems with a positive attitude and a willingness to learn from challenges.
I prioritize tasks based on urgency and importance to effectively manage my time.
I seek input from others and collaborate to brainstorm solutions.
I am not afraid to take risks and try new approach...
Passionate, driven, and adaptable individual with a strong work ethic and a desire to learn and grow.
Passionate - I am deeply passionate about my work and always strive to give my best.
Driven - I am highly motivated and focused on achieving my goals.
Adaptable - I am able to quickly adjust to new situations and challenges.
Strong work ethic - I believe in hard work and dedication to achieve success.
Desire to learn and gr...
I passed my engineering from XYZ College.
I graduated from XYZ College with a degree in engineering.
I completed my engineering studies at XYZ College.
I am a proud alumni of XYZ College's engineering program.
I applied via Naukri.com and was interviewed in Jul 2024. There were 3 interview rounds.
Easy more quantitative type
Speak more and relevant to topic
Accounting involves recording, analyzing, and reporting financial transactions of a business.
Recording financial transactions
Analyzing financial data
Preparing financial statements
Budgeting and forecasting
Understanding debits and credits
I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.
ASME codes are widely used in the oil and gas industry to ensure safety and quality standards are met.
ASME B31.3 is the code for process piping in oil and gas facilities
ASME Section VIII is used for pressure vessels in oil and gas industry
ASME B31.4 is for liquid pipelines in oil and gas industry
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
posted on 10 Oct 2024
posted on 30 Apr 2021
I applied via Walk-in and was interviewed in Apr 2021. There was 1 interview round.
Precast structures are pre-made concrete elements used in construction.
Precast segments are manufactured off-site and transported to the construction site for assembly.
They are commonly used in bridge construction, tunnels, and other large-scale infrastructure projects.
Precast segments can be designed to fit specific project requirements, reducing construction time and costs.
They offer high durability and strength, and...
Segment casting can be done using various methods depending on the material and application.
One method is sand casting, where a mold is created using sand and the molten metal is poured into it.
Another method is investment casting, where a wax pattern is created and coated with ceramic before the metal is poured.
Die casting is a method where molten metal is forced into a mold under high pressure.
Continuous casting is u...
Grade of concrete refers to its strength and durability.
Grade of concrete is denoted by a number followed by 'M' which stands for mix.
The number represents the compressive strength of concrete in megapascals (MPa).
Common grades of concrete include M10, M20, M30, etc.
Higher grade concrete has higher strength and durability.
For example, M20 grade concrete has a compressive strength of 20 MPa.
Design mix of concrete refers to the proportion of materials used in making concrete.
Design mix is determined based on the strength and durability requirements of the concrete.
The mix includes cement, water, aggregates (sand, gravel, crushed stone), and sometimes admixtures.
The proportions of each material are specified in terms of weight or volume.
For example, a common mix for general use is 1:2:3 (cement:sand:gravel)...
Segment casting is a method of casting concrete segments for tunnel lining.
Segments are cast in a factory and transported to the tunnel site.
Segments are then assembled to form a complete tunnel lining.
This method is commonly used in tunnel construction projects.
It allows for faster construction and better quality control.
Examples include the Channel Tunnel and the SMART Tunnel in Malaysia.
Junior Engineer
167
salaries
| ₹1.4 L/yr - ₹3.9 L/yr |
Executive Production
29
salaries
| ₹3 L/yr - ₹10.1 L/yr |
Senior Executive
26
salaries
| ₹6.9 L/yr - ₹17 L/yr |
Sales Engineer
22
salaries
| ₹3 L/yr - ₹8 L/yr |
Production Engineer
22
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Navayuga Engineering Company
B.L. Kashyap & Sons